Infor LN & BaanFree referencePDF, Excel, Word exportInfor LNAll Infor LN and Baan tools

Infor LN Tools Administration Sessions Reference

This reference lists the Infor LN 10.x Tools sessions administrators and developers use most, grouped by area, with what you do in each and the session you normally run next. It is for people who already know LN sessions and want the right code fast.

Download:
Session codeSession nameAreaWhat you do thereRun asNext step after it
ttaad1100m000
Companies
Company setup
Define companies: name, first day of week, currency, company type
Admin
Convert to runtime, then Create Tables (ttaad4230m000)
ttaad1106m000
Generic Units
Company setup
Define generic units such as currency codes with symbol and separators
Admin
Convert to runtime (stored in the BSE lib datecurr file)
ttaad4120m000
Logical Tables
Company setup
Map tables or modules of a logical company to the physical company that stores them
Admin
Convert to runtime and rebuild the company mapping file
ttaad4230m000
Create Tables
Table maintenance
Create physical tables for a range of companies and packages
Admin
Check Tables (ttaad4232m000)
ttaad4232m000
Check Tables
Table maintenance
Check that tables open and match their definitions
Admin
Fix -2 errors (no runtime definition) with Convert to Runtime
ttaad4225m000
Reorganize Tables
Table maintenance
Rebuild data and indexes, compress, repair reference counters
Admin, outside business hours
Review the log of undefined references
ttaad4226m000
Create Sequential Dump of Table
Table maintenance
Export table data to sequential files
Admin
Create Table from Sequential Dump (ttaad4227m000) on the target
ttaad4227m000
Create Table from Sequential Dump
Table maintenance
Import a dump, append or create tables, check against the data dictionary
Admin
Check Tables (ttaad4232m000)
ttaad4228m000
Convert / Recover Tables
Table maintenance
Move data to another database type or rebuild tables from their own data
Admin, with a backup
Check Tables (ttaad4232m000)
ttaad2500m000
User Data
Users
Define user system data, defaults, authorisations, templates
Admin
Convert changes to runtime, user restarts Tools
ttaad5500m000
Job Data
Jobs
View and maintain jobs, status, schedule, linked sessions
Job owner or admin
Activate Job (ttaad5203m000) or set In Queue
ttaad5203m000
Activate Job
Jobs
Start a job with status Free and set periodic or external schedules
Job owner or admin
Monitor in Job Data
ttadv2500m000
Sessions
Development
View and maintain sessions of a package VRC
Developer
Edit the script in ttadv2530m000
ttadv2530m000
Program Scripts / Libraries
Development
Maintain UI scripts, libraries, DAL and DAL 2 scripts per VRC
Developer
Compile (ttadv2230m000)
ttadv2230m000
Compile Program Scripts / Libraries
Development
Compile a range of scripts and libraries, optionally linked libraries
Developer
Test the session
ttadv4520m000
Table Definitions
Data dictionary
Look up and maintain table definitions by package, module, table
Developer
Convert to Runtime Data Dictionary (ttadv5215m000)
ttadv5215m000
Convert to Runtime Data Dictionary
Data dictionary
Convert changed domains, tables and runtime directories to the runtime DD; reconfigure changed tables
Developer or admin
Create Tables (ttaad4230m000) for new tables
ttadv3530m000
Reports
Development
List reports by language and package, export or import XML report designs
Developer
Edit the design in Reporting Studio
ttpmc2101m000
Process Solutions
Patching
Check, install or uninstall solutions connected to an update VRC
Admin
Review installation instructions and logs
ttpmc2102m000
Process Patches
Patching
Install, uninstall and connect scanned patches
Admin
Convert to runtime and compile as instructed
ttpmc1140m000
Dependencies
Patching
Define dependencies between solutions or patches
Developer (sending side)
Set solution status to Dependencies defined, then export
daxch0101s000
Exchange Schemes
Integration
Define ASCII import and export schemes, paths and formats
Admin or consultant
Define the tables and fields in the scheme, then run import or export
tttxt1110m000
Text Groups
Text
Create text groups, default window type and editor
Admin
Link groups to text fields or users
tcbod0100m000
BOD Parameters
Integration
Prevent BOD Publishing, inbound routing error handling, schema version
Admin
Validate Publishing Data Setup (tcbod0300m000)
tcbod0300m000
Validate Publishing Data Setup
Integration
Check data needed for BOD publishing
Admin
Initial publish sessions (tcbod0200m000 and others)

Session codes and names are taken from the LN 10.x Tools online help. Most dictionary and company changes do nothing until they are converted to runtime. Always take a backup before Convert / Recover Tables or Reorganize Tables on production.

Get an LN admin health check

Tell us your LN release and the jobs and patches you run, and we will review the admin routine and maintenance windows.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Search by code (ttaad4230m000), by name (Create Tables) or by area (Patching). The Next step column is the useful part: most Tools changes are two-step, because LN works from a runtime data dictionary. A new company, generic unit, logical table mapping or user only takes effect after a convert to runtime, and a new table definition only becomes a physical table after Create Tables. The Run as column is guidance: in most sites these sessions are restricted to the Tools super user or a named admin role.

Where this lives in LN

Session codes follow the package, module, number pattern: tt is the Tools package, aad is Application Administration, adv is Application Development, pmc is Product Maintenance and Control, txt is texts. daxch belongs to the data exchange module and tcbod to Common BOD setup. You can start any session by code from the LN UI or Web UI with the Run Program dialog. For session naming in general and module codes see the separate LN session code reference.

  • Company work: ttaad1100m000, ttaad4120m000, ttaad4230m000
  • Data dictionary: ttadv4520m000 then ttadv5215m000
  • Code: ttadv2530m000 then ttadv2230m000
  • Patches: ttpmc2102m000 and ttpmc2101m000

Worked example: adding a test company

An admin needs company 900 as a copy-test company. In Companies (ttaad1100m000) the admin creates 900 with its package combination. If some Financials tables should point to an existing company, Logical Tables (ttaad4120m000) maps them. After converting to runtime, Create Tables (ttaad4230m000) builds the physical tables for company 900, and Check Tables (ttaad4232m000) confirms they open. Data is then loaded with Create Sequential Dump of Table (ttaad4226m000) from production and Create Table from Sequential Dump (ttaad4227m000) into 900.

Version differences and gotchas

Most sessions here are stable across LN 10.3 to 10.7, but options inside them change between releases, so check the session help for your version. Reorganize Tables and Convert / Recover Tables lock tables; run them in a maintenance window. Patch sessions work on the update VRC, not on your customer VRC, so solution conflicts with customisations must be resolved before you install. Generic unit changes only reach users after conversion to the runtime file.

Frequently Asked Questions

What is an Infor LN session code?

A session code such as ttaad4230m000 combines package (tt), module (aad), a number (4230) and a suffix (m000 for main sessions, s for subsessions). You can type it in the run program dialog to open the session directly instead of using menus.

How do I create tables for a new company in LN?

Define the company in Companies (ttaad1100m000), add logical table mappings in ttaad4120m000 if needed, convert to runtime, then run Create Tables (ttaad4230m000) for the company and package range. Check the result with Check Tables (ttaad4232m000).

How do I install an LN solution or patch?

Scan the solution or patch file with Scan Solution/Patch File (ttpmc2200s000), then use Process Solutions (ttpmc2101m000) or Process Patches (ttpmc2102m000) to check and install it into the update VRC. Read the installation instructions, then convert to runtime and compile as they require, and test before moving on.

Is there an official Infor LN administrator guide?

Yes. Infor publishes the Enterprise Server Administration Guide and the LN Tools online help on docs.infor.com. This page is a working index of the sessions you use most, with the follow-up step, and does not replace those guides.

If you want admins to ask LN about jobs, tables and patch status in plain English on your own servers, we can add that layer for you.

Get Infor LN and Baan alerts

Support and maintenance deadlines, release changes that affect Infor LN and Baan sites, and new free Infor LN and Baan tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Infor LN and Baan: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Infor LN and Baan? Start with the Infor LN and Baan guide and toolkit, or plan with Training Path Builder, Upgrade Path Planner, ERP Table and Field Explorer.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Comparisons

Software