NetSuite SuiteQL in SuiteScript: runSuiteQL and runSuiteQLPaged Generator
This generator wraps a SuiteQL statement in working SuiteScript 2.1 N/query code: a single runSuiteQL call, a runSuiteQLPaged loop over every page, or the promise form for client scripts. Parameters are bound with ? placeholders and the paged version checks remaining governance before each page.
Fill in
Use single quotes inside the SQL. Keep a unique ORDER BY for paged runs.
One value per ? in order. Strings, numbers or booleans only.
Option A: runSuiteQL (one call, small result sets)
/**
* @NApiVersion 2.1
* @NScriptType ScheduledScript
*/
define(['N/query', 'N/runtime', 'N/log'], (query, runtime, log) => {
const SQL = "SELECT t.id, t.tranid, BUILTIN.DF(t.entity) AS customer, t.foreigntotal FROM transaction t WHERE t.type = ? AND t.trandate >= TO_DATE(?, 'YYYY-MM-DD') ORDER BY t.id";
const PARAMS = ['CustInvc', '2026-01-01'];
const execute = (context) => {
const resultSet = query.runSuiteQL({
query: SQL,
params: PARAMS,
customScriptId: 'netray_open_invoices_2026'
});
const rows = resultSet.asMappedResults();
log.audit({ title: 'runSuiteQL rows', details: rows.length });
rows.forEach((row) => {
// keys are the column aliases, returned in lowercase
log.debug({ title: 'row ' + row.id, details: JSON.stringify(row) });
});
log.audit({ title: 'remaining usage', details: runtime.getCurrentScript().getRemainingUsage() });
};
return { execute };
});Option B: runSuiteQLPaged (all pages)
/**
* @NApiVersion 2.1
* @NScriptType ScheduledScript
*/
define(['N/query', 'N/runtime', 'N/log'], (query, runtime, log) => {
const SQL = "SELECT t.id, t.tranid, BUILTIN.DF(t.entity) AS customer, t.foreigntotal FROM transaction t WHERE t.type = ? AND t.trandate >= TO_DATE(?, 'YYYY-MM-DD') ORDER BY t.id";
const PARAMS = ['CustInvc', '2026-01-01'];
const MIN_UNITS = 200;
const execute = (context) => {
const script = runtime.getCurrentScript();
const paged = query.runSuiteQLPaged({
query: SQL,
params: PARAMS,
pageSize: 1000,
customScriptId: 'netray_open_invoices_2026'
});
log.audit({ title: 'total rows / pages', details: paged.count + ' / ' + paged.pageRanges.length });
let processed = 0;
for (const range of paged.pageRanges) {
if (script.getRemainingUsage() < MIN_UNITS) {
log.audit({ title: 'stopping early', details: 'page index ' + range.index + ', rows done ' + processed });
break;
}
const page = paged.fetch({ index: range.index });
page.data.asMappedResults().forEach((row) => {
// process row here, for example row.tranid, row.customer, row.foreigntotal
processed += 1;
});
}
log.audit({ title: 'rows processed', details: processed });
};
return { execute };
});Option C: runSuiteQL.promise (SuiteScript 2.1 client script)
/**
* @NApiVersion 2.1
* @NScriptType ClientScript
*/
define(['N/query'], (query) => {
const pageInit = (context) => {
query.runSuiteQL.promise({
query: "SELECT t.id, t.tranid, BUILTIN.DF(t.entity) AS customer, t.foreigntotal FROM transaction t WHERE t.type = ? AND t.trandate >= TO_DATE(?, 'YYYY-MM-DD') ORDER BY t.id",
params: ['CustInvc', '2026-01-01']
}).then((resultSet) => {
const rows = resultSet.asMappedResults();
console.log('SuiteQL rows', rows.length, rows[0]);
}).catch((e) => {
console.error('SuiteQL failed', e.name, e.message);
});
};
return { pageInit };
});Verify for your account: runSuiteQL and runSuiteQLPaged are 10 usage units per call in Oracle help; check the cost of PagedData.fetch on your release before tuning MIN_UNITS. Keep a unique ORDER BY when paging or rows can repeat or go missing. If the SQL contains double quotes, replace them with single-quoted literals before pasting.
Send us a slow SuiteQL query
Share the SQL and the script type it runs in and we will suggest paging, joins or a map/reduce split, with the expected usage per run.
Optional. The tool and every export work without this. No spam.
How to use it
Paste a SuiteQL statement you have already tested in a query tool or the SuiteQL workbook, replace every literal that changes with ? and list the values in the parameters array in the same order. Pick Option A when you expect a few thousand rows or fewer, Option B for anything that may grow, and Option C only for a client script that must not block the form. Upload the file to the File Cabinet, create the script record and a deployment, then run it from the deployment with Save and Execute. The default query reads invoices from 1 January 2026 with the customer display name through BUILTIN.DF.
- params accepts strings, numbers and booleans; pass dates as strings and convert them with TO_DATE in the SQL.
- pageSize must be between 5 and 1000; the default when omitted is 50.
- customScriptId is an optional label Oracle uses to trace slow queries; make it unique per query.
Row limits: what the help says and what developers see
SuiteScript developers widely report that a single ResultSet from runSuiteQL holds at most 5,000 rows, whatever the query would return. Treat 5,000 as the ceiling for Option A and use the paged loop, or keyset paging on t.id, for anything larger. The paged API has its own total result limit, so check the runSuiteQLPaged entry in the help for your release before relying on it for very large extracts. On governance, the runSuiteQL or runSuiteQLPaged call itself costs 10 units and each page fetch also consumes usage, so a run of 50 or more pages can spend hundreds of units on fetches alone in a 10,000-unit scheduled script.
- Without a unique ORDER BY, paging can return duplicate or missing rows.
- Read values by the aliases you wrote in the SELECT list; asMappedResults returns them as lowercase keys.
Gotchas that break SuiteQL in scripts
Never build the WHERE clause by string concatenation: bound parameters avoid quoting bugs with names such as O'Brien and stop injection when values come from a Suitelet or RESTlet. Dates passed as plain strings are interpreted in the running user's date format preference, so the template uses TO_DATE(?, 'YYYY-MM-DD') to make the parameter format explicit. asMappedResults keys come back lowercase, so an alias written as CustomerName is read as row.customername. Records or fields the executing role has no permission for make the query fail or return fewer rows, which is a common reason a query that works for an administrator fails in a scheduled deployment running as another role.
How to check the result in NetSuite
Open Customization, Scripting, Script Execution Logs (or the deployment's Execution Log subtab) and compare the rows and pages audit entry against the same SQL in your query tool. Spot-check two or three tranid values against the transaction screens. If the remaining usage figure drops faster than expected, the cost is in your per-row processing (record.load and save), not in the query, and the work belongs in a map/reduce script instead.
Frequently Asked Questions
How do I use SuiteQL in NetSuite scripts?
Load the N/query module and call query.runSuiteQL({ query, params }) for a ResultSet, or query.runSuiteQLPaged({ query, params, pageSize }) for PagedData. Read rows with asMappedResults() to get objects keyed by column alias, or with the results property to get arrays of values in column order. Both are available in SuiteScript 2.x server scripts; 2.1 is recommended.
Why does runSuiteQL stop at 5,000 rows?
Developers consistently see a single runSuiteQL ResultSet capped at 5,000 rows, with no error raised when more rows match. The reliable approach is runSuiteQLPaged with a unique ORDER BY, fetching each page range, or keyset paging where each call asks for id greater than the last id seen, which also keeps each call cheap.
How many governance units does runSuiteQL use?
Oracle help lists 10 usage units for query.runSuiteQL and 10 for query.runSuiteQLPaged. Fetching pages also consumes usage, so check the PagedData.fetch entry for your release. Usage limits depend on the script type: 10,000 units for a scheduled script, 5,000 for a RESTlet and 1,000 for a user event or Suitelet.
Should I use runSuiteQL or runSuiteQLPaged?
Use runSuiteQL when the result is small and bounded, such as a lookup or a summary with GROUP BY, because it is one call and returns a ResultSet directly. Use runSuiteQLPaged with a unique ORDER BY when the row count can grow past 5,000, and fetch each page range in a loop while checking remaining usage. For very large extracts, a map/reduce script with a SuiteQL input stage spreads the work.
If you want planners and finance users to ask these SuiteQL questions in plain English against NetSuite, with the generated query shown and role permissions respected, we can set that up on your own infrastructure.
Related Tools
NetSuite RESTlet Batch Size Calculator
Find the largest safe batch per RESTlet call from usage units, payload size and execution time, plus the number of calls and wall-clock time.
NetSuiteNetSuite SuiteQL Transaction Query Generator
Pick a transaction type, date range and row limit and get ready-to-run SuiteQL for headers, lines and the REST call that executes it.
NetSuiteNetSuite SuiteQL Pagination Time Calculator
Calculate pages, round trips and total extraction time for a large SuiteQL result set, and see how page size and parallel threads change it.
NetSuiteNetSuite SuiteScript Governance Units Estimator
Estimate how many records a SuiteScript execution can process under its governance limit and how many runs a batch will need.
More Developer Tools tools
See all- NetSuite SuiteScript 2.1 RESTlet Skeleton Generator
- NetSuite SuiteScript Governance Units by Script Type
- NetSuite API Retry Backoff Wait Time Calculator
- NetSuite OAuth 2.0 Access Token Refresh Calculator
- NetSuite REST Web Services Headers and Query Parameters Reference
- SuiteScript 1.0 to 2.1 API Mapping Reference for NetSuite
- NetSuite REST API SuiteQL Request Generator
- NetSuite REST API Sales Order and Journal Entry Request Generator
- NetSuite Token-Based Auth OAuth 1.0 Signature Code Generator
New to NetSuite? Start with the NetSuite guide and toolkit, or plan with NetSuite Cost Calculator, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- SuiteScript search.create Snippet GeneratorBuild a ready-to-paste N/search snippet with a filter, three columns and a paged result loop that respects governance.
- SuiteQL Query GeneratorFill in a table, columns, filter and sort and get a SuiteQL statement ready for the N/query module, the REST SuiteQL endpoint or the SuiteAnalytics Workbook.
- NetSuite SuiteScript 2.1 RESTlet Skeleton GeneratorFill in a script name, record type and fields to get a SuiteScript 2.1 RESTlet with GET lookup, POST create, logging and error handling.
ERP fixes and how-tos
- N/query versus N/search: choosing the right SuiteScript data access moduleCompare NetSuite's N/query (SuiteQL) and N/search modules for performance, governance cost and capability, and decide which to use for joins, aggregation, sublist reads and large exports in SuiteScript 2.1.
- How to write and run SuiteQL queries in NetSuiteRun SuiteQL from Analytics > SuiteQL Query Tool or via N/query in SuiteScript. Syntax basics, joins, pagination and real examples for NetSuite reporting.
- Fix NetSuite SSS_USAGE_LIMIT_EXCEEDED ErrorSSS_USAGE_LIMIT_EXCEEDED means your SuiteScript ran out of governance units. Learn the cause, how to check usage, and fixes using submitFields and Map/Reduce.
AI on your ERP
- AI for NetSuite, Beyond the Built-In Text ToolsNetSuite's built-in AI covers text generation, not grounded answers on your own data. See how a private LLM over SuiteQL adds real Q&A and controls.
- AI agents for NetSuite manufacturing operationsAI agents for NetSuite manufacturing: WIP tracking, routing exceptions, and work order status grounded in SuiteQL, with human approval on anything that writes back.
Integrations
- How to add WhatsApp to Oracle NetSuiteHow to connect WhatsApp Business to Oracle NetSuite: SuiteScript triggers, RESTlets, template messages, opt-in rules and two-way replies that post back to records.
- How to connect Slack to Oracle NetSuiteAdd Slack to Oracle NetSuite: build a Slack app with slash commands, interactive approvals and alerts using SuiteScript, RESTlets and SuiteQL, with security notes.