MES & Shop FloorFree templatePDF, Excel, Word exportPlastics

Molding Process Window Study Record Template

A process sheet records the settings that make good parts on a particular mold and press, so the next setup starts from a known point. This template gives you a clean printable sheet with the essentials and blank zones to fill in at the machine.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Molding Process Window Study Record Template

Molding Process Window Study Record

Company: Acme Plastics Ltd Part: PN-30417 - Housing cover Mold: M-1182 (4 cavities) Machine: Press 14, 200 ton Date: 2026-10-20

Material and Drying

Resin: PP copolymer, MFI 20 Resin lot: L-55120 Drying temperature: Not required Drying time: Not required

Key Process Settings

ParameterSettingActualInitials
Melt temperature230 deg C
Mold temperature40 deg C
Injection pressure limit120 bar
Hold pressure55 bar
Hold time5.0 s
Cooling time11.0 s
Shot size and cushion62 mm, cushion 6 mm
Total cycle time22.5 s

Barrel and Nozzle Zones

ZoneSetpointActual
Feed throat
Zone 1
Zone 2
Zone 3
Nozzle
Hot runner / manifold

Process Window Trials (low, nominal, high)

Parameter variedLowNominalHighResult (parts good / bad)
Melt temperature230 deg C
Mold temperature40 deg C
Hold pressure55 bar
Hold time5.0 s
Cooling time11.0 s

Notes

Check vents every 4 hours. Regrind up to 15 percent allowed. Record cushion at start of each shift.

Approvals

Process engineer / Date
Setup technician / Date
Quality / Date

A starting point for your own controlled document. Add your document number, revision and any fields your customer or quality system requires. Settings shown are examples, not recommendations.

Link process sheets to molds in your ERP

Optional: we can review how mold and routing records are held in your ERP and where process data could attach.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Fill the header fields for part, mold, machine and resin, then enter the approved settings. The Actual column and zone table are left blank for the technician to complete at setup or each shift. Export to PDF or Word for the press-side binder, or to Excel to build a library of approved processes by mold. Update the revision whenever settings change and keep old versions.

What to record

The critical items are material and drying conditions, melt and mold temperature, injection pressure limit, hold pressure and time, cooling time, shot size and cushion, and total cycle time. Add injection speed profile, back pressure, screw rpm, decompression, ejection settings and hot runner temperatures where your process depends on them. Scientific molding practice also records fill time and transfer position.

  • Use units on every value, such as bar or psi, mm or inches
  • Record the cushion since it indicates check ring and packing consistency
  • Note the date and who approved the process

Keeping sheets useful

A process sheet is only as good as its upkeep. Link it to the mold and the part revision, review it after any mold repair, and treat changes as controlled, not casual. For regulated customers, the process window and its validation evidence belong with the sheet. Print the Actual column on the first part approval so drift from the baseline is visible.

Common mistakes

Recording settings from a good day without noting the material lot, saving values in only one unit, leaving out drying details for hygroscopic resins, and not updating the sheet after process improvements. Another is recording setpoints but not the actual readings, which hides heater faults and sensor drift.

Frequently Asked Questions

What is a process sheet in injection molding?

It is a controlled record of the machine settings, material and conditions used to make approved parts with a specific mold. It lets another technician or shift reproduce the same process without guesswork.

Which settings are most important to record?

Material and drying, melt and mold temperature, pressures, hold time, cooling time, shot size with cushion, and the cycle time. Add speed profile and transfer position if your process relies on them.

How often should the sheet be updated?

Update it whenever an approved setting changes, after a mold repair or a resin change, and at scheduled reviews. Keep old revisions for traceability.

Can I use it for customer audits?

It can form part of your documented process control, but add your own document control fields and any customer required items. This template is a starting point rather than a certified form.

Netray can attach process parameter sheets to molds and routings in your ERP or MES, so setup data travels with the job instead of living in binders.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

Guides

AI on your ERP

Manufacturing hubs