Nadcap Compliance Checklist and Requirements for Nadcap Certification

Nadcap is the industry accreditation program for aerospace special processes, administered by PRI. This checklist turns the requirements for Nadcap certification into 36 items you can check against records before the auditor arrives. It is built around what is audited, not around marketing claims.

0%

0 of 36 items complete

16 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Scope, Application and Audit Planning

Quality System Baseline

Personnel, Equipment and Calibration

Process Control and Product Evidence

Commodity-Specific Readiness

Findings, Merit and Sustainment

Count the items you can prove with a record today. Items marked critical are the ones that most often lead to nonconformances at a Nadcap audit. Below 80 percent complete, plan a second self-audit before the audit date.

Nadcap evidence search on your own servers

Optional: we can review how your travelers, calibration and NCR records could be searched privately so audit sample requests are answered quickly.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use this checklist

Run it as a self-audit one to three months before the scheduled audit. For each item, ask for the actual record, not for a statement that the record exists. Mark items complete only when you could hand the record to an auditor in under a few minutes. Assign an owner and a date to every open item, and rerun the checklist after corrective actions. Use it with the official Nadcap audit criteria for your commodity, which are the authority on each requirement.

  • Pick records at random from last year, not the best jobs
  • Include the night shift and the weekend crew in the review
  • Practice the job-audit walk: pick a finished job and trace it end to end
  • Fix systemic causes before the audit, not just individual jobs

What certification actually requires

Nadcap accreditation is process specific. A supplier applies for the commodities it needs, a trained auditor assesses the quality system and the process against standardized audit criteria, and a task group of primes and suppliers reviews the results. Customers decide which accreditation they require, so the first step is to ask your customers which processes and commodities they require. Accreditation then depends on closing audit nonconformances in time and sustaining performance through recurring audits. Merit status, earned with strong audit results, can extend the interval between audits.

Commodity differences to plan for

The quality system layer is similar across commodities, but the technical evidence differs. Heat treat auditors look hard at pyrometry, furnace classes, and load records. Chemical processing auditors look at bath analysis, tank control, and test panels. NDT auditors look at personnel certification, procedures, and the reference standards. Coating and welding auditors look at surface preparation, parameter control, and qualification records. Prepare the evidence file for each commodity separately and name an owner for each.

Common mistakes

The most frequent audit problems are not exotic: out-of-date specification revisions at the point of use, calibration or pyrometry lapses, parameters recorded but not compared to limits, and corrective actions that fix one job and leave the cause in place. A second pattern is late or shallow responses. Treat the response clock as a project with an owner. If your ERP or MES holds job records, make sure the audit sample can be pulled in minutes.

Frequently Asked Questions

What are the main requirements for Nadcap certification?

You need a customer that requires accreditation, a quality system that meets the aerospace baseline, process control and records that satisfy the commodity audit criteria, calibrated equipment and qualified personnel, and timely closure of audit findings. Details differ by commodity, so use the official audit criteria for yours.

Is Nadcap the same as AS9100 certification?

No. AS9100 certifies an organization's quality management system. Nadcap accredits specific special processes, such as heat treating or NDT, against detailed technical audit criteria. Many Nadcap commodities expect an AS9100-based quality system as a foundation.

How long does it take to prepare for a Nadcap audit?

It depends on your starting point. A shop with a mature AS9100 system and good records may need weeks of focused preparation. A shop closing technical gaps such as pyrometry or procedures may need several months. Start with a self-audit to size the gap.

What happens if I get nonconformances at the audit?

You respond with containment, root cause, and corrective action within the response period set by the program, then the evidence is reviewed. Unresolved or late findings delay accreditation. Responses that address the system cause, not one job, are accepted more readily.

If your job travelers, calibration dates, and nonconformance records live in an ERP, we can build a private search over them that finds audit evidence on your own servers. Ask for a review of your Nadcap evidence flow.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP

Manufacturing hubs

TermsNadcap