MES & Shop FloorFree generatorPDF, Excel, Word exportTextile and Apparel

Fabric Roll Barcode Label ZPL Generator for Zebra Printers

A readable, scannable roll label is what keeps fabric from being lost in a warehouse. This generator builds ZPL II code for Zebra-compatible printers, with item, lot, width, length and a Code 128 roll ID barcode.

Fill in

Generated code
Free, optional. Reopen it on any device.
Download:

Single 4 x 3 inch label at 203 dpi

^XA
^PW812
^LL609
^CI28
^CF0,36
^FO40,30^FDAcme Textiles Ltd^FS
^CF0,30
^FO40,90^FDItem: CTN-POP-120-WHT^FS
^FO40,140^FDLot: LOT-24-0815^FS
^FO40,190^FDWidth: 150 cm^FS
^FO40,240^FDLength: 62.5 m^FS
^BY3,3,130
^FO40,320^BCN,130,Y,N,N^FDR0008841^FS
^XZ

Reprint two copies

^XA
^PQ2
^PW812
^LL609
^CF0,30
^FO40,40^FDItem: CTN-POP-120-WHT^FS
^FO40,90^FDRoll: R0008841^FS
^BY3,3,130
^FO40,160^BCN,130,Y,N,N^FDR0008841^FS
^XZ

Coordinates assume a 203 dpi printer and a 4 x 3 inch label, where ^PW812 sets the print width in dots and ^LL609 the label length. For 300 dpi printers, scale the dot values by about 1.5. Send the code to the printer as raw text, and test one label on your stock before printing a batch. Fields with special characters such as the caret or tilde may need escaping.

Label printing from ERP transactions

Optional: a review of how to print roll and carton labels directly from receiving and production transactions.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill the fields with your roll data and copy the code from the first block. Send it to the printer as raw text through the printer port, a print spooler set to raw mode, or a labeling tool. The barcode encodes the roll ID, so a scan at receiving, cutting and issue can look up item, lot and quantity from your inventory system. The second block reprints a label with a quantity command.

  • Send as raw text, not through a graphics driver
  • Barcode holds the roll ID only
  • Keep item, lot, width and length readable for people
  • Use the reprint block for damaged labels

What the ZPL commands do

Every label starts with ^XA and ends with ^XZ. ^PW sets print width and ^LL sets label length in dots. ^CF sets the default font and size. ^FO places a field origin, and ^FD ... ^FS holds the data. ^BY sets bar width and ratio, and ^BC prints Code 128. ^PQ sets the quantity of copies. At 203 dpi, one inch is 203 dots, so a 4 inch label is about 812 dots wide.

Common mistakes and ERP notes

The most common faults are barcodes too small or too close to the edge for the scanner, and printing to a driver that rescales the code. Store the roll ID as the key to your inventory record, and make sure the lot on the label matches the lot in the ERP, because shade variation between dye lots is the main reason fabric is segregated. Test scanning at the real warehouse distance.

  • Leave quiet space on both sides of the barcode
  • Match the lot on the label to the ERP lot
  • Print a test label per stock before each run

Frequently Asked Questions

What is ZPL?

ZPL, or Zebra Programming Language, is a text command language that Zebra and many compatible label printers use. You send plain text commands to the printer, and it draws text and barcodes at the positions you specify.

Why is my label printing off to one side?

The print width, label length or origin values likely do not match your stock or printer resolution. Check that the ^PW and ^LL values match the label size at your dpi, and run the printer's media calibration.

Which barcode type should I use for roll IDs?

Code 128 is a common choice because it is compact, supports letters and digits and is read by nearly every scanner. Keep the roll ID short to keep bars wide enough to scan reliably.

How do I print many labels at once?

Use ^PQ for copies of the same label. For unique roll IDs, generate one ^XA to ^XZ block per roll, usually from your ERP or a script, and send the whole file to the printer in one job.

If roll labels are typed by hand or printed from separate files, we can show how to print them straight from receiving transactions in your ERP.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP