Supply Chain & InventoryFree calculatorPDF, Excel, Word exportUnited States

US Import Landed Cost Calculator with Section 232 and 301 Tariffs

A quote in the supplier's currency is never the cost to put the part on your dock. This calculator adds the ordinary duty, additional tariffs on top, customs user fees, freight and broker charges to get a defensible landed cost per shipment.

Your numbers

$

Transaction value, excluding international freight and insurance for US entry.

$
%

From the HTS line for your classification.

%

Ad valorem rate for formal entries, subject to a minimum and maximum per entry.

$
$
%

Set to 0 for air or land shipments.

$

Your results

Total duties and government fees
$69,964
Total landed cost
$333,764
Normal duty
$6,500
Additional tariffs
$62,500
Merchandise processing fee
$652
Harbor maintenance fee
$313
Landed cost uplift over goods value
33.5%

Tariff programs change often and can stack, exclude or overlap by product and origin. Confirm the HTS classification, current rates, any exclusions and the valuation basis with a licensed customs broker. MPF minimum and maximum are indexed yearly.

Free, optional. Reopen it on any device.
Save results:

Landed cost and total duties vs additional tariff rate

Sweeps Additional tariff rate, combined from 0 to 100, holding your other inputs fixed.

Tariff re-costing for open purchase orders

Optional: we can scope an ERP report that re-costs open POs when duty rates change.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the customs value of the goods, the international freight, and the ordinary duty rate from the HTS line for your classification. Choose a combined additional tariff rate if your product and country of origin attract Section 232, Section 301 or other additional duties. Leave the customs fee defaults or update them for the current fiscal year. The chart sweeps the additional tariff from zero to 100 percent, which helps buyers see how a change in policy moves landed cost before they commit to a purchase order.

Method

Duties are an ad valorem percentage of customs value, not of freight, for most US entries. The Merchandise Processing Fee is a percentage of value, bounded by a minimum and maximum per formal entry. The Harbor Maintenance Fee is charged on ocean cargo only. Landed cost is goods value plus freight plus duties plus fees plus broker and drayage charges.

  • Duty = customs value x (normal rate + additional rate)
  • MPF = clamp(value x rate, minimum, maximum)
  • HMF = value x rate, ocean shipments only
  • Landed = goods + freight + duty + fees + broker

Worked example and common mistakes

On 250,000 of goods with 2.6 percent duty and 25 percent additional tariff, duty is 6,500 plus 62,500. MPF is 866, which is capped at 651.50, and HMF is 312.50. Fees and duties sum to 70,000, so with 12,000 freight and 1,800 broker charges the landed cost is about 333,800, an uplift near 33.5 percent. Mistakes include applying duty to freight-inclusive value, assuming tariff programs never stack, forgetting HMF on ocean cargo, and loading landed cost into inventory at the wrong time.

Landed cost in the ERP

ERPs carry landed cost as cost elements on the receipt. Examples are SAP delivery costs in purchasing conditions, NetSuite landed cost categories, and Dynamics 365 charges. Keep duty rates in a table you can change when policy changes, so open purchase orders can be re-costed in bulk.

Frequently Asked Questions

Are Section 232 and 301 tariffs added to normal duty?

Generally yes. They are additional duties on top of the ordinary rate for covered products and origins, and they are assessed on customs value. Overlap rules and exclusions vary by action, so confirm on the HTS and in the broker's entry summary.

Why is the MPF capped?

For formal entries the Merchandise Processing Fee is a percentage of value subject to a statutory minimum and maximum per entry, adjusted each fiscal year. That is why large shipments pay a smaller effective percentage than small ones.

Does freight count in customs value?

For most US entries international freight and insurance are not dutiable, because the value is based on the price actually paid, usually without those charges. The tool treats freight as separate. Confirm with your broker if terms are unusual.

Can I use this for air freight?

Yes. Set the harbor maintenance fee to zero because it applies to ocean cargo only, and enter your air freight charge in the freight field. The MPF still applies to formal air entries.

If you want open purchase orders re-costed automatically when a tariff rate changes, we can scope an ERP report or agent for it.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring