Press Fit Interference Calculator (Contact Pressure, Force and Torque)
A press fit holds two parts together by friction from radial interference between the shaft and hub. This calculator applies the classical Lame thick-wall equations to estimate the contact pressure, the stress in the hub, the force to press the parts together and the torque the joint can transmit.
Your numbers
Must be larger than the fit diameter.
Largest shaft limit minus smallest hole limit gives maximum interference.
Surface peaks flatten on assembly and reduce effective interference.
Typical 0.08 to 0.15 for steel on steel, lubricated to dry.
Your results
Elastic thick-wall equations for a solid shaft and a uniform hub, with a Poisson ratio of 0.3. Real joints vary with roughness, edge effects, temperature and assembly method. Validate critical joints by test.
Contact pressure and hub stress versus interference
Sweeps Diametral interference (before smoothing) from 5 to 100, holding your other inputs fixed.
Link fit calculations to your engineering data
Optional: talk to us about keeping design calculations connected to items and routings in your ERP.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the fit diameter, hub outside diameter, engagement length and the diametral interference, which is the shaft diameter minus the hole diameter. For limits, use the maximum interference to check hub stress and the minimum interference to check holding capacity. Subtract a small roughness smoothing loss, then choose the materials and friction coefficient. The default 40 mm joint with 40 um interference gives about 80 MPa contact pressure and a press force near 60 kN. Run the min and max cases separately.
The method
For a solid shaft in a hub with the same modulus and a Poisson ratio of 0.3, contact pressure equals the radial interference per unit diameter divided by the sum of two compliance terms: the hub term with the diameter ratio factor, and the shaft term. Hub hoop stress at the bore is pressure times the sum of the squared outside and fit diameters over their difference. Force equals pressure times contact area times friction. Torque capacity is that force times half the fit diameter.
Reading the result
Check the safety factor on hub yield with the maximum interference and typical dimension and material extremes, and check slip torque against the load with the minimum interference. A safety factor under about 1.5 on yield is a warning, since heavy hubs may crack, and thin hubs flare. The press force is a guide for choosing a press, but use the larger of the pressing and withdrawal forces, and expect scatter of 30 percent or more from friction alone. Heated or cooled assembly removes the pressing force but not the hoop stress.
- Use the maximum interference for stress, the minimum for holding
- Lead-in chamfers and lubrication reduce galling
- Fatigue of the hub bore, not static yield, often governs
Common mistakes
Common mistakes are entering a radial interference as diametral, which halves the result, forgetting the roughness loss on rough finishes, using the nominal instead of the tolerance extremes, and assuming a joint with a keyway or step behaves as a plain cylinder. Also check that the hub outside diameter is realistic: the thin-walled hub case shows high stress and the formula does not capture end effects at the hub faces.
Frequently Asked Questions
How do you calculate press fit force?
Compute contact pressure from the interference using the Lame equations, then multiply by contact area and the friction coefficient. Area is pi times diameter times engagement length. This gives the force to press in or to start slipping, with a large scatter from friction.
How much interference is needed for a press fit?
A common guide for steel is H7 hole with p6 or s6 shaft, roughly 0.5 to 1.5 thousandths of the diameter in interference. The right amount depends on the load: enough to transmit torque with a margin, but not enough to yield or crack the hub.
What is the difference between press fit and shrink fit?
Both rely on interference. A press fit is assembled by force at room temperature, while a shrink fit uses heating or cooling to change the size temporarily so no pressing force is needed. The resulting pressure and stresses at room temperature follow the same equations.
Why is the diametral interference used?
Drawings and gauges work in diameters, so interference is given as shaft diameter minus hole diameter. The Lame equation then divides by the diameter to get strain. Entering a radial value by mistake would halve the pressure and give a misleading result.
If fit calculations and tolerance data sit in spreadsheets, separate from your ERP item and routing records, we can help connect them.
Related Tools
Hole and Shaft Fit Clearance Worksheet
An editable worksheet that computes minimum and maximum clearance (negative means interference) for each hole and shaft pair from their limit sizes.
Engineering & PLMISO 286 IT Tolerance Grades Table
Look up the ISO 286 standard tolerance width for grades IT5 to IT11 across nominal size ranges up to 500 mm.
Engineering & PLMLinear Thermal Expansion Calculator (Two Materials)
Find how much a part grows between two temperatures, and how much two mating materials move relative to each other.
Engineering & PLMAssembly Tolerance Stack Worst Case vs RSS Calculator
Add up the contributors in a linear stack and see the minimum gap by worst case, root-sum-square and a 1.5x modified RSS.
More Engineering & PLM tools
See all- BOM Error Cost of Poor Quality Calculator
- GD&T Symbols Reference Table
- ISO 2768 General Tolerances Table
- Bolt Circle Hole Coordinates Calculator
- Engineering Drawing Review Checklist
- Engineering Drawing Release Request Template
- Datum Reference Frame Definition Template
- Tolerance Analysis Report Template
- Bonus Tolerance (MMC) Position Calculator
Keep exploring
Free tools
- Hole and Shaft Fit Clearance WorksheetAn editable worksheet that computes minimum and maximum clearance (negative means interference) for each hole and shaft pair from their limit sizes.
- Shaft and Hole Clearance Fit Limits CalculatorType in nominal size and the hole and shaft deviations in micrometres. See minimum clearance, maximum clearance, mean clearance and whether the fit is clearance, transition or interference.
- Shaft Torque, Power and Shear Stress CalculatorConvert power and speed to torque, then check torsional shear stress, twist per meter and the minimum solid-shaft diameter for an allowable stress.
Guides
- Quoting Software for Label Printers Running Flexo and DigitalHow label converters quote pressure sensitive jobs: size, repeat, matrix, tooling and press time, where quotes go wrong, and how to speed up turnaround safely.
- Press Scheduling and Capacity Planning for Stamping PlantsSchedule stamping presses by tonnage, bed size, die readiness and coil availability, and plan capacity against customer releases without overloading the die room.