Mexico Nearshore Supplier Quality Agreement Template

When a part moves to a new supplier, the purchase order alone does not tell them how you expect problems to be handled. A supplier quality agreement sets targets, approval rules, change control and corrective action in one signed document before the first lot ships.

Fill in

Live preview
Download:

Mexico Nearshore Supplier Quality Agreement Template

Supplier Quality Agreement

Between Acme Precision Inc. (Buyer) and Maquinados Norte S.A. de C.V. (Supplier) Effective date: 2026-11-01 Controlling language: Both, English controls

1. Quality system

Supplier maintains a quality management system certified to ISO 9001 or an equivalent agreed in writing. Supplier notifies Buyer within 10 business days of any suspension, loss or major nonconformity finding in certification.

2. Approval of parts and processes

Initial approval method: PPAP Level 3. Re-approval is required after any change to design, material, process, location, sub-supplier or tooling, and after production has been interrupted for longer than the agreed period.

3. Performance targets

Quality target: 500 PPM or lower defective rate Delivery target: 98 percent on time in full

Buyer reviews performance monthly and shares a scorecard. Persistent misses trigger a recovery plan and may change status on the approved supplier list.

4. Nonconformances and corrective action

Response time: 24 hours containment, 10 business days for root cause and corrective action

Supplier contains suspect product at its facility, in transit and at Buyer, identifies the root cause with evidence, and verifies the corrective action. Costs for sorting and rework are handled as agreed below.

5. Traceability and records

Supplier keeps lot, heat or batch traceability from raw material to shipment, and retains inspection and process records for the agreed period. Certificates of conformance and material certificates accompany each shipment.

6. Change control and notification

Change typeNotice requiredApproval needed
Process or equipment change90 daysYes
Sub-supplier or raw material change90 daysYes
Manufacturing location change180 daysYes
Tooling transfer or refurbishment60 daysYes
Organizational or contact change30 daysNo

7. Audit and access

Buyer may audit the Supplier's facility, records and sub-suppliers on reasonable notice. Supplier flows down applicable requirements, including customer and regulatory requirements, to its own suppliers.

Acknowledgement

Buyer quality representative / Date
Supplier quality representative / Date
Buyer procurement / Date
Supplier general manager / Date

This is a generic starting point, not legal advice. Add your industry flow-down clauses (for example customer, export control or counterfeit parts requirements), liability terms and cost recovery with counsel before you use it as a contract.

Link supplier quality data to your ERP

Optional: a review of how scorecards and nonconformance data could be unified in your ERP.

Optional. The tool and every export work without this. No spam.

How to use the template

Choose the quality system, approval method and targets that fit the part criticality, then edit the corrective action times to what you can realistically enforce. Export to Word so you can add customer-specific flow-downs, or to PDF for the supplier to review. For Mexican suppliers, a bilingual version avoids misunderstandings and the controlling language should be chosen explicitly.

  • Match the approval method to the risk of the part
  • State the controlling language when you issue two versions
  • Align corrective action times with your own customer commitments
  • Attach the drawing, specification and inspection plan as exhibits

What the agreement should cover

A useful agreement covers the quality system requirement, part approval, performance targets, containment and corrective action, traceability, notification of changes, and audit access. Change control is the clause that most often matters in practice because uncontrolled changes at a supplier cause many field failures. Define what a change is and how much notice you need.

Setting realistic targets

A PPM target must match the part and the measurement system. Setting a tight target the supplier cannot measure leads to disputes. Use delivery targets that match how you plan in the ERP, for example on time in full against the confirmed date. Review the scorecard monthly with the supplier and tie recovery plans to measurable milestones.

Common mistakes

Sending a long generic manual no one reads, leaving out sub-supplier flow-down, and not agreeing who pays for sorting and rework. Another mistake is signing the agreement but never loading approvals and scorecards in the ERP, so purchasing keeps ordering from a supplier whose status has changed.

Frequently Asked Questions

Is a quality agreement a legal contract?

It can be if both parties sign it and it is referenced by the purchase terms, but this template is a generic starting point. Have counsel review liability, cost recovery and governing law before you rely on it.

Do I need PPAP for every nearshore part?

No. PPAP is standard in automotive. Aerospace uses first article inspection under AS9102, and other sectors use sample approval. Pick the method your customer and your own risk assessment require.

Should the agreement be in Spanish?

A bilingual version is practical for shop floor clarity. Name one language as controlling to avoid disputes about translation differences, and have a qualified translator review the Spanish text.

How often should targets be reviewed?

Review performance monthly and the agreement itself annually or after a significant event. Update targets when the supplier proves stable performance or when your customer requirements change.