Infor LN & BaanFree referencePDF, Excel, Word exportInfor LNAll Infor LN and Baan tools

Infor LN Production Tables Reference: tisfc001, tibom010, tirou102 and Related

This reference maps the LN 10.x Manufacturing tables that shop floor reports and MES interfaces read: production orders, operations, estimated and actual material and hours, BOM lines, routings, work centers, machines and tasks. Each row gives keys, the columns you need and the join path.

Download:
TableDescriptionKey fieldsImportant columnsJoin toSessionNotes
tisfc001
Production orders
pdno
mitm item, qrdr quantity ordered, qdlv quantity delivered, qrjc scrapped, osta order status, prdt production start, pldt planned delivery date, cwar warehouse, opro routing, site
tisfc001.mitm = tcibd001.item
tisfc0501m000 Production Orders
For osta values and their meaning see the production order status reference.
tisfc010
Production order operations (production planning)
pdno, opno
opst operation status, cwoc work center, mcno machine, tano task, sutm average setup time, rutm cycle time, prte production rate, most man occupation for setup, mopr man occupation for production, mcoc machine occupation, qbfd done, qtbf to do, qrjc scrapped, cmdt completion date
tisfc010.pdno = tisfc001.pdno; tisfc010.cwoc = tirou001.cwoc
tisfc0110m000 Production Planning; tisfc0130m000 Report Operations Completed
Copied from tirou102 when the order is created, then updated by reporting.
ticst001
Estimated and actual material costs
pdno, pono
sitm item, opno operation, cwar warehouse, ques estimated quantity, qucs actual quantity, cpes estimated unit cost, cpcs actual standard cost, bfls backflushing, clot lot
ticst001.pdno = tisfc001.pdno; ticst001.sitm = tcibd001.item
ticst0101m000 Estimated Materials; ticst0501m000 Estimated vs. Actual Material Costs
Material list of the order, copied from the BOM.
ticst002
Estimated and actual hours
pdno, opno
cwoc work center, cowc costing work center, tano reference operation, qpln quantity planned, awgc actual labor costs, amcc actual machine costs, aohc actual overhead costs, ascc actual subcontracting costs
ticst002.pdno, opno = tisfc010.pdno, opno
ticst0502m000 Estimated vs. Actual Hours Costs
Aggregated hour costs per operation for variance reports.
bptmm120
Production order hours (hours accounting)
emno, year, peri and a line number (check the index in your dictionary)
emno employee, orno production order, opno operation, tano task, mcno machine, hrma machine time, stup setup time, perc percentage completed, trdt transaction date, proc processed
bptmm120.orno = tisfc001.pdno
bptmm1120m000 Production Order Hours
Hours accounting lives in the People (bp) package; processed hours feed ticst002.
tibom010
Bill of material lines
mitm, pono, seqn
sitm component item, qana net quantity, opno operation, cwar warehouse, indt effective date, exdt expiry date, scpf scrap percentage, scpq scrap quantity, cpha phantom
tibom010.mitm = tcibd001.item (parent); tibom010.sitm = tcibd001.item (component)
tibom1110m000 Bill of Material
Use indt and exdt to select the lines valid on a date.
tirou101
Item routings (routing codes by item)
mitm, opro
opro routing, stor standard routing, strc standard routing code, runi routing unit, ruoq up to quantity
tirou101.mitm = tcibd001.item; tisfc001.opro = tirou101.opro
tirou1101m000 Item - Routings
An item can have several routings, chosen by quantity or by default.
tirou102
Routing operations
mitm, opro, opno, seqn
tano task, cwoc work center, mcno machine, nopr next operation, sutm setup time (min), rutm cycle time (min), prte production rate, most man occupation for setup, mopr man occupation for production, mcoc machine occupation, qutm queue time, mvtm move time, indt/exdt effective and expiry dates
tirou102.mitm, opro = tirou101.mitm, opro; tirou102.cwoc = tirou001.cwoc
tirou1102m000 Routing Operations
Run time per unit is cycle time divided by production rate when the rate is not 1.
tirou001
Work centers
cwoc
kowc work center type, mnwc parent work center, nomc number of machines, noop available labor resources, wcru week capacity, dcru basic day capacity, qutm queue time, mvtm move time, wipw shop floor warehouse
tisfc010.cwoc = tirou001.cwoc
tirou0101m000 Work Centers
Work centers are also departments in tcmcs065.
tirou002
Machines (machine types)
mcno
cwoc work center, mcrt machine rate, cpcp cost component, mccp week capacity, mdcp basic day capacity, site
tirou102.mcno = tirou002.mcno
tirou0102m000 Machines (Machine Types)
Machine rate and cost component drive machine cost in ticst002.
tirou003
Tasks (reference operations)
tano
dsca description, cwoc default work center, mcno default machine, mlwc work center selection method, mlmc machine selection method
tirou102.tano = tirou003.tano
tirou0103m000 Tasks (Reference Operations)
Defaults are copied into routing operations.
tiipd001
Item - production
item
cpha phantom, scpf scrap percentage, runi routing unit, bfep backflush materials, bfhr backflush hours, rgrp routing group, sfpl shop floor planner
tiipd001.item = tcibd001.item
tiipd0101m000 Item - Production
Backflush flags default into production orders (tisfc001.bfep, bfhr).
tcibd001
Items - general
item
dsca description, kitm item type, citg item group, cuni inventory unit
tisfc001.mitm, tibom010.sitm, ticst001.sitm = tcibd001.item
tcibd0501m000 Items
Use it for descriptions and units in every production report.
tcmcs065
Departments
cwoc
typd department type, site, comp financial company, emno manager
tirou001.cwoc = tcmcs065.cwoc
tcmcs0565m000 Departments
A work center is a department of type work center.
tcmcs048
Cost components
cpcp
cpus component type, cref cost type, fxvc fixed or variable, dinc direct or indirect
tirou002.cpcp = tcmcs048.cpcp
tcmcs0148m000 Cost Components
Groups labor, machine, material and overhead costs in cost reports.

Physical names add t and the company number (ttisfc001100). SQL columns use t_ on SQL Server and t$ on Oracle. Tables and fields were checked against the LN 10.x online help for the sessions listed. Status fields (osta, opst) are enumerations; read their meaning from the domain, and see the production order status reference for the order lifecycle.

Want a work center load query for your LN plant?

Share your LN release and time units and we will review a tisfc010 load query against your routings.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

From master data to a production order

Master data sits in tibom010 (BOM lines keyed by parent item mitm, position and sequence), tirou101 (routings per item) and tirou102 (routing operations with task, work center, machine and times). When a production order is created in tisfc001, LN copies the operations into tisfc010 and the material into ticst001. Reporting operations and hours updates tisfc010 and bptmm120, and costing aggregates into ticst002. Report Orders Completed then raises tisfc001.qdlv. Because the order holds copies, a later change to the BOM or routing does not change open orders.

  • Master: tibom010, tirou101, tirou102, tirou001, tirou002, tirou003
  • Order: tisfc001, tisfc010, ticst001
  • Actuals: bptmm120, ticst002

Worked example: operation load per work center

Select open operations from tisfc010 where opst is not completed, join tisfc001 on pdno for the order quantity and status, and group by cwoc. For each operation, remaining run time is roughly the to-do quantity times cycle time divided by production rate, plus setup time if setup is not done. Multiply by man or machine occupation to get labor or machine hours. Join tirou001 on cwoc for week capacity wcru to compare load against capacity. Use the time unit fields on the tables, since times may be stored in minutes.

Gotchas

tibom010 and tirou102 carry effective and expiry dates, so a BOM explosion without a date filter returns old and new lines together. Phantoms (cpha) are exploded into the parent order, so a phantom item never gets its own production order, and its components appear directly in the parent order material in ticst001. Hours live in the bp package (bptmm120), not in ti, which surprises people porting Baan IV reports. Do not repeat status text in reports: osta and opst are enumerations whose labels come from the domain in your language.

How to check the result in LN

Compare your query with the sessions. For one order, the operations in your result should match Production Planning (tisfc0110m000), the material should match Estimated Materials (ticst0101m000) and the cost totals should match Estimated vs. Actual Material Costs (ticst0501m000) and Estimated vs. Actual Hours Costs (ticst0502m000). Field help in each session shows the table and field behind a value. If a number differs, check the time unit, the routing unit and whether hours accounting has been processed, because unprocessed bptmm120 lines are not yet in ticst002.

Frequently Asked Questions

Is there an Infor LN data dictionary for manufacturing tables?

The authoritative dictionary is the one in your own LN environment, where each table definition lists fields, domains and indexes. Field help in each session shows the table and field behind a field. This page summarizes the standard LN 10.x production tables so you know where to look first.

Which table holds production order operations in LN?

tisfc010, keyed by production order pdno and operation opno. It holds the operation status, work center, machine, task, setup and cycle times, production rate, man and machine occupation and the done, to-do and scrapped quantities. Sessions Production Planning (tisfc0110m000) and Report Operations Completed (tisfc0130m000) show it.

Where are routing setup and cycle times stored?

In tirou102 Routing Operations (tirou1102m000): sutm is setup time and rutm is cycle time, with prte production rate, most and mopr man occupation for setup and production, and mcoc machine occupation. They are copied into tisfc010 when an order is created.

What is the difference between ticst001 and tibom010?

tibom010 is the master bill of material for an item. ticst001 is the material list of one production order, copied from the BOM at order creation and then updated with actual issued quantities and costs. Reports on what an order used should read ticst001, not the BOM.

If planners want to ask LN which orders are late or which work centers are overloaded in plain English on your own servers, we can add a read-only AI layer over these tables.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Software