CFDI 4.0 Invoice XML Skeleton Generator
Developers wiring an ERP to a PAC often need a valid-looking CFDI 4.0 payload before the full add-on exists. This generator produces an ingreso skeleton with the main nodes in the right order, so you can test mappings and sandbox calls.
Fill in
Format YYYY-MM-DDThh:mm:ss in local time of the issue place
Use a test RFC from your PAC sandbox
Use 99 when the method is PPD
From the SAT c_ClaveProdServ catalog; confirm the correct key for your product
H87 is piece
CFDI 4.0 ingreso skeleton
<?xml version='1.0' encoding='UTF-8'?>
<cfdi:Comprobante xmlns:cfdi='http://www.sat.gob.mx/cfd/4' xmlns:xsi='http://www.w3.org/2001/XMLSchema-instance' xsi:schemaLocation='http://www.sat.gob.mx/cfd/4 http://www.sat.gob.mx/sitio_internet/cfd/4/cfdv40.xsd'
Version='4.0' Serie='A' Folio='1042' Fecha='2026-10-20T10:30:00'
FormaPago='03' MetodoPago='PUE' Moneda='MXN'
SubTotal='25000.00' Total='29000.00' TipoDeComprobante='I'
Exportacion='01' LugarExpedicion='64000'>
<cfdi:Emisor Rfc='EKU9003173C9' Nombre='ESCUELA KEMPER URGATE' RegimenFiscal='601'/>
<cfdi:Receptor Rfc='XAXX010101000' Nombre='PUBLICO EN GENERAL' DomicilioFiscalReceptor='64000' RegimenFiscalReceptor='616' UsoCFDI='S01'/>
<cfdi:Conceptos>
<cfdi:Concepto ClaveProdServ='31162800' Cantidad='100' ClaveUnidad='H87' Descripcion='Bracket assembly BRK-1001' ValorUnitario='250.00' Importe='25000.00' ObjetoImp='02'>
<cfdi:Impuestos>
<cfdi:Traslados>
<cfdi:Traslado Base='25000.00' Impuesto='002' TipoFactor='Tasa' TasaOCuota='0.160000' Importe='4000.00'/>
</cfdi:Traslados>
</cfdi:Impuestos>
</cfdi:Concepto>
</cfdi:Conceptos>
<cfdi:Impuestos TotalImpuestosTrasladados='4000.00'>
<cfdi:Traslados>
<cfdi:Traslado Base='25000.00' Impuesto='002' TipoFactor='Tasa' TasaOCuota='0.160000' Importe='4000.00'/>
</cfdi:Traslados>
</cfdi:Impuestos>
</cfdi:Comprobante>This skeleton omits Sello, Certificado and NoCertificado, which are added when the document is signed with your CSD, and the TimbreFiscalDigital added by the PAC. Verify attribute rules, rounding and complements against the current SAT anexo 20 and your PAC documentation. Use sandbox RFCs for testing.
Test CFDI payloads from real ERP orders
We can discuss a read-only harness that generates CFDI payloads from live order data for validation before stamping.
Optional. The tool and every export work without this. No spam.
How to use the generator
Fill in the fields, copy the XML and submit it to your PAC's test endpoint after signing it with a test CSD. Change one field at a time to learn which validations trigger, for example switching the metodo de pago to PPD while keeping forma de pago 03, which should be rejected. The numeric fields are text so you control the decimals exactly; compute the subtotal and tax outside the tool and keep the amounts consistent.
- Subtotal equals the sum of line Importe values
- IVA base equals the line amount after discounts
- Total equals subtotal plus transferred taxes minus withholdings
- Dates must not be in the future relative to the PAC clock
Structure of a CFDI 4.0 document
The root is cfdi:Comprobante, with Emisor, Receptor, Conceptos and a document-level Impuestos node. Each Concepto carries its own tax breakdown when ObjetoImp is 02. Complements, such as Carta Porte, payment or foreign trade, attach under cfdi:Complemento. The signature and stamp attributes are added later in the flow. Keep the namespace and schema location exactly as published, because validators check them.
Common mistakes
Frequent causes of PAC rejections are a receiver name that differs from the SAT register, a postal code that does not belong to the stated state or municipality combination, rounding differences between line taxes and the document total, and a ClaveProdServ that does not exist in the catalog. Test with several realistic orders, including discounts, multiple tax lines and zero-rate items, not only the happy path.
Frequently Asked Questions
Is this XML ready to stamp?
No. It is a skeleton for testing. It still needs the signature attributes created with your CSD and, for real operations, correct catalog keys, tax calculations and any required complements. The PAC adds the fiscal stamp after validating the signed document.
Why are attributes in single quotes?
XML allows single or double quotes around attribute values. Single quotes keep the example easy to paste into strings in many programming languages. Your serializer will normally output double quotes, and the PAC accepts either form.
What RFC should I use for testing?
Use the test RFCs and certificates provided by your PAC's sandbox or published by the SAT for testing. Never use a real taxpayer's data in an experiment, and do not stamp test documents in production.
How do I add a Carta Porte or payment complement?
Complements are added under the cfdi:Complemento node with their own namespaces and schemas, and some change the TipoDeComprobante rules. Take the complement structure from the SAT documentation for that complement and validate with your PAC.
If you want to see CFDI generation tested against real order data from your ERP, we can help build a read-only test harness that produces payloads without stamping.
Related Tools
Mexico CFDI 4.0 SAT Catalog Codes Reference
Searchable list of the SAT catalog codes most often needed when mapping an ERP to CFDI 4.0 invoices, with plain-English meaning for each code.
Country & TaxMexico Contabilidad Electronica ERP Readiness Checklist
Check that your ERP can produce the chart of accounts, monthly trial balance and journal entry files Mexican companies submit to the SAT.
Country & TaxLatin America E-Invoicing and Tax ID Reference
One table of tax ID names, formats, e-invoice document names, authorities and VAT names for the main Latin American manufacturing markets.
Country & TaxBrazil CFOP Codes Reference for Manufacturers
Look up the CFOP operation codes manufacturers use on NF-e entries and exits, including industrialization on order, repair and import.
More Developer Tools tools
See all- IMMEX Temporary Import Balance Aging SQL Generator
- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
Keep exploring
Free tools
- CFDI 4.0 XML Skeleton GeneratorFill in a form and get a CFDI 4.0 XML skeleton with the right nodes and attributes, ready to adapt for test stamping with a PAC.
- Mexico CFDI 4.0 Invoice ChecklistCheck every CFDI 4.0 field group before your ERP stamps an invoice: issuer, receiver, concepts, taxes, payment method, complements and cancellation.
- Mexico CFDI 4.0 SAT Catalog Codes ReferenceSearchable list of the SAT catalog codes most often needed when mapping an ERP to CFDI 4.0 invoices, with plain-English meaning for each code.