Fractional Inch to Decimal and Millimetre Conversion Chart
Drawings, purchase orders and tooling catalogues still mix fractional inches, decimal inches and millimetres. This chart lists every 1/32 inch step with its decimal inch and exact millimetre value so you can check a size without opening a calculator.
| Fraction (inch) | Thirty-seconds | Decimal inch | Millimetres |
|---|---|---|---|
1/32 | 1 | 0.0313 | 0.7938 |
1/16 | 2 | 0.0625 | 1.5875 |
3/32 | 3 | 0.0938 | 2.3812 |
1/8 | 4 | 0.125 | 3.175 |
5/32 | 5 | 0.1563 | 3.9688 |
3/16 | 6 | 0.1875 | 4.7625 |
7/32 | 7 | 0.2188 | 5.5562 |
1/4 | 8 | 0.25 | 6.35 |
9/32 | 9 | 0.2813 | 7.1438 |
5/16 | 10 | 0.3125 | 7.9375 |
11/32 | 11 | 0.3438 | 8.7313 |
3/8 | 12 | 0.375 | 9.525 |
13/32 | 13 | 0.4063 | 10.3188 |
7/16 | 14 | 0.4375 | 11.1125 |
15/32 | 15 | 0.4688 | 11.9063 |
1/2 | 16 | 0.5 | 12.7 |
17/32 | 17 | 0.5313 | 13.4938 |
9/16 | 18 | 0.5625 | 14.2875 |
19/32 | 19 | 0.5938 | 15.0813 |
5/8 | 20 | 0.625 | 15.875 |
21/32 | 21 | 0.6563 | 16.6688 |
11/16 | 22 | 0.6875 | 17.4625 |
23/32 | 23 | 0.7188 | 18.2562 |
3/4 | 24 | 0.75 | 19.05 |
25/32 | 25 | 0.7813 | 19.8438 |
13/16 | 26 | 0.8125 | 20.6375 |
27/32 | 27 | 0.8438 | 21.4313 |
7/8 | 28 | 0.875 | 22.225 |
29/32 | 29 | 0.9063 | 23.0187 |
15/16 | 30 | 0.9375 | 23.8125 |
31/32 | 31 | 0.9688 | 24.6063 |
1 | 32 | 1 | 25.4 |
Millimetres use the exact definition 1 inch = 25.4 mm. Values are rounded for display only. For fractions in 64ths, double the numerator and denominator ratio: 1/64 inch is 0.015625 inch or 0.3969 mm.
Check unit conversions in your ERP data
Send us a sample of your item and UoM tables and we will review where inch and metric conversions disagree.
Optional. The tool and every export work without this. No spam.
How to use the chart
Type a fraction, a decimal or a millimetre value into the search box to find the nearest row. Use the decimal column when programming a CNC control or filling a decimal-inch drawing, and the millimetre column when ordering from a metric supplier. Export to Excel or CSV if you want to paste it into a tool crib list or an ERP unit-of-measure review. Remember that a stock size like 5/8 inch bar is a nominal size and the supplier tolerance still applies to the actual diameter.
The method behind the numbers
Decimal inch equals the numerator divided by the denominator. Millimetres equal decimal inches multiplied by 25.4, which is exact since the 1959 international yard and pound agreement. Every value here is computed from the count of thirty-seconds, so there is no hand-typed rounding drift. The table therefore matches what a spreadsheet or a controller would compute, which matters when two departments each convert the same dimension.
- 1/32 inch = 0.03125 inch = 0.79375 mm
- 1/16 inch = 0.0625 inch = 1.5875 mm
- 1/8 inch = 0.125 inch = 3.175 mm
- 1/2 inch = 0.5 inch = 12.7 mm
Common mistakes
The most frequent errors are rounding a converted size before applying a tolerance, treating a nominal fraction as a precision dimension, and converting a fraction like 5/16 to 0.31 instead of 0.3125 and then losing 0.0025 inch. Another is mixing fractional drill sizes with letter and number drill series, which are different tables. Keep full precision during calculation and round only the final stated dimension to the number of places the drawing tolerance supports.
Frequently Asked Questions
What is 5/8 inch in decimal and mm?
5/8 inch is 0.625 inch, which is 15.875 mm. It is 20 thirty-seconds, so the chart shows it at row 20. Many metric suppliers will quote 16 mm as the nearest standard size, which is 0.125 mm larger.
Is the 25.4 factor exact?
Yes. One inch is defined as exactly 25.4 millimetres. Any rounding you see in the chart is a display choice only, not an approximation in the conversion factor itself.
Can I use this for drill sizes?
Only for fractional drills. Number drills (#1 to #80) and letter drills (A to Z) have their own decimal sizes that do not follow thirty-second steps, so use a drill size chart for those.
How do I get 64th inch values?
Divide the numerator by 64 for the decimal inch and multiply by 25.4 for millimetres. For example 5/64 inch is 0.078125 inch or 1.9844 mm. The 32nd values in this chart are every second 64th.
If your item master stores sizes in more than one unit and the conversions drift between purchasing and the shop floor, we can help audit and automate the check inside your ERP.
Related Tools
Steel Sheet Gauge Thickness and Weight Chart
Gauge to thickness in inches and mm with calculated carbon steel weight per area.
Quality & InspectionImperial to Metric Conversion Error Prevention Checklist
A 30-point checklist for catching unit mix-ups between drawings, suppliers, ERP data, programs and inspection.
ERP OperationsUnit of Measure Conversion Reference
Searchable table of common UoM conversion factors for ERP item masters, with exact definitions where they exist.
Developer ToolsExcel CONVERT Function Engineering Unit Formula Generator
Fill a cell reference and two unit codes to get ready-to-paste CONVERT formulas, plus a torque conversion since CONVERT has no torque units.
More Engineering & PLM tools
See all- SAP Super BOM Design Worksheet
- SAP Engineering Change Number Checklist
- SAP Document Info Record Template
- SAP Change Master and Revision Level Log
- SAP Engineering Change Request (ECR) Template
- SAP BOM Usage and Item Category Reference
- SAP Engineering Change Obsolescence Exposure Calculator
- SAP Engineering Change Affected Materials Impact Worksheet
- Cloud MRP BOM Data Cleanup Worksheet
Keep exploring
Free tools
- Letter Size Drill Chart A to Z with mm EquivalentsLetter drills A through Z with decimal inch and millimetre diameters, ready to search, print or export.
- Steel Sheet Gauge Thickness and Weight ChartGauge to thickness in inches and mm with calculated carbon steel weight per area.
- Engineering Drawing Sheet Size Reference TableSearchable chart of ASME Y14.1 and ISO 5457 style drawing sheet sizes in inches and millimetres, with the nearest equivalent in the other system.