Manufacturing Quotation Template for Custom Parts
A clear quotation reduces back-and-forth, protects margin and sets expectations on lead time and terms. This template covers the points a buyer expects to see: part and revision, price breaks, one-time costs, lead time, delivery terms, validity and assumptions.
Fill in
Manufacturing Quotation Template
Quotation Q-24-0817
From: Northfield Precision Machining To: Bayview Hydraulics Inc. Date: 2026-10-20 Valid for: 30 days from the quote date
Part and specification
Part: HM-210 Rev C Material and finish: 6061-T6 aluminum, clear anodize Type II
Pricing
| Description | Price |
|---|---|
| Tier 1 | $148.00 at 50 pcs |
| Tier 2 | $131.50 at 250 pcs |
| Tier 3 | $119.00 at 1,000 pcs |
| One-time tooling and setup | $1,850 fixture and first article, waived at 1,000 pcs |
Delivery and terms
Lead time: 5 weeks ARO for first release Payment terms: Net 30 Delivery terms: FCA our facility
Assumptions and exclusions
Pricing based on drawing HM-210 Rev C. Material certificates included. First article report per AS9102 priced separately if required. Quantities and delivery schedule as stated.
Acceptance
This is a starting point, not legal advice. Add your standard terms and conditions, tax treatment, surcharge clauses for material price changes, and any export control statement your counsel requires.
Quote drafting from ERP data
Optional: we can discuss generating a first-draft quote from your routing, material and rate data with estimator approval.
Optional. The tool and every export work without this. No spam.
How to use the template
Fill in your company and customer, the quote number and date, and the part and revision from the drawing or RFQ. Add up to three quantity price breaks and any one-time tooling or setup charge. State lead time in weeks after receipt of order, payment terms and delivery terms. Use the assumptions box for everything that the price depends on. Then export to PDF or Word and send it with the cost sheet kept internally.
What a good quotation states
Buyers compare quotes line by line, so every term that affects cost should be written down. Name the drawing revision, since price changes with revision. State the quantity tiers, since unit price falls as setup is spread over more parts. Note what is included, such as material certificates, packaging and inspection, and what is excluded, such as first article reports, special testing and export packing. A validity period protects you against raw material swings.
- Drawing number and revision, and whether you quoted from a model or a print.
- Price breaks, minimum order quantity and any scrap or overrun tolerance.
- Tooling ownership and who pays for fixtures, gauges and dies.
- Lead time from purchase order, not from quote date.
- Payment terms, delivery terms and currency.
Pricing check before you send
Before sending, confirm the price breaks cover your cost at each quantity and still reach the target margin. A quick test is to compare the lowest tier against your standard cost plus required margin. Check that the setup is spread correctly over the smallest tier and that material surcharges are noted if metal prices are volatile. If the part is critical, run the quote review checklist so that heat treatment, special processes and inspection requirements are not missed.
Common mistakes
Common errors include quoting without the revision, leaving validity open ended, forgetting outside processing, and omitting the lead time for materials with long supply. Another is giving a single price for a quantity range when your cost changes with batch size. Finally, do not let the quotation contradict the customer's purchase order terms; resolve differences in writing before production starts.
Frequently Asked Questions
What should a manufacturing quotation include?
Customer and part details with revision, quantity price breaks, one-time charges, lead time, payment and delivery terms, validity period, assumptions and exclusions, and an acceptance block. These items let the buyer compare quotes fairly and prevent disputes later.
How long should a quote be valid?
Thirty days is common for stable materials. Shorten it to 7 to 14 days when metals, resin or freight prices are volatile, or add a surcharge clause tied to a published index. State the period explicitly on the quote.
Should I show price breaks?
Yes. Setup and programming cost are spread over the batch, so unit cost falls as quantity rises. Showing three tiers helps the buyer choose and often wins larger orders without discounting the base price.
Is this template legally binding?
It becomes part of a contract once the customer accepts it or issues a purchase order that refers to it. This template is a starting point, so have your counsel review the terms and conditions you attach.
If quotes are built in an ERP or spreadsheet, we can automate the first draft from routing, material and rate data while an estimator keeps final approval.
Related Tools
Manufacturing Quote Review Checklist
A pre-send checklist covering scope, material, routing, outside processing, margin, risk and terms, with critical items flagged.
Costing & FinanceStandard Cost Build-Up Worksheet
Build a part standard cost line by line from material, labor, machine, subcontract and overhead, with yield loss applied to each line.
ERP OperationsQuote Margin Analyzer
Pressure-test a quote by amortizing setup across the order quantity, adding commission, and showing the price required to hit a 30% target margin.
Costing & FinanceJob Shop Quote Price, Margin and Markup Calculator
Turn cost inputs into a unit price at your target gross margin, including scrap, setup and outside processing, and see the markup it equals.
Costing & FinanceJob Costing Variance Worksheet
Compare the estimated and actual quantity and rate on a job by cost element and split the difference into quantity and rate variance.
More Costing & Finance tools
See all- SAP QM Inspection Effort and Cost Calculator
- SAP Standard Cost Estimate BOM Rollup Calculator
- Legacy ERP Retirement Cost and Payback Calculator
- JD Edwards World Month-End Close Procedure Template
- Distributor Customer Credit Application Template
- Distributor Customer Profitability Worksheet
- Distributor GMROI and Inventory Turns Calculator
- Vendor Early Pay Discount Worksheet
- SyteLine Cost Rollup Variance Calculator
Keep exploring
Free tools
- Rubber Molding Job Quotation TemplateA fill-in quotation document for custom molded rubber parts covering compound spec, tolerances, price breaks, tooling, lead time, assumptions and terms.
- Manufacturer Sales Quotation TemplateA formal sales quotation for made-to-order and made-to-stock parts: line items, lead time, validity, Incoterms and key terms, with PDF and Word export.
- Packaging and Converting Quotation TemplateA fill-in quotation for labels, cartons and flexible packaging with specification, price breaks, tooling, overs and unders, and acceptance lines.