SAPFree calculatorPDF, Excel, Word exportSAP S/4HANAAll SAP S/4HANA (on-premise) tools

S/4HANA User Licence Cost Estimator

Licence spend is one of the few S/4HANA costs you can influence before you sign. This estimator shows how much a clean user base and a sensible split of user types change annual cost, using your own contract prices.

Your numbers

users

Dialog users in the productive client.

15 %

Users with no logon in the last 90 to 180 days, duplicates and leavers.

35 %
35 %

The remainder falls into the lowest-cost self-service type.

$ per year

Enter your contract price. This default is illustrative only.

$ per year

Enter your contract price.

$ per year

Enter your contract price.

Your results

Annual licence cost
$1,734,000
Saving vs paying all as professional
$2,106,000
Indicates the value of right-sizing user types.
Active users after cleanup
1,020
Professional users
357
Limited users
357
Self-service users
306
Average cost per active user
$1,700

SAP licence metrics, user types and prices differ by contract and change over time. Enter your own contract prices and confirm the user type definitions with your SAP account team.

Free, optional. Reopen it on any device.
Save results:

Annual licence cost vs dormant users removed

Sweeps Dormant or duplicate users to remove from 0 to 50, holding your other inputs fixed.

User clean-up analysis

Optional: discuss how to extract usage and role data to support a licence review.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Enter the number of named users, the share you expect to remove as dormant or duplicate, and the share that truly needs each user type. Add your contract prices. The remainder after professional and limited users is treated as the lowest-cost type. The output shows the user counts by type, annual cost and the saving compared with paying every active user as professional. The chart shows the effect of the clean-up.

  • Pull logon data from user master and usage statistics
  • Look for duplicate people across clients and systems
  • Review roles to find real professional use
  • Use only your own prices

The method

Active users equal named users times one minus the dormant share. Professional users are active users times the professional share. Limited users are active users times the limited share, capped so the three shares never exceed 100 percent. The rest are self-service. Annual cost is the sum of count times price for each type. The saving line compares this with the worst case in which everybody is professional, which is the usual starting point in a rushed quote.

Common mistakes

Licence classification is driven by what each user does in the system, not by job title. Roles with broad authorisations tend to pull people into higher types. Teams also forget that engines, indirect access from other systems and external users may count under separate metrics. Do the user analysis early because it also feeds role design for S/4HANA, and it gives you real data in the contract conversation.

Frequently Asked Questions

Are the default prices real SAP prices?

No. They are illustrative placeholders. SAP pricing is negotiated and depends on contract, region and bundle, so enter the prices from your own agreement.

How do I find dormant users?

Use last logon dates from the user master and usage statistics, and compare with HR leaver lists. A common threshold is no logon in 90 to 180 days, with a review step before locking accounts.

Does this cover RISE contracts?

It is a general user-type model. RISE and other bundles may price differently or include some user types, so adapt the inputs to match what your contract actually counts.

Can I change user types after signing?

Often yes within contract rules, but check the terms for true-up and true-down. Do the analysis before signing because it is the strongest moment for negotiation.

Netray can build a private assistant over your authorisation and usage data so licence reviews are repeatable instead of a once-in-five-years scramble.

Get SAP S/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP S/4HANA sites, and new free SAP S/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP S/4HANA: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP S/4HANA? Start with the SAP S/4HANA guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.

Keep exploring