Freight Class Density Calculator for LTL Shipments (NMFC)
LTL carriers price freight by class, and for many commodities the class follows density. This calculator turns pallet dimensions and weight into pounds per cubic foot and the matching class guideline, so you can quote and book with fewer reclass surprises.
Your numbers
Overall length including pallet and overhang.
Include the pallet height.
Gross weight including pallet and packaging.
Your results
Density is a guideline. The NMFC item number in your commodity listing can set a fixed class or density brackets that differ from this scale, and the carrier tariff and any reclassification or inspection result decide the billed class.
Density vs piece weight
Sweeps Weight (per piece) from 100 to 2000, holding your other inputs fixed.
Automate class and cube capture
Optional: we can review how pallet cube and weight flow from your ERP to carrier rating and suggest where to cut manual keying.
Optional. The tool and every export work without this. No spam.
How to use it
Measure each handling unit at its widest points, including the pallet and any overhang, because carriers bill the footprint they must load. Enter length, width and height in inches, the gross weight per piece in pounds, and the number of identical pieces. The calculator converts cubic inches to cubic feet, divides weight by volume and then reads the class from the density scale. For mixed pallets, calculate each unit separately.
The formula and the scale
Density equals total weight in pounds divided by total cubic feet, where cubic feet is length times width times height in inches divided by 1,728. The classic scale runs from class 400 for under 1 pcf down to class 50 for 50 pcf and above. The steps in between are 300, 250, 175, 125, 100, 92.5, 85, 70, 65, 60 and 55. Lower classes cost less per hundredweight, so dense freight ships cheaper per pound.
- Under 1 pcf: class 400
- 8 to under 10 pcf: class 100
- 15 to under 22.5 pcf: class 70
- 50 pcf and above: class 50
Worked example
Two pallets, each 48 by 40 by 52 inches and 620 pounds, give 2 x 99,840 cubic inches, about 115.6 cubic feet. Total weight is 1,240 pounds, so density is about 10.7 pcf and the guideline class is 92.5. If the pallet were stacked 12 inches higher the density would drop and the class could move to 100 or 110 depending on the tariff, so height discipline at the dock pays directly.
Common mistakes
Measuring the product instead of the pallet, forgetting overhang, and using net rather than gross weight all understate the class. Some commodities carry a fixed class in their NMFC listing regardless of density, so check the item first. Rounding dimensions down rather than up is a common cause of reweigh and reclassification fees. Record the measured cube in your ERP shipping record so the billed class can be reconciled with the invoice.
Frequently Asked Questions
Is freight class only about density?
No. NMFC class is set from four factors: density, stowability, handling and liability. Many commodities use density brackets, but others have a fixed class in their listing. Use this calculator as a guideline and confirm the NMFC item number for your product with your carrier or the current NMFC publication.
Why did the carrier change my freight class?
Carriers inspect, weigh and measure freight and can reclassify when the declared cube or weight is wrong. Under-declared dimensions are the most common cause. Provide measured dimensions and gross weight on the bill of lading and keep photos or dock scale tickets as evidence for disputes.
How do I calculate density for several different pallets?
Compute the cubic feet of each handling unit, add the volumes, add the weights, and divide the total weight by the total volume. Carriers may rate mixed shipments by the lowest density class or by line item, depending on the tariff, so ask how they treat multiple lines.
Does this work for parcel or air freight?
No. Parcel and air carriers use dimensional weight, which compares actual and volumetric weight with a divisor. See the dimensional weight calculator for that method. Freight class applies to US LTL shipments rated under the NMFC.
If you keep pallet dimensions and weights in your ERP but still key them into carrier portals by hand, Netray can help automate the class and cube hand-off.
Related Tools
Dimensional Weight Calculator
Compare actual and volumetric weight with the carrier divisor to see the billable weight per carton and per shipment.
Supply Chain & InventoryBill of Lading Field Checklist
A field-by-field check of an ocean or domestic bill of lading so errors are caught before the cargo sails.
Supply Chain & InventoryContainer Loadability CBM Calculator
Estimate cartons per container using carton CBM, packing efficiency and payload so you know whether you cube out or weigh out.
Supply Chain & InventoryPacking List Template for Export Shipments
Generate a packing list that lists each package with contents, weights, dimensions and marks, matching your invoice and bill of lading.
More Supply Chain & Inventory tools
See all- US Import Landed Cost with Section 232 and 301 Tariffs Calculator
- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
Keep exploring
Free tools
- Truckload Freight Cost per Pallet CalculatorSee what a truckload costs per pallet, whether you are limited by space or weight, and the price of an under-filled trailer.
- Sheet Metal Density and Weight per Area ReferenceDensity and weight per area per millimetre of thickness for steel, stainless, aluminum, copper, brass and titanium sheet.
- Plate Order Weight, Freight and Truckload CalculatorWork out total weight, material cost, freight and number of truckloads for an order of steel or aluminum plates.
ERP fixes and how-tos
- SYSPRO Landed Cost Tracking: Freight, Duty and AllocationHow landed cost tracking works in SYSPRO: freight and duty, allocation methods, GRN receipts, and the effect on inventory valuation. A practical setup checklist.
- Freight Cost in SAP MM: Planned and Unplanned Delivery CostsHow to handle inbound freight in SAP MM: planned delivery costs on the PO, freight condition types, unplanned costs in MIRO, and the GR/IR and stock impact.
- Landed cost in SAP MM: planned and unplanned delivery costsHandle freight, duty and delivery costs in SAP MM: planned vs unplanned delivery costs, condition types, GR/IR posting and the effect on material valuation.
Runs with your ERP
- Embedded SAP Transportation Management in S/4HANAHow embedded SAP Transportation Management in S/4HANA handles freight planning, carrier selection, tendering and settlement, plus pitfalls and AI use.
- Oracle Transportation Management with JD Edwards: Freight Planning IntegrationHow Oracle Transportation Management integrates with JD Edwards: staging tables, GLogXML over HTTP, ship confirm and freight vouchers, plus pitfalls and AI use.
Guides
- IPC-A-610 Class 2 vs Class 3: How It Affects Your PCBA QuoteHow the IPC class requirement changes PCBA cost and risk: inspection time, rework limits, training, documentation, and how EMS shops should price Class 3.
- How to Configure Shipping Parameters in Infor SyteLineStep-by-step guide to configuring shipping parameters in Infor SyteLine. Set up ship via codes, freight terms, packing slip formats, and shipping integration.
- How to Write IDO Extension Classes in SyteLineLearn how to write IDO extension classes in Infor SyteLine using C# and .NET to add custom business logic, validation rules, and data processing to your ERP system.
Software
- SAP Transportation ManagementWhat SAP Transportation Management (SAP TM) does: freight orders, planning, charge management and settlement, plus S/4HANA integration and alternatives.
- MercuryGateWhat MercuryGate TMS does: multimodal transportation planning, execution, freight audit and visibility, with integrations, strengths and alternatives.