Costing & FinanceFree generatorPDF, Excel, Word export

Inventory Subledger to GL Reconciliation SQL Generator

Month-end inventory reconciliation is a join and a subtraction, but it is slow to do by hand across hundreds of items and several accounts. This generator writes the query so you can see differences by account and drill into the item-level detail.

Fill in

Generic name. Replace with your ERP table or view.

Differences at or below this are treated as matched.

Quoted, comma separated.

Generated code
Free, optional. Reopen it on any device.
Download:

Reconciliation query

-- Inventory subledger vs GL by account for period 202609
-- Table and column names are generic: map them to your ERP.
WITH sub AS (
  SELECT inventory_account AS gl_account,
         SUM(extended_value) AS sub_value
  FROM inventory_valuation
  WHERE period = '202609'
    AND inventory_account IN ('1300','1310','1320')
  GROUP BY inventory_account
),
gl AS (
  SELECT gl_account,
         SUM(ending_balance) AS gl_value
  FROM gl_period_balance
  WHERE period = '202609'
    AND gl_account IN ('1300','1310','1320')
  GROUP BY gl_account
)
SELECT COALESCE(sub.gl_account, gl.gl_account) AS gl_account,
       COALESCE(sub.sub_value, 0) AS subledger_value,
       COALESCE(gl.gl_value, 0) AS gl_value,
       COALESCE(sub.sub_value, 0) - COALESCE(gl.gl_value, 0) AS difference,
       CASE WHEN ABS(COALESCE(sub.sub_value, 0) - COALESCE(gl.gl_value, 0)) <= 1.00
            THEN 'MATCHED' ELSE 'INVESTIGATE' END AS status
FROM sub
FULL OUTER JOIN gl ON gl.gl_account = sub.gl_account
ORDER BY ABS(COALESCE(sub.sub_value, 0) - COALESCE(gl.gl_value, 0)) DESC;

Drill-down for unmatched accounts

-- Largest item-level values in the subledger for one account
SELECT item_number, warehouse, quantity_on_hand, unit_cost, extended_value
FROM inventory_valuation
WHERE period = '202609'
  AND inventory_account = '1300'
ORDER BY ABS(extended_value) DESC
FETCH FIRST 50 ROWS ONLY;

Table and column names here are placeholders. Map them to your ERP's inventory valuation and GL balance tables or views. FULL OUTER JOIN and FETCH FIRST work on PostgreSQL, Oracle 12c+ and SQL Server needs TOP instead. Run against a reporting copy, and take the extract at the same cut-off as the GL close.

Automate the inventory tie-out

Optional: discuss how to run this reconciliation automatically from your ERP data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the query

Replace the generic table and column names with those from your ERP's inventory valuation view and GL period balance view, then set the period, the inventory control accounts and a tolerance. Run it after the subledger is closed and the GL period is final. The first query shows each account with subledger value, GL value and a status flag, and the second query lists the largest item-level values for a drill-down.

Why the two sides differ

Frequent causes are receipts not yet matched to an invoice, manual journals posted directly to inventory accounts, production variances posted to inventory instead of variance accounts, timing differences in intercompany transfers, and standard cost revaluations posted in only one side. A difference that is identical to a single posting points to a missed or duplicated entry, while scattered small differences usually point to rounding or currency translation.

Reading the results

A MATCHED status within tolerance is expected. An INVESTIGATE status should be traced to the period transactions. Sort by absolute difference, take the largest, and walk through receipts, issues, adjustments and revaluations. Document each reconciling item with an owner and a clearing date.

Common mistakes

Comparing balances taken at different times, including non-inventory warehouses, ignoring in-transit stock accounts, and tolerances that are so large that real errors are hidden. Also remember that FULL OUTER JOIN is essential: a GL account with no subledger rows is exactly the case you need to see.

Frequently Asked Questions

How do I reconcile inventory to the general ledger?

Total the inventory subledger value by GL account at the period cut-off, compare with the GL balance of the same account, and trace differences to specific transactions such as unmatched receipts, manual journals and revaluations.

What tolerance should I use?

Use a small amount for rounding, often a few currency units per account. Larger tolerances hide real issues and should be justified in writing for auditors.

Will this run on any ERP?

The pattern is universal, but table and column names differ. You must map them. Syntax such as FETCH FIRST also varies by database, so adjust for SQL Server or MySQL.

Can I schedule it?

Yes. Run it after each period close from a reporting database, store the result with the period, and review INVESTIGATE rows. Keep a history for audit evidence.

If your reconciliation is a monthly spreadsheet exercise, we can discuss automating the extract and exception review from your ERP, read-only.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP