Compliance & ContractsFree checklistPDF, Excel, Word exportManufacturing

OT Vendor Remote Access Hardening Checklist

Machine builders, integrators and ERP partners often need remote access, and it is one of the most common ways into plant networks. This checklist lays out the controls that make that access approved, narrow, watched and temporary.

0%

0 of 34 items complete

11 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Identity and approval

Network path

Session control and monitoring

Endpoint and data hygiene

Lifecycle and review

Aim for every critical item complete. Any critical item unchecked is a gap to log in your risk register with an owner and date.

Vendor access review

Optional review of your remote access paths and vendor accounts.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Go through the list once per vendor or once for your overall remote access service. Tick what is in place today and mark gaps. Critical items are the ones that, if missing, create a direct path from the internet or a vendor to your controllers. Export the completed list as evidence for an audit, an insurer questionnaire or a customer assessment.

  • Do one pass per vendor for high-risk machines
  • Treat unchecked critical items as open risks
  • Repeat after any change of vendor or tool

Why vendors are a priority

A vendor account usually has more access than a staff account, is used from networks you do not control, and is rarely reviewed. Compromises at service providers have repeatedly led to downstream intrusions. Reducing blast radius with a single gateway, per-request approval and a hard time limit addresses most of that exposure.

Jump host design

A good gateway authenticates with MFA, authorizes against a list of approved targets, records the session and holds credentials the vendor never sees. It lives in a DMZ, not on the plant network, and is patched like a perimeter device. Vendor tools that install their own tunnel on a machine bypass all of this and must be found and removed or controlled.

Common mistakes

The usual failures are shared vendor logins that never change, a cellular router on a machine that someone installed for a service visit, and accounts left active years after a project ended. Another is an approval process so slow that vendors work around it. Make the sanctioned path the easy one.

Frequently Asked Questions

Is a VPN enough for vendor access?

Rarely. A VPN gives network reach. You also need MFA, per-system authorization, session logging and a time limit. Without those, a stolen VPN credential becomes full access to whatever the tunnel can reach.

How do I handle machine builders with built-in remote support?

Inventory every such connection, route it through your gateway where the vendor allows, and keep it disabled until needed. Where it cannot be controlled, isolate the machine in its own zone.

How often should access be reviewed?

At least quarterly for active vendor accounts, plus at project close. Link the review to a calendar owner so it does not depend on memory.

What should contracts say?

Require MFA, named accounts, patched endpoints, breach notification within a set period, and cooperation in investigations. Have legal review the wording, as this checklist is operational guidance, not legal advice.

If you want a vendor access request flow tied to your ERP or ticketing system with expiry built in, Netray can help design it.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

Troubleshooting