Materials Planner Weekly Exception Review Checklist
Good planning is mostly a habit: the same checks, in the same order, every week. This checklist gives a materials planner a repeatable routine for MRP exceptions, shortages and parameter hygiene.
0 of 30 items complete
6 critical items still open - these are the highest-risk gaps.
Before you start
Shortages and critical supply
MRP action messages
Parameters and policy
Excess, slow and accuracy
Aim to complete the critical items every week. Carry unfinished items to next week's list with an owner and a date.
Get the Monday exception pack built from your ERP
Optional: an expert review of how to automate the shortage, lead time and aging reports behind this routine.
Optional. The tool and every export work without this. No spam.
How to use the checklist
Work through the groups in order, ticking items as you complete them. The first group verifies that your data and the planning run are trustworthy, since everything else depends on them. Shortages come second because they hurt customers soonest. Export the ticked list to PDF to attach to your weekly review or Excel to track completion over time. Adjust the items to your ERP and your planning horizon.
Why exceptions first
MRP produces more recommendations than any planner can read line by line. Exception-based planning means focusing on messages that change an outcome: orders that will be late, shortages against firm demand, and cancellations that release cash. The rest can be handled by rule or on a slower cycle. The checklist reflects this order: confirm the run, handle shortages, process action messages, then fix the parameters that created repeat problems.
- Record the root cause of each repeated exception
- Fix the parameter, not just the order
- Keep a short list of parts that always need attention
Linking to parameters and policy
A planner who keeps expediting the same part is usually fighting a wrong parameter: a planned lead time shorter than reality, a safety stock too small for supplier variability, or a lot size that conflicts with a pack multiple. The parameter group asks you to compare planned with actual lead time on high-value items and to raise a change request when the data supports it. Over a few months this reduces exception volume more than any amount of faster firefighting.
Common mistakes
Skipping the data checks and then acting on a stale run. Clearing action messages by releasing everything, which inflates inventory. Ignoring cancel and reschedule-out messages, which leaves excess on order. Not recording decisions, so the next planner repeats the investigation. And leaving the weekly KPI update until the end, when it is the cheapest way to see whether the routine is working.
Frequently Asked Questions
Is weekly the right cadence?
For most discrete manufacturers a weekly routine plus a daily shortage check works well. Fast moving or make-to-order environments may need a daily pass through the first three groups.
Which ERP does this apply to?
It is ERP-neutral. The same steps apply to SAP MRP, Oracle planning, Infor SyteLine or LN, Epicor, NetSuite and others, only the screen and report names differ.
How many parameter reviews should I do a week?
Start with the top 20 items by value or by exception count. A steady 10 to 20 reviews a week covers the item base over a few months without overloading the planner.
What should I track as KPIs?
Typically past-due purchase orders, shortages against orders, service level or on-time delivery, inventory turns and excess value. Pick a handful, chart them weekly and discuss changes, not just levels.
If you want the exception lists, lead time comparisons and no-movement reports produced from your ERP data every Monday, Netray can build that as a read-only assistant over your system.
Related Tools
Inventory Days of Cover vs Lead Time Worksheet
Calculate days of cover for each part and compare it with replenishment lead time to spot shortage and excess risk.
Supply Chain & InventoryInventory Planning Parameter Change Request Template
A controlled request form for changing safety stock, reorder point, min-max or lot size, with rationale, impact and approvals.
Costing & FinanceSlow Moving and Obsolete Inventory Disposition Memo Template
A ready memo for proposing disposition of slow moving or obsolete stock, with options, financial effect and approval lines.
Supply Chain & InventorySafety Stock Calculator with Demand and Lead Time Variability
Compute safety stock and reorder point when both demand and supplier lead time vary, and see how lead time variability inflates the buffer.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator