MES & Shop FloorFree templatePDF, Excel, Word exportGE ProficyManufacturing

GE Proficy Private AI Layer Blueprint Generator

This generator turns a few facts about your GE Proficy environment into an architecture plan for a private AI layer that stays on your servers. It produces a document you can hand to IT, security and the system owner.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

GE Proficy Private AI Layer Blueprint Generator

Private AI Layer Architecture Plan: GE Proficy

Prepared for: Acme Precision Ltd System: GE Proficy (Historian, Plant Applications), Proficy Historian 2023 or newer Data store: SQL Server (Plant Applications) Hosting: On-prem server Named users: 300 across 1 site(s) Target go-live: 2027-03-01

1. Context and scope

Acme Precision Ltd wants an AI assistant that works on data held in GE Proficy (Historian, Plant Applications) without moving that data off its own infrastructure. The assistant is read-only by default. Any change to a system of record is proposed by the assistant and executed only after a named person approves it, through the system's supported interface.

Main use cases: Ask why Line 2 extruder temperature drifted last shift; summarise downtime by reason for a unit; find tags by description; draft shift summaries from events.

2. Components

ComponentDesign for GE ProficyNotes
Data access pathHistorian OLE DB provider or client SDK with a read-only service account; Plant Applications reporting copy on SQL ServerRead-only identity, reporting copy where possible
Retrieval indexRetrieval index over SOPs, control plans, tag descriptions and event comments, filtered by area, line and unitLocal vector store, metadata filters mirror permissions
Model servingOpen-weight model served with vLLM or Ollama on None yet in On-prem serverSize from users and questions per day
Tool serverTool server with get_tag_trend, get_unit_events, downtime_summary and search_proceduresApproved read actions only, parameterised
Identity and permissionsWindows or directory groups mapped to Historian security and Plant Applications line and unit accessChecked before every query and retrieval
AuditAppend-only log of user, question, tool calls, query text, rows returned and answerRetained per your records policy

3. Security controls mapped to your constraints

Data that must never leave the site: Tag values for restricted lines, batch recipes and formulations, customer-specific specifications, operator names.

Hosting mode: On-prem server. All components run inside your network boundary. No model, index or log leaves it. For air-gapped hosting, model files, container images and updates enter through your controlled media process, and outbound telemetry in the serving stack is disabled.

Least privilege: a dedicated read-only service identity, no shared accounts, and per-user scope enforced in the tool server. Every answer shows its source records or query so a user can verify it.

4. Three-phase rollout

PhaseScopeExit criteria
Phase 1: Read-only questionsCited answers on one site or line for a pilot groupAccuracy on a known question set accepted by the system owner
Phase 2: DraftsSummaries, reports and proposed records for human editingEdit rate and error types reviewed, no policy breaches in audit
Phase 3: Approved actionsWrites through the supported API or interface after named approvalApproval and rollback procedure tested, audit trail complete

5. Open questions for IT and the system owner

1. Which interface does the vendor support for read access in Proficy Historian 2023 or newer, and are there contractual limits on direct database reads? 2. Can we take a reporting copy of SQL Server (Plant Applications), and who owns refresh and retention? 3. Which user groups map to which scopes, and who maintains the mapping? 4. What is the approved model list and the process for bringing in model updates? 5. What logging retention and review cadence does our policy require? 6. Who is the accountable owner for answer quality after go-live?

Prepared by / Date
System owner / Date
IT security / Date

This is a planning starting point, not a design guarantee. Confirm interface names, versions and vendor support terms with your vendor before building. Historian answers should come from tool calls that return aggregates over a stated time window, such as average, min, max and count of out-of-range samples, with the tag name and time range shown. Plant Applications answers should come from views on a reporting copy. Whichever source is used, the model explains the result and cites the query; it does not recall numbers.

Architecture review of your plan

Optional: a short review of your exported blueprint by an engineer who has built private AI layers on this kind of system.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill in company name, version, data store and hosting mode, then describe the use cases and the data that must never leave the site. Choose the GPU line that matches what you have or expect to buy. The document updates as you type and exports to PDF or Word. Share the first draft with the system owner and IT security, and use the open questions section as the agenda for your next meeting. Expect to edit the components table once you learn what your vendor supports.

  • Start with one site or line
  • Name an owner for answer quality
  • List the data that must stay on site before you pick models
  • Use the exported file as the basis for a change request

Method behind the plan

Historian answers should come from tool calls that return aggregates over a stated time window, such as average, min, max and count of out-of-range samples, with the tag name and time range shown. Plant Applications answers should come from views on a reporting copy. Whichever source is used, the model explains the result and cites the query; it does not recall numbers.

What the plan covers

The plan has five parts: context and scope, a component table, security controls tied to your inputs, a three-phase rollout and open questions. The rollout moves from read-only questions to drafted outputs to approved actions, with exit criteria between phases. Each component is described for GE Proficy (Historian, Plant Applications) specifically, including the data access path and the permission model.

  • Data access path and identity
  • Retrieval index and tool server
  • Model serving on local GPUs
  • Audit log and retention

Common mistakes

Most failed pilots skip the permission model or the audit trail, then cannot get approval to widen use. Check the points below before you take the plan to a steering group.

  • Querying the live Historian at high frequency, which slows collection and client trends.
  • Letting the model write SQL against Plant Applications base tables instead of reviewed views.
  • Indexing procedures without area metadata so users see content outside their units.

Frequently Asked Questions

Does this plan require a cloud service?

No. Every component in the plan runs inside your network: the data access path, the retrieval index, the model serving on your GPUs, the tool server and the audit log. Air-gapped hosting is a supported option.

Is the assistant able to change data?

Not by default. The plan is read-only. Writes are proposed by the assistant and executed only after a named person approves, through the system's supported interface, and the audit log records the proposal and the approval.

How do I pick the GPU line?

Pick what you have or plan to buy, then check it with the sizing calculator for this system. A 24 GB class GPU suits small models and few users. More users or larger models need more memory or more GPUs.

Can I edit the document?

Yes. Edit the fields and export to Word. The component table and the open questions are the parts most worth tailoring once your vendor confirms which interfaces it supports for your version.

If you want a second pair of eyes on this plan, Netray designs and builds private, on-prem AI layers over systems like this, read-only by default.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring