NIST CSF 2.0 Categories Reference for Manufacturers
NIST CSF 2.0 added a Govern function and grew to 22 categories. This table lists them all with a factory-floor example, so you can map existing controls quickly and see where nothing exists.
| Function | Category ID | Category | Plant example |
|---|---|---|---|
Govern | GV.OC | Organizational Context | Know which plants, customers and contracts drive cyber obligations |
Govern | GV.RM | Risk Management Strategy | Agreed risk appetite for production downtime and data loss |
Govern | GV.RR | Roles, Responsibilities, and Authorities | Named owner for OT security and for each plant system |
Govern | GV.PO | Policy | Approved policies for access, patching, removable media and remote access |
Govern | GV.OV | Oversight | Leadership reviews cyber metrics and acts on them |
Govern | GV.SC | Cybersecurity Supply Chain Risk Management | Security terms in contracts with integrators and ERP partners |
Identify | ID.AM | Asset Management | Inventory of PLCs, HMIs, servers, software and data flows |
Identify | ID.RA | Risk Assessment | Vulnerability tracking and threat review for plant and office |
Identify | ID.IM | Improvement | Lessons from exercises and incidents feed the next plan |
Protect | PR.AA | Identity Management, Authentication, and Access Control | MFA for remote access, unique accounts on engineering stations |
Protect | PR.AT | Awareness and Training | Phishing training for office staff and OT awareness for operators |
Protect | PR.DS | Data Security | Encrypted laptops, protected drawings and controlled CUI handling |
Protect | PR.PS | Platform Security | Baseline configurations, patching and removal of unused services |
Protect | PR.IR | Technology Infrastructure Resilience | Network segmentation and redundant paths to critical lines |
Detect | DE.CM | Continuous Monitoring | Monitoring of firewalls, endpoints, remote sessions and OT traffic |
Detect | DE.AE | Adverse Event Analysis | Triage of alerts and correlation across IT and OT sources |
Respond | RS.MA | Incident Management | A tested playbook that stops spread and decides when to halt production |
Respond | RS.AN | Incident Analysis | Forensic evidence preserved before systems are rebuilt |
Respond | RS.CO | Incident Response Reporting and Communication | Notifying insurer, customers and authorities on schedule |
Respond | RS.MI | Incident Mitigation | Isolating a cell, disabling accounts, blocking indicators |
Recover | RC.RP | Incident Recovery Plan Execution | Restoring ERP and MES in the order the plant needs |
Recover | RC.CO | Incident Recovery Communication | Telling staff and customers when operations are back and what changed |
Category names follow NIST CSF 2.0. The plant examples are our own plain-language illustrations, not NIST text. Read the official subcategories before claiming a mapping.
CSF gap workshop
Optional facilitated mapping of your controls to the 22 categories.
Optional. The tool and every export work without this. No spam.
How to use it
Filter by function, then for each category write down the control that covers it today and its owner. Export to Excel and add columns for current maturity and target. Categories where you can name nothing are your gaps. This produces a simple heat map that a board or insurer can read without a framework training course.
- Filter on Govern to see the new 2.0 function
- Add owner and maturity columns after export
- Review quarterly, not once
What changed in 2.0
Version 2.0 added Govern, covering strategy, roles, policy, oversight and supply chain risk. It also widened the target audience beyond critical infrastructure to organizations of any size and sector. For manufacturers, GV.SC is especially relevant because customer flow-down clauses and integrator access make suppliers part of your attack surface.
Mapping to other frameworks
CSF is a taxonomy, not a certification. Most organizations map it to the requirements they must meet: NIST SP 800-171 or CMMC for defense work, IEC 62443 for the plant floor, ISO 27001 for a management system. Use CSF categories as the common language and keep the detailed mapping in one spreadsheet.
Common mistakes
Do not treat the tiers as a score to maximize. They describe how rigorous and integrated your practices are and should match risk. Avoid a one-time mapping that sits in a drawer. Assign an owner per category, review them on a calendar, and tie gaps to funded actions.
Frequently Asked Questions
How many categories does CSF 2.0 have?
Six functions and 22 categories, each with subcategories beneath. The functions are Govern, Identify, Protect, Detect, Respond and Recover.
Is CSF 2.0 mandatory?
Not for private manufacturers as a rule. It is voluntary guidance, though customers, insurers and regulators often reference it, and federal suppliers may map it to required controls.
Is it suitable for OT?
Yes as a governance structure. It is technology neutral, so pair it with OT specific guidance such as IEC 62443 or NIST SP 800-82 for the technical controls on the plant floor.
Where do I find the subcategories?
In the official NIST CSF 2.0 document and the CSF reference tool published by NIST. This table stops at the category level to keep it quick to scan.
If you want a CSF-based gap view for your plants and ERP estate, Netray can facilitate the mapping workshop with your team.
Related Tools
IEC 62443 Security Levels and Parts Reference
A quick lookup of the IEC 62443 series structure, the four security levels, the seven foundational requirements and the zone and conduit vocabulary.
Compliance & ContractsCyber Risk Register Worksheet for Manufacturers
Score IT and OT cyber risks by likelihood and impact, compare inherent and residual risk and track the treatment owner.
Aerospace & DefenseCMMC 2.0 Level 2 Readiness Assessment
Answer 10 questions mapped to NIST SP 800-171 control families and get an instant CMMC Level 2 readiness score with prioritized next steps.
Developer ToolsWindows Security Event ID Reference for Threat Hunting
The event IDs a small security team should log and alert on, from failed logons and new services to cleared logs and PowerShell script blocks.
More Compliance & Contracts tools
See all- ISO 14001 Internal Audit Checklist
- Environmental Compliance Obligations Register Worksheet
- AI Governance Policy Template for Manufacturers
- AI Acceptable Use Policy Template for ERP Users
- Annualized Loss Expectancy Cyber Risk Calculator
- Cyber Insurance Retention Tradeoff Calculator
- MFA Rollout Risk Reduction Calculator
- Cyber Risk Register with ALE Worksheet
- OT Vendor Remote Access Hardening Checklist
Keep exploring
Free tools
- SAP Production Order Types, Categories and Statuses ReferenceA searchable lookup of SAP order categories, order type controls, system statuses, shop floor transactions and core order tables.
- NIST AI RMF Core Functions Reference for ERP AISee what the four NIST AI RMF functions ask for and what each looks like for an ERP assistant or agent.
- SAP Cost Element Categories ReferenceA searchable list of SAP CO cost element categories, S/4HANA account types and the master data objects around them.
ERP fixes and how-tos
- Infor Factory Track for M3: Shop Floor Data Collection ExplainedWhat Infor Factory Track does for M3 manufacturers: shop floor data collection feeding M3 orders, how the integration is structured and how to plan the setup.
- How to add a private AI layer to Infor Factory Track on-premReference architecture to add AI to Infor Factory Track on-prem: read-only data path, retrieval, permissions, local GPUs, write-back control and rollout.
- How to Run an Internal ERP Help Desk: Tiers, SLAs and KnowledgeHow to run an ERP help desk: tiers, super users, ticket categories, SLAs by impact, knowledge base habits, and metrics that show where ERP pain is.
Guides
- CMMC 2.0 for Small ManufacturersCMMC 2.0 for small manufacturers explained: Level 1 vs Level 2, the 110 NIST SP 800-171 practices, scoping your shop floor, and where ERP and CAD data fit.
- ERP Security Best Practices GuideImplement comprehensive ERP security best practices covering access control, encryption, monitoring, and compliance aligned with NIST CSF and CIS Controls frameworks.
- On-Prem AI for CUI in Small ManufacturersOn-prem AI for CUI: how small defense manufacturers run an LLM on their own GPUs inside the NIST 800-171 boundary, with hardware sizing and real trade-offs.
AI on your ERP
- Mapping DFARS 7012 and NIST 800-171 Controls to AI on Your ERPMap DFARS 252.204-7012 and NIST SP 800-171 control families to an AI system layered on your ERP, with evidence a Compliance Manager can defend.
- CMMC Level 2 AI for ERP Without Blowing Up Your ScopeHow to deploy AI inside your CMMC 2.0 Level 2 assessment boundary without expanding CUI scope. Enclave architecture a CISO can defend to a C3PAO.
Manufacturing hubs
- MEP centers: the Manufacturing Extension Partnership National Network explainedWhat MEP centers are, what the NIST MEP National Network offers small manufacturers, how to find your state center, and how it fits with ERP and AI projects.
- NDIA and the defense industrial base: what suppliers face on compliance, ERP and dataNDIA and the U.S. defense industrial base: what the association does and the DFARS, NIST 800-171, CMMC and ERP data issues defense manufacturers face.