IEC 62443 Security Levels and Parts Reference

IEC 62443 is the standard that most OT security conversations eventually point to, yet few people can say which part answers their question. This lookup maps parts, security levels, foundational requirements and vocabulary in one searchable table.

Download:
ItemGroupWhat it coversMostly used by
62443-1-1
Part
Terminology, concepts and models, including the foundational requirements and security levels
Everyone starting out
62443-2-1
Part
Security program requirements for IACS asset owners
Plant owner, IT security lead
62443-2-3
Part
Patch management in the IACS environment
Asset owner, service provider
62443-2-4
Part
Security program requirements for IACS service providers (integrators, maintainers)
System integrator, vendor
62443-3-2
Part
Security risk assessment for system design, including partitioning into zones and conduits
OT architect, integrator
62443-3-3
Part
System security requirements and security levels
System designer, buyer
62443-4-1
Part
Secure product development lifecycle requirements
Product vendor
62443-4-2
Part
Technical security requirements for IACS components (embedded devices, host, network, software)
Product vendor, buyer
SL 1
Security level
Protection against casual or coincidental violation
Risk assessor
SL 2
Security level
Protection against intentional violation using simple means, low resources, generic skills and low motivation
Risk assessor
SL 3
Security level
Protection against intentional violation using sophisticated means, moderate resources, IACS specific skills and moderate motivation
Risk assessor
SL 4
Security level
Protection against intentional violation using sophisticated means, extended resources, IACS specific skills and high motivation
Risk assessor
SL-T
Security level type
Target security level for a zone, set by the risk assessment
Asset owner
SL-C
Security level type
Capability security level a component or system can deliver when configured correctly
Vendor, buyer
SL-A
Security level type
Achieved security level of the installed system, verified after commissioning
Integrator, asset owner
FR 1
Foundational requirement
Identification and authentication control (IAC)
Designer
FR 2
Foundational requirement
Use control (UC): enforce assigned privileges
Designer
FR 3
Foundational requirement
System integrity (SI): protect against unauthorized manipulation
Designer
FR 4
Foundational requirement
Data confidentiality (DC)
Designer
FR 5
Foundational requirement
Restricted data flow (RDF): segmentation of zones and conduits
Network architect
FR 6
Foundational requirement
Timely response to events (TRE): audit logs and incident reporting
Security operations
FR 7
Foundational requirement
Resource availability (RA): resist denial of service and keep essential functions
Designer, operations
Zone
Term
A grouping of logical or physical assets that share common security requirements
OT architect
Conduit
Term
A path for communication between zones that carries its own security requirements
OT architect
IACS
Term
Industrial automation and control system: people, process and technology that operate a plant
Everyone
Asset owner
Role
The organization that operates the IACS, normally the manufacturer
Plant management
Product supplier
Role
The party that develops and supports a control product such as a PLC or HMI
Vendor

Summary of structure only, based on the published series. Buy the standard from IEC or ISA for exact requirement text and check which editions apply to your contracts.

Zone and conduit review

Optional expert review of your plant zone diagram against 62443 practice.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Type a part number, a term such as conduit, or a role to filter. If you own the plant, start with the 2-1 program requirements and the 3-2 risk assessment. If you buy PLCs or HMIs, look at 4-2 component capability. If you are an integrator, 2-4 and 3-3 govern your work. Export the table to Excel to attach to an RFQ or a security requirements annex.

  • Owners: 2-1, 2-3, 3-2
  • Integrators: 2-4, 3-3
  • Product vendors: 4-1, 4-2

Security levels in practice

Security levels describe the strength of attacker a zone should resist, from casual mistake at SL 1 to a well-funded, motivated attacker at SL 4. The important habit is to set a target per zone from the risk assessment, ask vendors for the capability level of what you buy, and verify the achieved level after commissioning. Most plant-floor zones land at SL 1 or SL 2 today, while safety and critical control zones are argued upward.

Zones and conduits

The practical heart of the series is partitioning. Group assets that share risk into zones, such as a CNC cell or a packaging line, and treat every link between zones as a conduit with defined rules. This is the language behind firewalls between the office network and the plant, and between cells. A zone and conduit diagram is usually the first deliverable an auditor asks for.

Common mistakes

Teams often claim they are IEC 62443 compliant after buying a firewall. The series certifies products, processes and service providers separately, and it expects a documented risk assessment, not a product list. Another error is setting every zone to the highest level, which makes projects unaffordable and gets abandoned. Set targets honestly and revisit them yearly.

Frequently Asked Questions

Is IEC 62443 mandatory?

Not by itself. It becomes mandatory when a customer contract, insurer or national regulation references it. Many buyers of automation equipment now ask suppliers for 4-1 process or 4-2 component evidence in tenders.

What is the difference between SL-T, SL-C and SL-A?

SL-T is the target you set from risk. SL-C is what a product or system can achieve when properly configured. SL-A is what you actually achieved after installation. The goal is SL-A at or above SL-T.

Does it replace NIST CSF or ISO 27001?

No. Those are enterprise frameworks. IEC 62443 is specific to industrial automation and control systems. Many manufacturers use CSF or ISO 27001 for governance and 62443 for the plant floor.

Which part do I read first?

Read 1-1 for vocabulary, then 3-2 if you need to do a risk assessment, or 2-1 if you need a security program. Product buyers should go to 4-2 and the vendor's declared capability.

If you want help mapping your plant zones and conduits to the controls you already have, Netray can run that review with your OT team.