GSM Calculator, Fabric Kg to Meter and GSM to Oz Converter
This GSM calculator is also a fabric kg to meter converter and a GSM to oz calculator: enter a sample weight and the fabric width to get metres per kg and ounces per square yard. GSM, grams per square metre, is the number everyone quotes when buying or selling fabric. This calculator turns a weighed sample into GSM and then into the figures purchasing and logistics actually use: ounces per square yard, grams per metre, metres per kilogram and roll weight.
Your numbers
Weight of the cut sample after conditioning.
A standard round cutter gives 100 cm2.
Your results
Results depend on sample accuracy. Test per your agreed method, for example round cutter sampling at several roll positions.
Metres per kg vs sample weight
Sweeps Sample weight from 1 to 3, holding your other inputs fixed.
Lot test data in your ERP
Optional: a short guide to storing fabric lot attributes like GSM and width in your ERP.
Optional. The tool and every export work without this. No spam.
How to measure
Cut a sample with a round GSM cutter, which gives a known area, often 100 square centimetres. Weigh it on a balance accurate to 0.01 gram. Take samples from several positions across the width and along the roll, then average. Enter the average weight and area. Make sure the fabric is conditioned, since moisture changes weight, especially in cotton.
- Avoid the first and last metres of the roll.
- Cut away from selvedges unless testing selvedge weight.
- Record the conditioning atmosphere used.
Formulas and conversions
GSM equals sample weight in grams divided by sample area in square centimetres times 10,000. Ounces per square yard equals GSM divided by 33.906. Grams per linear metre equals GSM times width in metres. Metres per kilogram equals 1,000 divided by grams per linear metre. Roll weight is grams per metre times the length. Knit fabrics are often sold by weight and woven by length, so these conversions are used constantly.
Fabric kg to meter conversion
To convert fabric kg to meters, multiply GSM by the fabric width in metres to get grams per linear metre, then divide the weight in grams by that figure. Meters equal kg times 1,000, divided by GSM times width in metres. Example: 180 GSM fabric at 150 cm width weighs 270 grams per metre, so 1 kg gives about 3.70 metres and a 25 kg roll gives about 92.6 metres. To go from meters to kg, multiply metres by grams per metre and divide by 1,000. Use the measured cuttable width, not the label width, and finished GSM, not greige GSM, or the length will be wrong.
GSM to oz conversion
One ounce per square yard equals about 33.906 grams per square metre. To convert GSM to oz, divide by 33.906: 150 GSM is about 4.4 oz, 200 GSM about 5.9 oz and 300 GSM about 8.8 oz per square yard. To convert oz to GSM, multiply by 33.906, so 6 oz denim is about 203 GSM and 12 oz is about 407 GSM. Denim weights quoted in ounces are usually per square yard, so check the basis on the specification before converting.
Reading the result
Compare your GSM against the buyer specification and its tolerance, often plus or minus five percent. Very light jersey sits around 120 to 150 GSM, mid-weight tees around 160 to 200, fleece and heavy knits well above that. If GSM varies widely across the width or roll, the finishing or knitting process needs attention.
Common mistakes
Weighing samples before conditioning, using the label width rather than the measured width for linear weight, and mixing finished GSM with greige GSM are the common errors. State whether the number is greige, dyed or finished when you share it.
Frequently Asked Questions
How do I calculate GSM of fabric?
Weigh a sample of known area and divide the weight in grams by the area in square centimetres, then multiply by 10,000. A 100 cm2 sample weighing 1.8 g gives 180 GSM.
How do I convert GSM to oz per square yard?
Divide GSM by 33.906. For example, 200 GSM is about 5.9 oz per square yard. For the reverse, multiply ounces per square yard by 33.906.
How do I convert fabric kg to meters?
Meters equal kg times 1,000, divided by GSM times width in metres. For 180 GSM fabric at 1.5 m width, one metre weighs 270 g, so 1 kg is about 3.70 m and 10 kg is about 37 m.
How do I get metres per kg from GSM?
Multiply GSM by fabric width in metres to get grams per linear metre, then divide 1,000 by that number. Wider or heavier fabric gives fewer metres per kilogram.
What tolerance is normal for GSM?
Many specifications allow around five percent either way, but it depends on the buyer and the fabric. Always check the agreed specification or test standard on the order.
Netray can help bring fabric lot test results such as GSM and width into the item and lot records in your ERP so purchasing and quality use the same numbers.
Related Tools
Fabric Consumption Calculator
Work out fabric consumption per garment and for the whole order from marker length, end allowance, shrinkage and wastage.
Discrete ManufacturingCutting Room Efficiency Calculator
Measure marker efficiency and true fabric utilization for a lay, and put a cost on the fabric lost between marker and cut piece.
Costing & FinanceGarment Costing Worksheet
Editable cost sheet for a single style: fabric, trims, cut-make-trim, packing and overhead with wastage per line and a quote price.
MES & Shop FloorSewing Line Balancing Calculator
Calculate takt time, required operators, line balance efficiency and daily output for a sewing line from SAM and bottleneck time.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Fabric Shrinkage Pattern Allowance CalculatorConvert finished garment size and wash shrinkage into the pattern (cut) size, then total fabric area and linear meters for the order.
- Fabric Consumption CalculatorWork out fabric consumption per garment and for the whole order from marker length, end allowance, shrinkage and wastage.
- Fabric Roll Barcode Label ZPL GeneratorGenerate ZPL II code for a 4 inch fabric roll label with item, lot, width, length and a Code 128 roll ID barcode.