GD&T Symbols Reference Table and Meanings
GD&T is a symbolic language on engineering drawings that controls the form, orientation, location and runout of features. This table lists the 14 geometric characteristic symbols and the common modifiers, with the category, datum requirement and tolerance zone shape for each.
| Symbol / characteristic | Category | What it controls | Datum reference | Tolerance zone |
|---|---|---|---|---|
Straightness | Form | Line elements or a derived axis | Never | Two parallel lines, or a cylinder when applied to an axis with a diameter symbol |
Flatness | Form | Surface flatness | Never | Two parallel planes |
Circularity (roundness) | Form | Each circular cross section | Never | Two concentric circles in each section |
Cylindricity | Form | Whole cylindrical surface: round, straight, taper | Never | Two coaxial cylinders |
Profile of a line | Profile | 2D profile at cross sections | Optional | Boundary band of constant width along a line profile |
Profile of a surface | Profile | 3D surface shape, can also control size and location | Optional | Boundary band of constant width around the true surface |
Angularity | Orientation | Surface or axis at a stated angle other than 90 degrees | Required | Two parallel planes at the basic angle |
Perpendicularity | Orientation | Surface or axis at 90 degrees to a datum | Required | Two parallel planes, or a cylinder for an axis |
Parallelism | Orientation | Surface or axis parallel to a datum | Required | Two parallel planes, or a cylinder for an axis |
Position | Location | Location of features of size such as holes, slots, pins | Usually required | Cylinder with diameter symbol, or two parallel planes for a slot |
Concentricity | Location | Median points of a feature about a datum axis | Required | Cylinder about the datum axis (removed from ASME Y14.5-2018) |
Symmetry | Location | Median points of a feature about a datum plane | Required | Two parallel planes about the datum plane (removed from ASME Y14.5-2018) |
Circular runout | Runout | Each circular element as the part rotates on the datum axis | Required | Full indicator movement at each cross section |
Total runout | Runout | Entire surface as the part rotates on the datum axis | Required | Full indicator movement over the whole surface |
Maximum material condition (MMC) | Modifier | Tolerance applies at the size with the most material; bonus tolerance as size departs from it | n/a | Applied to the feature or to a datum reference |
Least material condition (LMC) | Modifier | Tolerance applies at the size with the least material; bonus tolerance as size departs from it | n/a | Applied to the feature or to a datum reference |
Regardless of feature size (RFS) | Modifier | Default under ASME Y14.5-2009 and later: the tolerance does not change with feature size | n/a | No bonus tolerance |
Projected tolerance zone | Modifier | Extends the zone above the part to control a mating fastener or pin | n/a | Zone height is stated after the symbol |
Diameter symbol in a tolerance frame | Modifier | Makes the zone cylindrical instead of two planes | n/a | Cylindrical |
Free state | Modifier | Tolerance applies with restraint forces removed, used for flexible parts | n/a | Applied to the feature |
Tangent plane | Modifier | The tolerance applies to the plane touching the high points of the surface | n/a | Applied to the feature |
Statistical tolerance | Modifier | Allows statistical process control to verify the tolerance | n/a | Applied to the feature |
Summary for quick reference, not a substitute for ASME Y14.5 or ISO 1101. Rules differ between the two standards, notably on envelope principle and the default material condition.
Structure GD&T data for inspection planning
Optional: talk to us about holding drawing characteristics in your ERP quality module so inspection plans stay in step.
Optional. The tool and every export work without this. No spam.
How to use this table
Search by name, category or zone shape. The category column groups symbols the way the standard does: form, profile, orientation, location and runout. Form controls never reference a datum. Orientation, location and runout controls need datums. Profile can be used either way. When you are reading a drawing, find the symbol in the first compartment of the feature control frame, then read the tolerance value, any modifier, and the datum references in priority order.
Reading a feature control frame
A frame reads left to right: the characteristic symbol, an optional diameter symbol, the tolerance value, an optional material condition modifier, then primary, secondary and tertiary datums. For example, position, diameter 0.2 at MMC, A, B, C means a cylindrical zone of 0.2 mm at the MMC size, located from datum A first, then B, then C. The datum order tells the inspector how to fix the part on the CMM or fixture, so changing the order changes the measurement.
- Form controls: straightness, flatness, circularity, cylindricity
- Orientation controls: angularity, perpendicularity, parallelism
- Location control: position, with concentricity and symmetry in older drawings
- Runout controls: circular and total
Standards differences to know
ASME Y14.5 and ISO 1101 share the symbols but not every rule. ASME Y14.5-2018 removed concentricity and symmetry, replacing them with position or profile of a surface. Under ASME, Rule 1 requires perfect form at MMC unless a note says otherwise, while ISO uses independence by default. A drawing that mixes both can be ambiguous, so state the governing standard in the title block.
Common mistakes
Frequent errors include using concentricity where position or runout is cheaper and clearer, applying flatness to a feature of size, forgetting that an MMC modifier adds bonus tolerance that the inspection plan must calculate, and omitting datums from an orientation control. Another is specifying a tight position tolerance without datums that can actually be repeated on a fixture.
Frequently Asked Questions
How many GD&T symbols are there?
There are 14 geometric characteristic symbols in ASME Y14.5 and ISO 1101 combined, grouped as form, profile, orientation, location and runout. Concentricity and symmetry were removed from ASME Y14.5-2018, but they still appear on older drawings and in ISO.
Which GD&T symbols need a datum?
Orientation, location and runout controls need datum references. Form controls never use datums. Profile of a line or surface may be used with or without datums depending on whether you want to control shape only or shape and location.
What is the difference between MMC and LMC?
MMC is the size at which a feature holds the most material, the smallest hole or largest pin. LMC is the opposite. Under either modifier the tolerance can grow as the actual size departs from that condition, giving bonus tolerance.
Why is concentricity no longer used in ASME Y14.5-2018?
Concentricity requires evaluating median points, which is hard to measure and rarely what the designer needs. Position, profile or runout controls usually achieve the function more directly and can be verified with common CMM routines.
If you want GD&T callouts captured as structured data in your ERP or PLM so inspection plans generate themselves, we can design that with you.
Related Tools
True Position Tolerance Pass/Fail Calculator
Convert measured X and Y deviations into a diametral true position value and compare it with the allowed zone, including MMC bonus.
Engineering & PLMBonus Tolerance (MMC) Position Calculator
Calculates the bonus tolerance gained as a feature departs from maximum material condition and compares the total allowed position zone to the measured error.
Engineering & PLMEngineering Drawing Review Checklist
A tickable checklist for checking a manufacturing drawing before release: title block, dimensions, tolerances, GD&T, notes and revision.
Engineering & PLMISO 2768 General Tolerances Table
Look up the default tolerance for dimensions with no individual tolerance, by size range and ISO 2768-1 class.
More Engineering & PLM tools
See all- BOM Error Cost of Poor Quality Calculator
- ISO 286 IT Tolerance Grades Table
- Bolt Circle Hole Coordinates Calculator
- Linear Thermal Expansion Calculator (Two Materials)
- Press Fit Interference Pressure and Force Calculator
- Engineering Drawing Release Request Template
- Datum Reference Frame Definition Template
- Hole and Shaft Fit Clearance Worksheet
- Tolerance Analysis Report Template
Keep exploring
Free tools
- GD&T Characteristic, Datum and Tolerance Zone ReferenceSearchable table of the 14 ASME Y14.5 geometric characteristics and key modifiers, with datum requirement, zone shape and when MMC or LMC is allowed.
- GD&T Readiness Assessment for Design TeamsScore how well your team applies GD&T and tolerancing practice, from training and standards to supplier feedback and inspection alignment.
- AWS Welding Symbols ReferenceSearchable lookup of the elements of a welding symbol: where each element sits, what it means and common reading mistakes.