Garment Care Symbols Chart: ISO 3758 Wash, Bleach, Dry, Iron and Professional Care
A wrong care label means returns, claims and failed buyer audits. This reference lists the standard wash, bleach, dry, iron and professional care symbols in plain words so merchandisers and quality teams can check labels quickly.
| Group | Symbol description | Meaning | Note |
|---|---|---|---|
Washing | Wash tub with 30 | Machine wash, maximum 30 C | Number is the maximum water temperature in C |
Washing | Wash tub with 40 | Machine wash, maximum 40 C | Most common setting for everyday garments |
Washing | Wash tub with 50 | Machine wash, maximum 50 C | |
Washing | Wash tub with 60 | Machine wash, maximum 60 C | Typical for white cotton and bed linen |
Washing | Wash tub with 70 | Machine wash, maximum 70 C | |
Washing | Wash tub with 95 | Machine wash, maximum 95 C | Boil wash for robust cotton |
Washing | Wash tub with one bar underneath | Mild process, reduced agitation | Applies to the temperature shown |
Washing | Wash tub with two bars underneath | Very mild process, strongly reduced agitation | For delicate items |
Washing | Wash tub with hand | Hand wash only, maximum 40 C | Do not machine wash |
Washing | Crossed-out wash tub | Do not wash | |
Bleaching | Empty triangle | Any bleaching agent allowed | Includes chlorine bleach |
Bleaching | Triangle with two diagonal lines | Non-chlorine bleach only | Oxygen-based bleach |
Bleaching | Crossed-out triangle | Do not bleach | |
Tumble drying | Square with circle and one dot | Tumble dry at low temperature | |
Tumble drying | Square with circle and two dots | Tumble dry at normal temperature | |
Tumble drying | Crossed-out square with circle | Do not tumble dry | |
Natural drying | Square with curved line at top | Line dry | |
Natural drying | Square with vertical lines | Drip dry | |
Natural drying | Square with horizontal line | Dry flat | Prevents stretching of knits |
Ironing | Iron with one dot | Iron at low temperature, sole plate up to 110 C | Steam may damage the fabric |
Ironing | Iron with two dots | Iron at medium temperature, sole plate up to 150 C | |
Ironing | Iron with three dots | Iron at high temperature, sole plate up to 200 C | |
Ironing | Crossed-out iron | Do not iron | |
Professional care | Circle with P | Professional dry cleaning with specified solvents | Tetrachloroethylene and hydrocarbon solvents |
Professional care | Circle with F | Professional dry cleaning with hydrocarbon solvents | |
Professional care | Circle with W | Professional wet cleaning | |
Professional care | Crossed-out circle | Do not dry clean |
Based on the ISO 3758 symbol system (as used under the GINETEX scheme). North American labeling follows different rules, such as ASTM D5489 symbols and the written instructions required under the US Care Labeling Rule. Check the destination market requirements before you finalize labels.
Style and label data review
Optional: a review of how care instructions and style revisions are linked to your bill of materials.
Optional. The tool and every export work without this. No spam.
How to use the table
Filter by group to see only washing or only ironing symbols, or search for a number such as 40 or a word such as bleach. Use the table to proofread care label artwork before approval and to translate symbols into the text a buyer's tech pack requires. Export the rows to Excel if you keep a master care label library by style.
- Washing tub number is maximum temperature in C
- Bars under a symbol mean a milder process
- Dots on an iron or dryer mean low, medium or high heat
- Circles refer to professional cleaning, not home care
Choosing the right instruction
The care instruction must be the most severe treatment the product, including trims, linings and prints, can survive, tested against the matching wash and dry test method. If a garment passes at 40 C but its interlining bubbles at 60 C, the label says 40. Specify the care symbols for each component in the tech pack and run wash tests on the finished garment, not only the fabric, so that dimensional change, color transfer and trim failures show up.
Common mistakes
Reading the order of the five symbols wrongly is common: the sequence is wash, bleach, dry, iron, professional care. Another mistake is printing symbols without the local-language text some markets expect. Finally, labels copied from an old style often outlive a fabric change, so tie the care label to the bill of materials revision.
- Symbol order is wash, bleach, dry, iron, professional care
- Check whether the destination needs text as well as symbols
- Update the label when the fabric or trim changes
Frequently Asked Questions
What do the numbers in the wash tub mean?
The number inside a wash tub is the maximum water temperature in degrees Celsius for that wash. A tub with 40 allows a machine wash up to 40 C. Bars under the tub mean the machine should use a milder, lower-agitation program.
What do the dots on an iron symbol mean?
The dots show the heat setting. One dot is low, with a sole plate up to about 110 C. Two dots is medium, up to about 150 C. Three dots is high, up to about 200 C.
What do the letters in the dry cleaning circle mean?
P means professional dry cleaning with specified solvents including tetrachloroethylene and hydrocarbon solvents. F means hydrocarbon solvents only. W means professional wet cleaning. A crossed-out circle means do not dry clean.
Are these symbols used in the United States?
The ISO symbols are used across Europe and many other markets. In the United States, care labels follow ASTM D5489 symbols with the Care Labeling Rule requirements, so confirm what your destination market requires before you print labels.
If care labels, wash tests and style revisions are managed in separate files, we can show how to tie them to your ERP bill of materials and item revisions.
Related Tools
Textile Fiber Properties Reference (Density, Regain, Thermal)
Look up density, standard moisture regain and melting or degradation behaviour for the common natural, regenerated and synthetic fibers.
Industry TemplatesISO 4915 Stitch Types Reference for Sewing
Searchable list of the common ISO 4915 stitch numbers with class, thread count, machine type and where each is used in garments.
Industry TemplatesGarment Tech Pack Specification Template
A fill-in tech pack that gives the sewing floor and the buyer one agreed specification for a style, exportable to PDF or Word.
MES & Shop FloorFabric Roll Barcode Label ZPL Generator
Generate ZPL II code for a 4 inch fabric roll label with item, lot, width, length and a Code 128 roll ID barcode.
More Industry Templates tools
See all- Fabric Consumption Calculator
- Textile and Apparel Plant ERP Readiness Assessment
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
- Sheet Metal Job Traveler Template
- Press Brake Setup Sheet Template
- Sheet Metal Cut List and Material Takeoff Worksheet
Keep exploring
Free tools
- AWS Welding Symbols ReferenceSearchable lookup of the elements of a welding symbol: where each element sits, what it means and common reading mistakes.
- Garment Costing WorksheetEditable cost sheet for a single style: fabric, trims, cut-make-trim, packing and overhead with wastage per line and a quote price.
- Garment Size Grade Spec WorksheetAn editable size chart that builds S, M, L and XL measurements from a base size and grade increment per point of measure.
Guides
- Factory KPI Dashboard Design: 7 Rules for Dashboards People Actually UseFactory KPI dashboard design in 7 rules: pick metrics by audience, define each KPI, limit tiles, drill to the source row, show data freshness, and track usage.
- Infor M3 Fashion Edition: Style-Color-Size Matrix, PLM Integration, and Seasonal PlanningConfigure Infor M3 for fashion and apparel. Style-color-size matrix, PLM integration, seasonal planning, and garment costing in M3 Fashion edition.
AI on your ERP
- AI on Your ERP for Textile and Apparel ManufacturingPrivate AI on your ERP for textile and apparel makers: style-color-size matrices, lot dyeing, cut plans, TNA calendars and buyer compliance, kept on your own systems.
- NetSuite AI for Cosmetics and Personal Care: MoCRA Records, Formula Changes and Batch TraceAI on NetSuite for cosmetics and personal care: MoCRA records, formula and batch trace, ingredient changes, PAO and shelf life, from private ERP data.