Compliance & ContractsFree calculatorPDF, Excel, Word exportCanada

Product of Canada vs Made in Canada: Cost Content Calculator

For most non-food goods, Product of Canada needs at least 98 percent of total direct costs incurred in Canada, while Made in Canada needs at least 51 percent plus a qualifying statement such as 'Made in Canada with imported parts'. Both also require the last substantial transformation of the product to happen in Canada. This calculator tests your cost split against both.

Your numbers

per batch

Raw materials and components with Canadian cost content.

per batch

Imported materials and components, including duty if you cost them that way.

per batch
per batch

Any outsourced operations performed abroad.

per batch

For example tooling consumed, direct energy, subcontract work done in Canada.

per batch

Your results

Canadian content of direct cost
67%
Share of total direct costs of producing the product that were incurred in Canada.
Made in Canada test (1 = meets, 0 = does not)
1
Needs at least 51 percent Canadian direct cost and last substantial transformation in Canada, plus a qualifying statement.
Total direct cost
$107,500
Direct cost incurred in Canada
$72,000
Product of Canada test (1 = meets, 0 = does not)
0
Needs at least 98 percent Canadian direct cost and last substantial transformation in Canada.
Canadian cost still needed for 98 percent
$33,350
Imported cost that would have to move to Canadian suppliers or work, holding total constant.

General guidance based on the Competition Bureau's published approach to Made in Canada and Product of Canada claims for non-food goods. Food claims follow separate CFIA rules. This is not legal advice: confirm your cost definitions and claim wording with counsel before labeling.

Free, optional. Reopen it on any device.
Save results:

Canadian content as imported materials change

Sweeps Direct materials imported from 0 to 120000, holding your other inputs fixed.

Check origin content across your product range

Optional: we can review how to compute Canadian content for every item from your ERP costing data.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the calculator

Take the bill of materials and routing for one batch or one unit, and split every direct cost into Canadian and foreign. Direct materials, direct labor and other costs directly tied to production count. Enter each pair of values, say whether the last substantial transformation happens in Canada, and read the two pass/fail outputs and the Canadian content percentage. The chart shows how quickly Canadian content falls as imported materials rise.

The rules behind each claim

The Competition Bureau treats these as representations about origin that must not be false or misleading. The thresholds below are the Bureau's published guidance for non-food products.

  • Product of Canada: at least 98 percent of total direct costs of producing or manufacturing the good incurred in Canada, and the last substantial transformation in Canada.
  • Made in Canada: at least 51 percent of total direct costs incurred in Canada, last substantial transformation in Canada, and a qualifying statement such as 'Made in Canada with imported parts' or 'with domestic and imported parts'.
  • Made in Canada without a qualifier is only appropriate where the content is virtually all Canadian, which the Bureau treats as the Product of Canada standard.
  • Verbs such as produced in or prepared in Canada are origin claims too, and are judged against the same expectations.

Worked example

With the default values, Canadian direct cost is 42,000 plus 24,000 plus 6,000, which is 72,000 out of 107,500, or about 67 percent. The product clears the 51 percent test and the last transformation is in Canada, so a qualified Made in Canada claim is supportable. It is far from 98 percent: Product of Canada would need roughly 33,000 more cost moved into Canada, shown in the last output. Overhead, marketing, profit and freight are not direct costs, so they do not move the percentage.

Common mistakes and food products

The usual errors are using total selling price instead of direct cost, counting overhead as Canadian content, forgetting that an imported subassembly carries foreign labor, and omitting the qualifying statement. Keep the costing file that supports the claim, since you may need to show it. Food products follow Canadian Food Inspection Agency rules, where Product of Canada generally means all or virtually all the food, ingredients, processing and labor are Canadian, so do not use this calculator for food.

Frequently Asked Questions

What is the difference between Product of Canada and Made in Canada?

Product of Canada is the stricter claim: at least 98 percent of direct production costs must be Canadian. Made in Canada needs at least 51 percent plus a qualifying statement about imported content. Both need the last substantial transformation to occur in Canada.

Can I say Made in Canada if my product has imported parts?

Yes, if at least 51 percent of total direct costs are Canadian, the last substantial transformation is in Canada, and the label carries a qualifier such as 'Made in Canada with imported parts'. Below 51 percent, the claim is generally not supportable.

Are overhead and profit included in the percentage?

No. The test looks at direct costs of producing or manufacturing the good, mainly materials and direct labor. Marketing, administration, profit and similar indirect amounts are generally outside it. Check your own definitions with counsel for borderline items.

Do the same rules apply to food?

No. Food is covered by Canadian Food Inspection Agency guidance. Product of Canada for food generally requires that all or virtually all of the food, processing and labor be Canadian, and Made in Canada food claims need a statement about domestic and imported ingredients.

If your BOM and routing costs sit in an ERP, we can build a private tool that pulls Canadian and foreign content per item straight from it and flags products whose claim is at risk.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Runs with your ERP

AI on your ERP

Manufacturing hubs