Planner Monthly Inventory Health Review Checklist
A monthly review keeps inventory from drifting. This checklist walks a planner through parameters, excess, accuracy, suppliers and reporting in a repeatable order, so nothing depends on memory.
0 of 31 items complete
10 critical items still open - these are the highest-risk gaps.
Planning parameters
Stock levels and excess
Accuracy and counts
Suppliers and open orders
Reporting
Aim to tick every critical item each month. Items you cannot complete signal a data or process gap worth fixing before next month.
One-page inventory health view
Optional: a short review of building the monthly checks as a single ERP-driven report.
Optional. The tool and every export work without this. No spam.
How to run the review
Block out two or three hours at the same point each month, ideally after month-end close when numbers are final. Work through each group in order and tick items as you complete them. Note actions on the spot, with an owner and a date. Critical items are the ones most likely to cause a stockout or a write-down, so do not skip them when time is short.
Why these groups
The five groups follow how inventory problems actually arise. Parameters set the plan; stock levels show whether the plan is working; accuracy tells you whether the numbers are true; suppliers explain why the plan fails; reporting shows leadership the result. Reviewing them in this order means each step informs the next, for example finding a lead time error before you judge reorder points.
- Parameters first, because they drive everything
- Excess alongside shortage, not separately
- Accuracy before conclusions about stock
Using ERP reports
Most items map to standard reports: MRP exception lists, stock overview and aging reports, cycle count variance reports, open purchase order and past due reports, and inventory valuation. Save these as variants or saved searches so the review starts from the same data every month. Where a check needs a manual export, consider automating it.
Common mistakes
Reviewing only what is short, and ignoring what is excess, is the classic one; both cost money. Another is making changes without recording them, so no one knows why a parameter moved. And skipping the review in busy months is exactly when drift happens.
Frequently Asked Questions
How long should the review take?
Two to four hours for a plant with a few thousand active parts if reports are ready. It takes longer the first time while you set up saved reports. Focus on A items and exceptions.
Should this be monthly or weekly?
Monthly suits parameter and excess reviews. Shortages and past due orders need daily or weekly attention. Use this checklist monthly and the shortage log for daily work.
Who attends?
The planner leads. Invite a buyer for supplier items and finance for reserves. Many plants do the first half alone and the second half in a short meeting.
What do I do with the findings?
Record each as an action with owner and date, review last month's open actions first, and report the trend to your supply chain manager. Repeated findings point to a process cause.
If the review takes a full day because the reports are scattered, we can consolidate it into a single view from your ERP data. Ask for a review.
Related Tools
Inventory Planning Policy Document Template
A fill-in policy that sets service targets, parameter review cycles, adjustment limits and roles for inventory planning.
Supply Chain & InventoryMaterial Shortage and Expedite Log Worksheet
An editable shortage log that totals the value of short material and the days of delay, with export to Excel.
Supply Chain & InventoryInventory Adjustment Approval Request Template
A fill-in form to justify and approve a stock adjustment, with reason, value, root cause and approval lines.
Supply Chain & InventoryStockout Root Cause Report Template
A structured report to investigate a stockout, classify the cause and assign corrective actions with owners.
More Supply Chain & Inventory tools
See all- Oracle Fusion Inventory Turns and Carrying Cost Calculator
- Distribution ERP Fill Rate Calculator
- Distributor Rebate Tracking Worksheet
- Branch Transfer Planning Worksheet
- Distributor Slow-Moving Inventory Review Worksheet
- Distributor Vendor Performance Scorecard Worksheet
- Distributor GMROI Calculator
- Distributor Backorder Cost and Fill Rate Calculator
- EOQ with Vendor Minimum Order Calculator
Keep exploring
Free tools
- SyteLine MRP Health CheckDiagnose why your SyteLine MRP output is noisy or ignored, scoring data accuracy, parameters, and planner behavior across ten dimensions.
- Materials Planner Weekly Exception Review ChecklistA 30-point weekly routine for clearing MRP exceptions, protecting supply and keeping inventory parameters healthy.
- Monthly Operations Review Report TemplateFill-in monthly operations review covering delivery, quality, inventory and cost, with actions and decisions required.
ERP fixes and how-tos
- How to Use the MRP Planner Workbench in SyteLineHow planners review SyteLine MRP output in the planner workbench: read exception messages, firm and release planned orders, and reschedule supply safely.
- Infor LN Master Planning: How It Works and a Setup and Run ChecklistHow master planning works in Infor LN: planned orders, pegging, planning horizons and a practical setup and run checklist for planners and consultants.
- How to Run MRP in SyteLineRun MRP in SyteLine: choose Regenerative or Net Change, review the resulting Action Messages and planned orders, then firm and release what you accept.
Runs with your ERP
- Delfoi Planner with Oracle NetSuite: finite schedulingHow Delfoi Planner adds finite, constraint-based scheduling on top of NetSuite: reading work orders, routings and demand, writing achievable dates back.
- Delfoi Planner with SAP S/4HANA: finite scheduling for production ordersHow Delfoi Planner adds finite scheduling and a drag-and-drop Gantt to SAP S/4HANA, which data flows, how to set it up, what breaks and where private AI helps.
Guides
- Setting Up System Health Monitoring for SyteLineSet up comprehensive system health monitoring for Infor SyteLine covering SQL Server, IIS, application server, and business process KPIs with alerting thresholds.
- Sales and Operations Planning (S&OP): A Practical Guide for ManufacturersA practical sales and operations planning guide for manufacturers: monthly S&OP cadence, demand and supply review, and executive sign-off in Infor ERP.
- Security Review Checklist for Enterprise AI AgentsA security review checklist for enterprise AI agents: data residency, identity and access, prompt injection defense, logging, and vendor risk for manufacturers.
AI on your ERP
- AI for SyteLine Inventory Control and Cycle CountingAI for Infor SyteLine inventory: pick cycle counts by risk, find negative or stale stock, explain variances and review adjustments with the query shown, on-prem.
- AI for JD Edwards Inventory Management and Shop Floor ManufacturingAI on JD Edwards EnterpriseOne inventory and manufacturing: item ledger, work orders, MRP messages and cost variances, answered in plain English on your own servers.