Nonconforming Product Control Audit Checklist
Nonconforming product control is one of the most audited processes in any plant. Use this checklist to walk the floor and the records, and to find gaps before an external auditor does.
0 of 31 items complete
11 critical items still open - these are the highest-risk gaps.
Identification and segregation
Reporting and disposition
Rework, repair and scrap
Records, analysis and corrective action
Count conforming items per group. Any failed critical item is a finding to raise in the audit report, even if the overall score is high. Sample real NCRs and physical locations, not just procedures.
Quarantine-to-ERP reconciliation report
Optional: discuss a read-only report that flags blocked stock with no matching NCR.
Optional. The tool and every export work without this. No spam.
How to run the audit
Go to the floor, not the office. Start in the quarantine area and trace three tagged items back to their NCRs and their ERP status. Then pick three closed NCRs and trace forward to the disposition, rework or scrap record and any corrective action. Mark each item as pass or fail as you go. Export the completed checklist to PDF for the audit report, or to Excel to track follow-up on each finding.
What good looks like
In a well-controlled plant, you can ask anyone where nonconforming product goes and get the same answer. The physical quarantine and ERP status agree, each tag has an NCR number, and dispositions are made by named people within a defined time. Scrap leaves the area marked and recorded. Where a customer requires approval for use as is or repair, the approval is attached to the record and not buried in an email.
- Physical stock and ERP status agree
- Named, authorized disposition authority
- Rework reinspected against the original requirement
- Customer approvals on file where required
Common findings
Common findings include untagged material at machines, quarantine bins that are also used for good parts, use as is decisions with no justification, rework with no reinspection record, and open NCRs that are months old. Another is inventory blocked in the ERP that no longer exists physically. Treat repeated findings as a system issue: ask what in the process makes the shortcut easy, and address it through the procedure, tools or training.
Frequently Asked Questions
How often should this audit be done?
Many plants audit the process at least annually as part of the internal audit program, and risk-based plants audit higher-risk areas more often. A short floor walk monthly is a useful supplement.
What is the difference between rework and repair?
Rework brings a product into conformance with the original requirement. Repair makes it usable but it may not meet the original requirement, so it often needs engineering justification and sometimes customer approval.
Who can authorize use as is?
Only people named in your procedure, usually quality and engineering together, and the customer when the contract requires. Production operators and supervisors should not have this authority alone.
Should scrap be recorded in the ERP?
Yes. Recording scrap with a reason code lets you analyse cost and trends, supports inventory accuracy, and gives evidence that nonconforming product did not return to stock.
If reconciling physical quarantine stock with ERP blocked stock is a recurring audit finding, we can help build a read-only exception report over your ERP.
Related Tools
Nonconformance and Corrective Action Standards Clause Map
A lookup of clause numbers that cover nonconforming outputs, corrective action and related controls in ISO 9001, AS9100D, IATF 16949 and ISO 13485.
Quality & Inspection8D Steps D0 to D8 Reference Table
A searchable table of every 8D discipline from D0 to D8 with its purpose, expected outputs and the mistakes that get reports rejected.
Quality & InspectionCAPA Program Maturity Assessment
Ten questions that score how well your CAPA process finds real causes, closes on evidence and uses data to prevent recurrence.
Developer ToolsNCR Pareto and Repeat Offender SQL Generator
Fill in your NCR table and column names to get ready-to-run SQL for a defect Pareto with cumulative percent and a repeat offender list.
More Quality & Inspection tools
See all- SAP QM Process Capability Cp Cpk Calculator
- SAP QM Lot Rejection Rate, PPM and Sigma Level Calculator
- SAP QM Gauge R&R Study Calculator
- SAP QM Cp and Cpk Capability Calculator
- Job Shop Material Certification Log Worksheet
- Job Shop First Piece Inspection Sign-Off Template
- Job Shop Scrap and Rework Cost Calculator
- Master Data Audit Sample Size Calculator
- Data Quality Sigma Level Calculator
Keep exploring
Free tools
- Inspection Station Audit ChecklistAudit an incoming, in process or final inspection station for gauges, calibration, environment, documentation and nonconforming material control.
- Nonconforming Material Hold Tag and Disposition Record TemplateA printable hold tag plus a disposition record for material that fails inspection, with approval lines for the review board.
- IATF 16949 Product Audit and Supplier Audit ChecklistAn editable, scored worksheet with product audit checks and second-party supplier audit questions mapped to IATF 16949 clauses, exporting to Excel.