Excel CONVERT Function Formula Generator for Engineering Units
Excel's CONVERT function converts between hundreds of units without hand-typed factors, but its unit codes are easy to get wrong and it has no torque units. This generator writes the formula for your cell and units and adds torque conversions that CONVERT cannot do.
Fill in
Cell holding the value to convert
Codes are case sensitive, for example in, mm, lbm, kg, lbf, N, psi, Pa, F, C
Basic formula
=CONVERT(A2,"in","mm")
Rounded and error-safe formula
=IFERROR(ROUND(CONVERT(A2,"in","mm"),3),"Check unit codes")
Common unit codes
Length: m, in, ft, yd, mi Mass: g, kg, lbm, ozm Force: N, lbf Pressure: Pa, atm, mmHg, Torr, psi Temperature: C, F, K Volume: l, gal, qt Prefixes: k (kilo), m (milli), c (centi), u (micro), M (mega), for example kPa or mm
Torque workaround (no torque units in CONVERT)
N.m to lbf.ft: =B2*0.737562 lbf.ft to N.m: =B2*1.355818 N.m to lbf.in: =B2*8.850746 kgf.m to N.m: =B2*9.80665
Unit codes are case sensitive and the two units must be of the same type, otherwise Excel returns #N/A. Temperature conversion handles offsets correctly, unlike a plain multiplier. Verify the code list against your Excel version, since unit availability can vary by version and by installed language. Torque factors are standard conversion constants rounded to six digits.
Replace spreadsheet conversions with governed data
We can discuss moving unit conversion logic out of spreadsheets into your ERP reports.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the cell that holds your value, the unit it is in and the unit you want. Copy the basic formula into your sheet, or use the rounded, error-safe version if the sheet will be shared. The unit list shows the codes most engineers need. For a column, fill the formula down. If you receive a #N/A error, the usual causes are a wrong case in the code, a unit that does not exist, or two units that are not the same kind of quantity.
Why CONVERT is safer than typed factors
A typed factor such as 25.4 or 0.0689476 is easy to mistype or reuse in the wrong direction, and a copy of the sheet may keep the old value. CONVERT keeps the factor in one place that Excel maintains, and it handles temperature offsets properly, which a multiplier cannot. For auditable work, keep the from and to codes in cells next to the value so the sheet shows the unit pair that was used.
- Prefix letters work: kPa, mm, MPa is not supported in every build, so test
- Use IFERROR to flag bad codes
- Show the unit pair beside the result
- Round only the final answer
Limits and mistakes
CONVERT does not cover torque, so use a documented factor as shown. It also does not know about material specific units such as sheet gauge or hardness scales, which need tables. A common mistake is converting a gauge pressure to absolute pressure as if they were the same, or forgetting that lbm is a mass and lbf a force. Another is using mass for weight on a drawing or purchase order without stating which is meant.
Frequently Asked Questions
How do I convert inches to mm in Excel?
Use =CONVERT(A2,"in","mm"), which applies the exact 25.4 factor. Copy it down the column and wrap it in ROUND if you need a set number of decimal places for the drawing or purchase order.
Why does CONVERT return #N/A?
Excel returns #N/A when a unit code is spelled wrong, uses the wrong letter case, does not exist, or when the two units measure different things, such as converting a length to a mass.
Does CONVERT handle torque?
No. Use a factor instead: multiply N.m by 0.737562 to get lbf.ft, or by 8.850746 to get lbf.in. Document the factor in the sheet so the next user can check it.
Can CONVERT convert Celsius and Fahrenheit?
Yes. =CONVERT(A2,"C","F") handles the offset as well as the scale, so 100 C returns 212 F. A simple multiplier would give the wrong answer for temperature.
If conversion logic is repeated in many spreadsheets around your ERP, we can help move it into governed ERP data and reports so one factor serves everyone.
Related Tools
Fastener Torque Spec Conversion Log Worksheet
Record each fastener torque once in ft-lb and get N-m, in-lb and kgf-m for work instructions across plants and suppliers.
Developer ToolsItem UoM Conversion Integrity SQL Query Generator
Three read-only SQL checks for missing, invalid and non-reciprocal item UoM conversion factors using your own table and column names.
ERP OperationsUnit of Measure Conversion Reference
Searchable table of common UoM conversion factors for ERP item masters, with exact definitions where they exist.
Quality & InspectionImperial to Metric Conversion Error Prevention Checklist
A 30-point checklist for catching unit mix-ups between drawings, suppliers, ERP data, programs and inspection.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- Excel Timesheet and Overtime Formula GeneratorCreates ready-to-paste Excel formulas for night-shift hours, unpaid breaks, rounding, daily and weekly overtime, and gross pay.
- Manufacturing Cost Calculator (Per Unit, With Formula)Calculate total manufacturing cost per unit from materials (with scrap), labor, setup and overhead, see the price at your target margin, and chart cost vs batch size.
- Torque Conversion CalculatorConvert any torque value between Newton-metres, pound-feet, pound-inches, kgf-m, kgf-cm, ounce-inches and Newton-centimetres.
ERP fixes and how-tos
- Conversion Factor Session in Infor LN: Setup and Common ErrorsHow unit conversion factors work in Infor LN: general factors versus item-specific factors, where to maintain them and how to fix missing conversion factor errors.
- Epicor Function Examples: Update a Table, Call It, Schedule ItWorked Epicor Kinetic Function examples: updating a table, calling a function from a BPM, Application Studio or REST, and scheduling a recurring run.
- How to create and call an Epicor FunctionHow to create Epicor Functions in Function Studio: define inputs and outputs, write the C# widget, test, then call the function from a BPM directive.
Guides
- LLM Integration Patterns for Enterprise ERP SystemsIntegrate large language models with enterprise ERP systems using RAG, fine-tuning, function calling, and prompt engineering patterns for production deployment.
- AI-Powered Chemical Manufacturing with Infor M3Optimize Infor M3 for chemical manufacturing with AI. Batch management, formula optimization, regulatory compliance, and yield improvement.
- Wire Harness Drawing to BOM: Automating the ConversionConvert harness drawings, PDFs and from-to tables into a structured BOM and wire list: what can be automated, error checks, and human review.
AI on your ERP
- Infor M3 AI for Chemical Manufacturers: Formulas, Batches and Safety DataPrivate AI on Infor M3 for chemicals: formula and potency, batch genealogy, SDS and REACH data, hazardous goods, co-products and yield, on-prem or private.
- AI for ERP in Chemicals and Batch Process ManufacturingAI on the ERP of a chemicals or batch process plant: formula and yield analysis, SDS and REACH lookups, lot traceability. Private, read-only, on-prem option.