Injection Molding Defects Troubleshooting Guide
When a part comes out wrong, a structured list of likely causes saves time at the press. This reference table groups common injection molding defects by process area and lists the causes and first checks that usually resolve them.
| Defect | Main area | What you see | Common causes | First checks |
|---|---|---|---|---|
Short shot | Fill | Cavity not completely filled, missing corners or ribs | Low shot size, low injection pressure or speed, cold melt or mold, blocked vent or gate, worn check ring | Shot size and cushion, melt and mold temperature, vents, check ring |
Flash | Mold | Thin excess plastic at the parting line or around pins | Clamp force too low, worn parting line, excess pack pressure, high melt temperature, vents too deep | Clamp tonnage, parting line condition, pack and hold pressure |
Sink marks | Pack and cool | Depressions over thick sections, ribs or bosses | Low pack pressure or time, gate freezes early, thick walls, hot mold, rib too thick | Hold pressure and time, gate size, rib to wall ratio |
Voids | Pack and cool | Internal bubbles in thick sections | Insufficient packing, early gate freeze, volatile moisture in material, melt too hot | Pack time, gate seal time, resin drying |
Weld lines | Fill | Visible line or weak seam where flow fronts meet | Cold flow fronts, low injection speed, poor venting at the meeting point, gate location | Melt temperature, injection speed, vents at the line |
Burn marks | Fill | Dark or brown marks at the end of fill | Trapped air compressed by fast injection, blocked vents, overheated melt, long residence time | Vent cleanliness, injection speed, melt temperature |
Splay or silver streaks | Material | Silver streaks along the flow direction | Moisture in hygroscopic resin, volatiles, high melt temperature, excess decompression | Dryer temperature and dew point, drying time, decompression |
Warpage | Pack and cool | Part bends or twists after ejection | Uneven cooling, differential shrinkage, high ejection temperature, high packing stress, orientation | Cooling balance, mold temperature split, cooling time |
Jetting | Fill | Snake-like flow pattern from the gate | Melt jets into open cavity, fast initial injection speed, gate facing open space | Initial injection speed, gate type and location |
Flow lines | Fill | Wavy lines or rings near the gate | Cold melt or mold, slow fill, thin sections after thick ones | Melt and mold temperature, fill speed profile |
Delamination | Material | Surface layers peel off like skin | Contamination with another resin, moisture, excessive shear, wrong regrind | Material contamination, drying, regrind source |
Black specks | Material | Dark particles in the part | Degraded resin in the barrel or hot runner, contamination, long residence time | Purge, residence time, hot runner temperatures, material handling |
Ejector marks | Mold | Pin impressions or whitening on the part | Part too hot or too soft, uneven ejection, high ejector speed, insufficient draft | Cooling time, ejector speed and position, draft |
Drag marks | Mold | Scratches along the ejection direction | Insufficient draft, rough or undercut cavity, heavy packing | Draft angle, surface polish, pack pressure |
Brittleness | Material | Parts crack under light load | Degraded polymer, excess regrind, moisture hydrolysis, residual stress, wrong grade | Drying, regrind ratio, melt temperature, residence time |
Gate blush | Fill | Dull ring or halo around the gate | High shear at the gate, fast injection, small gate | Injection speed at gate, gate size, melt temperature |
Nozzle drool | Machine | Resin leaks from the nozzle between shots | Nozzle too hot, excess decompression, wrong back pressure, open nozzle type | Nozzle temperature, decompression, nozzle style |
Inconsistent shot weight | Machine | Part weight varies shot to shot | Worn check ring or screw, inconsistent cushion, feed throat problems, variable melt | Cushion variation, check ring, feed throat temperature |
General guidance only. Always change one parameter at a time, wait for the process to stabilise, and record the change. Confirm material limits with the resin supplier.
Track defects by mold and resin lot
Optional: we can review your defect coding and inspection records and show how to analyze them by mold, press and lot.
Optional. The tool and every export work without this. No spam.
How to use it
Search or filter by the defect name or by what you see on the part. The main area tells you where to start: fill problems relate to melt, speed and venting, pack and cool problems to hold pressure and cooling, material problems to drying, contamination and degradation, mold problems to venting, wear and ejection, and machine problems to screw, check ring and nozzle. Export the table to Excel to add your own plant specific notes.
A disciplined approach
Defects often have several causes, so a table narrows the field but does not decide it. Start with material, since moisture and contamination mimic process faults. Then confirm the process is stable using cushion and shot weight. Change one variable at a time and wait for several cycles before judging. Document the setting that fixed the defect on the process sheet, because the next shift will meet the same problem.
- Check the material and drying records first
- Check cushion and shot weight repeatability
- Adjust one parameter, wait, then re-evaluate
- Log the cause and fix for the next time
Defects that mislead
Splay is often blamed on the mold but is frequently moisture. Flash looks like a clamp problem but may be excess pack or a worn parting line. Sink and voids are the same mechanism in different places: shrinkage with no melt available to feed it. Warpage can be a cooling issue, a packing issue or a design issue, and should be studied across several parts.
Common mistakes
Changing several settings at once, adjusting the process to hide a worn mold, ignoring regrind ratio, and fixing the symptom without recording it. Another frequent error is raising melt temperature to cure everything, which can trade one defect for degradation and longer cooling.
Frequently Asked Questions
What causes most short shots?
Usually insufficient melt reaching the cavity: low shot size, low injection pressure or speed, cold melt or mold, or blocked vents and gates. Check shot size and cushion first, then temperatures and vents.
How do I tell flash from a clamp problem?
Look at where it appears and whether it grows with pack pressure. Flash at a worn parting line or along pins points to the mold. Flash that disappears when pack or injection pressure drops points to process.
Why do I get splay with dried material?
Moisture can be re-absorbed between the dryer and the barrel, or the dryer may not reach its dew point. Also check excess decompression, high melt temperature and residence time, which create volatiles.
Is this table complete?
No. It covers frequent defects with typical causes. Your resin, mold and machine will have specific behaviors, so add your own notes after export.
Netray can connect defect codes captured at inspection to molds, machines and resin lots in your ERP, so repeat problems show up in a report instead of a memory.
Related Tools
Molding Process Window Study Record Template
A fill-in record for the approved process and a low, nominal, high process window study on a mold and machine combination.
Discrete ManufacturingBarrel Residence Time Calculator
Estimate how long resin sits in the barrel and how much of the machine capacity a shot uses, to spot degradation risk from oversized presses.
MES & Shop FloorInjection Molding OEE Calculator
Calculate availability, performance, quality and overall equipment effectiveness for a molding press from a shift or day of production data.
Discrete ManufacturingMold Shrinkage Cavity Dimension Calculator
Compute the cavity dimension needed to hit a nominal part size after the resin shrinks, and see how much of the tolerance shrinkage variation consumes.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Injection Molding Defects, Causes and Fixes ReferenceA searchable troubleshooting table for common molded part defects, with the usual causes and the first adjustments to try.
- Injection Molding Process Sheet TemplateA fill-in setup sheet that records the validated process window for a mold, press and resin, ready to print or export.
- Injection Molding Job Costing Review ChecklistA 38-point review of a molded part quote or actual job cost, grouped into material, process, tooling, overhead and terms, with the critical omissions marked.
Guides
- Injection Molding Job Costing: Finding Where Quoted Margin DisappearsHow injection molders find margin leaks: compare quoted and actual cycle, scrap, resin and downtime by job and part, and fix machine rates and overhead.
- How to Quote Injection Molding Jobs FasterHow injection molders cut RFQ turnaround: standard cost build-up, cycle time and press selection rules, resin pricing, and where AI drafts quotes for review.
- Best ERP for Injection Molders: What to Check Before You BuyWhat to look for in ERP for injection molders: mold and press tracking, resin lots, MES integration, scrap and regrind, and how DELMIAworks, Plex and Epicor compare.
AI on your ERP
- AI on Infor SyteLine for Plastics Injection Molders: Presses, Molds, Resin and ScrapAI on Infor SyteLine for injection molders: mold and press scheduling, resin and regrind lots, scrap and cycle variance, on-prem and read-only by default.
- Epicor Kinetic AI for Injection Molders: Resin, Tooling, Scrap and Cycle Time Questions AnsweredPrivate AI on Epicor Kinetic for injection molders: query resin lots, tooling, scrap and cycle-time variance in plain English, with the query shown.