Compliance & ContractsFree calculatorPDF, Excel, Word exportManufacturing

MFA Rollout Risk Reduction Calculator

MFA is one of the highest-value controls, but budgets still ask for numbers. This calculator shows the expected takeovers prevented by raising coverage and compares the avoided loss with the added licence and support cost.

Your numbers

35 %
95 %
%

Share of accounts with stolen or guessed credentials in a year.

95 %

Phishing-resistant methods block more than SMS codes or push approvals.

$
$

Licence, tokens and helpdesk support combined.

Your results

Takeovers avoided per year
10.26
Net annual benefit
$127,980
Expected takeovers per year today
12.015
Expected takeovers per year after rollout
1.755
Loss avoided per year
$153,900
Added annual MFA cost
$25,920

Expected-value model with illustrative defaults. Replace compromise rates and costs with your own incident data.

Free, optional. Reopen it on any device.
Save results:

Net annual benefit vs MFA coverage after rollout

Sweeps MFA coverage after rollout from 10 to 100, holding your other inputs fixed.

ERP access review

Optional review of privileged ERP access alongside your MFA plan.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter total accounts and current and planned MFA coverage. Estimate the annual compromise rate for unprotected accounts from past incidents, password reset spikes and breach exposure reports. Set how much of that risk MFA removes, using a lower value for SMS or push methods and a higher one for hardware keys or passkeys. Enter an average takeover cost and the monthly cost per newly covered user.

  • Cover remote access, email and admin accounts first.
  • Include service accounts separately because they often cannot use MFA.
  • Count helpdesk time in the per-user cost.

The model

Unprotected accounts are compromised at the base rate. Protected accounts are compromised at the base rate multiplied by one minus MFA effectiveness. Expected takeovers are the user count times the base rate times the weighted blend at a given coverage. The difference between current and planned coverage gives takeovers avoided, which is multiplied by the average cost.

Reading the result

Benefit usually flattens near the top because the last few percent of users cost the same but add little reduction. The sweep shows that curve. If net benefit is negative at defaults, check the takeover cost: one ERP or email compromise leading to fraud, invoice redirection or a ransomware foothold can cost far more than a typical help desk reset.

Common mistakes

Counting coverage as enrolled users rather than enforced policy overstates protection. Legacy protocols such as IMAP and basic authentication bypass MFA entirely, so block them. Approving every push request without thinking defeats the control, so prefer number matching or phishing-resistant methods, and add conditional access for risky sign-ins.

Frequently Asked Questions

Is MFA worth it if the rollout is only partial?

Yes, if you cover the highest-risk accounts first. Admins, remote access, finance and email deliver far more risk reduction per user than low-privilege accounts, so prioritize by impact, not alphabetically.

How effective is MFA really?

It blocks most automated credential attacks, but effectiveness depends on the method. Phishing-resistant methods such as hardware keys and passkeys do better than SMS codes or simple push approvals.

What about shop floor shared logins?

Shared kiosks and terminals need alternative controls such as badge-based login, network restrictions and short sessions, since per-user MFA is often impractical. Document the exceptions and compensating controls.

Does this include the cost of the incident response?

Only if you include it in the average cost per takeover. Add investigation, reset, fraud and downtime to the figure for a fair comparison.

If you want ERP logins and privileged access reviewed alongside MFA coverage, Netray can help map who can do what inside your ERP.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Comparisons