Hole and Shaft Fit Clearance Worksheet
Every fit callout reduces to four limit sizes. This worksheet turns them into minimum and maximum clearance so you can see at a glance whether a joint is a clearance, transition or interference fit, and how much it varies.
| Assembly or joint | Fit designation | Hole min (mm) | Hole max (mm) | Shaft min (mm) | Shaft max (mm) | Min clearance (negative = interference) (mm) | Max clearance (negative = interference) (mm) | Fit variation (mm) | |
|---|---|---|---|---|---|---|---|---|---|
0.007 | 0.041 | 0.034 | |||||||
0.02 | 0.074 | 0.054 | |||||||
-0.029 | 0 | 0.029 | |||||||
-0.018 | 0.023 | 0.041 |
Enter limit sizes from your drawing or from the ISO 286 / ASME B4.1 tables. Positive clearance means a gap, negative means interference. A row with min negative and max positive is a transition fit.
Connect tolerance data to your ERP
Optional review of how fit and characteristic data could sit with item and routing records.
Optional. The tool and every export work without this. No spam.
How to use the worksheet
Add one row per joint. Enter the smallest and largest hole size and the smallest and largest shaft size in millimetres. The sheet calculates minimum clearance as hole minimum minus shaft maximum, and maximum clearance as hole maximum minus shaft minimum. Edit the examples, add rows for your assemblies and export to Excel for the design record.
Reading the result
If both clearances are positive the fit always leaves a gap. If both are negative the parts always interfere, so assembly needs force, heat or cooling. If one is negative and one positive, some assemblies will interfere and some will not. The fit variation equals the hole tolerance plus the shaft tolerance, so tightening either one narrows the spread.
- Both positive: clearance fit
- Min negative, max positive: transition fit
- Both negative: interference fit
- Variation = hole tolerance + shaft tolerance
Common mistakes
Mixing up which size pairs with which is the classic error: minimum clearance uses the smallest hole against the largest shaft. Another is ignoring coatings or plating thickness, which shifts the shaft size after finish. Use the post-finish limits for the final fit check, and check the temperature if the parts are different materials.
Frequently Asked Questions
What does negative clearance mean?
Negative clearance is interference: the shaft is larger than the hole. The amount shows how much material must deform or how much force or thermal change is needed to assemble the parts.
Where do I get the limit sizes for H7/g6?
From the ISO 286 tables or ASME B4.1 for inch fits, based on the nominal size. Enter the resulting hole and shaft limits here. The examples use ISO 286 values for the stated sizes.
Does this account for surface finish or form error?
No. It uses size limits only. Surface roughness, out-of-roundness and taper reduce the effective clearance or change the interference, so leave margin for them on precision fits.
Can I use inches?
Yes. The maths is unit independent. Enter all values in inches and ignore the mm label, or convert first.
If fit and tolerance data lives in spreadsheets outside the ERP, we can talk about connecting characteristics to item and routing records.
Related Tools
Tolerance vs Process Capability Review Worksheet
A worksheet that checks each toleranced feature against measured process mean and standard deviation, returning Cp, Cpk and predicted defects per million.
Quality & InspectionTolerance Deviation and Concession Request Template
A request form for approving a measured feature that falls outside drawing tolerance, with fit, form and function assessment and customer approval fields.
Engineering & PLMBonus Tolerance (MMC) Position Calculator
Calculates the bonus tolerance gained as a feature departs from maximum material condition and compares the total allowed position zone to the measured error.
Engineering & PLMTolerance Analysis Report Template
A design review document that records the assembly requirement, analysis method, assumptions, results and decision for a tolerance study.
More Engineering & PLM tools
See all- BOM Error Cost of Poor Quality Calculator
- ISO 286 IT Tolerance Grades Table
- GD&T Symbols Reference Table
- ISO 2768 General Tolerances Table
- Bolt Circle Hole Coordinates Calculator
- Engineering Drawing Review Checklist
- Linear Thermal Expansion Calculator (Two Materials)
- Press Fit Interference Pressure and Force Calculator
- Engineering Drawing Release Request Template
Keep exploring
Free tools
- Shaft and Hole Clearance Fit Limits CalculatorType in nominal size and the hole and shaft deviations in micrometres. See minimum clearance, maximum clearance, mean clearance and whether the fit is clearance, transition or interference.
- Metric Tap Drill and Clearance Hole Size ReferenceLookup chart of metric tap drill sizes plus fine, medium and coarse clearance holes for common fasteners from M1.6 to M30.
- Press Fit Interference Pressure and Force CalculatorEstimate contact pressure, hub hoop stress, press-in force and slip torque for a solid shaft pressed into a hub.