OracleFree referencePDF, Excel, Word exportOracle E-Business SuiteAll Oracle E-Business Suite tools

Oracle EBS 12.2 File System, Log File Locations and Control Scripts

A lookup of where things live in an Oracle EBS 12.2 installation: the environment variables, the log files admins search for every week and the control scripts that start and stop each tier. Each row shows the 12.1 equivalent for teams that support both.

Download:
ItemGroupValue or path patternWhat it is for12.1 equivalent
EBSapps.env
Environment variable
. <EBS_BASE>/EBSapps.env run (or patch)
Sets the environment for the run or the patch file system
APPS<CONTEXT_NAME>.env under the APPL_TOP
RUN_BASE
Environment variable
<EBS_BASE>/fs1 or fs2, whichever is currently run
Root of the run file system; switches at each cutover
None (single file system)
PATCH_BASE
Environment variable
<EBS_BASE>/fs2 or fs1, the other one
Root of the patch file system that adop patches
None
NE_BASE
Environment variable
<EBS_BASE>/fs_ne
Non-editioned file system shared by both editions: concurrent logs and output, adop logs
None
FILE_EDITION
Environment variable
run or patch
Tells you which file system the current shell is set for; check before editing any file
None
APPL_TOP
Environment variable
$RUN_BASE/EBSapps/appl
Product tops ($ONT_TOP, $PO_TOP, custom tops)
<base>/apps/apps_st/appl
COMMON_TOP
Environment variable
$RUN_BASE/EBSapps/comn
Java classes, HTML, shared utilities
<base>/apps/apps_st/comn
ORACLE_HOME (apps tier)
Environment variable
$RUN_BASE/EBSapps/10.1.2
Forms and Reports 10.1.2 tools home
<base>/apps/tech_st/10.1.2
FMW_HOME
Environment variable
$RUN_BASE/FMW_Home
Fusion Middleware home: WebLogic Server, web tier, oracle_common
None; 12.1 used OC4J in the 10.1.3 home
IAS_ORACLE_HOME
Environment variable
$FMW_HOME/webtier
Oracle HTTP Server and OPMN web tier home
<base>/apps/tech_st/10.1.3
EBS_DOMAIN_HOME
Environment variable
$FMW_HOME/user_projects/domains/<EBS domain name>
WebLogic domain: AdminServer, oacore, forms, oafm managed servers
None
INST_TOP
Environment variable
$RUN_BASE/inst/apps/<CONTEXT_NAME>
Instance-specific configuration, scripts and logs
<base>/inst/apps/<CONTEXT_NAME>
ADMIN_SCRIPTS_HOME
Environment variable
$INST_TOP/admin/scripts
Apps tier start/stop and AutoConfig scripts
Same, $INST_TOP/admin/scripts
CONTEXT_FILE
Environment variable
$INST_TOP/appl/admin/<CONTEXT_NAME>.xml
Applications context file; AutoConfig regenerates configuration from it
Same location under 12.1 INST_TOP
APPLCSF
Environment variable
Typically $NE_BASE/inst/<CONTEXT_NAME>/logs/appl/conc
Top for concurrent request log and output files; on fs_ne so logs survive cutover
$INST_TOP/logs/appl/conc
APPLLOG / APPLOUT
Environment variable
log / out (subdirectories under $APPLCSF)
Concurrent log and output subdirectory names
Same
APPLTMP / APPLPTMP
Environment variable
Instance temp directory / a directory the database can write to
Temporary files for programs; APPLPTMP must match a directory usable by PL/SQL file I/O on the DB server
Same variables
Concurrent request log
Log location
$APPLCSF/$APPLLOG/l<request_id>.req
Log of one concurrent request
Same pattern under 12.1 APPLCSF
Concurrent request output
Log location
$APPLCSF/$APPLOUT/o<request_id>.out (default naming)
Output of one concurrent request
Same
Internal Concurrent Manager log
Log location
$APPLCSF/$APPLLOG/<SID>_MMDD.mgr
ICM log; first place to look when managers will not start
Same
Workflow mailer log
Log location
$APPLCSF/$APPLLOG/FNDCPGSC<process_id>.txt
Log of the Workflow Mailer and agent listener service process
Same
adop logs
Log location
$NE_BASE/EBSapps/log/adop/<session_id>/
Logs for every adop phase, per session and node
None; adpatch logs in $APPL_TOP/admin/<SID>/log
AutoConfig logs
Log location
$INST_TOP/admin/log/<MMDDhhmm>/
adconfig.log and related files for each AutoConfig run
Same pattern
WebLogic managed server logs
Log location
$EBS_DOMAIN_HOME/servers/<oacore_server1 | forms_server1 | oafm_server1 | AdminServer>/logs/
<server>.log and <server>.out; oacore logs for OA Framework page errors
OC4J logs under $INST_TOP/logs/ora/10.1.3/j2ee
Oracle HTTP Server logs
Log location
$IAS_ORACLE_HOME/instances/<instance>/diagnostics/logs/OHS/<component>/
Access and error logs for the web listener
$INST_TOP/logs/ora/10.1.3/Apache
Startup script logs
Log location
$INST_TOP/logs/appl/admin/log/
Logs written by adstrtal.sh, adstpall.sh and the individual control scripts
Same
adstrtal.sh
Control script
$ADMIN_SCRIPTS_HOME/adstrtal.sh apps/<apps_pwd>
Start all apps tier services; in 12.2 also prompts for the WebLogic admin password
Same script, no WebLogic password
adstpall.sh
Control script
$ADMIN_SCRIPTS_HOME/adstpall.sh apps/<apps_pwd>
Stop all apps tier services
Same
adadminsrvctl.sh
Control script
$ADMIN_SCRIPTS_HOME/adadminsrvctl.sh start | stop | status
Start or stop the WebLogic AdminServer
None
adnodemgrctl.sh
Control script
$ADMIN_SCRIPTS_HOME/adnodemgrctl.sh start | stop | status
Start or stop the WebLogic Node Manager
None
admanagedsrvctl.sh
Control script
$ADMIN_SCRIPTS_HOME/admanagedsrvctl.sh start oacore_server1
Start or stop one managed server (oacore_server1, forms_server1, oafm_server1 and others)
adoacorectl.sh, adformsctl.sh, adoafmctl.sh
adopmnctl.sh
Control script
$ADMIN_SCRIPTS_HOME/adopmnctl.sh start | stop | status
Start or stop OPMN for the web tier
Same script name
adapcctl.sh
Control script
$ADMIN_SCRIPTS_HOME/adapcctl.sh start | stop | status
Start or stop Oracle HTTP Server
Same
adcmctl.sh
Control script
$ADMIN_SCRIPTS_HOME/adcmctl.sh start | stop apps/<apps_pwd>
Start or stop the concurrent managers (ICM)
Same
adalnctl.sh
Control script
$ADMIN_SCRIPTS_HOME/adalnctl.sh start | stop
Applications TNS listener (APPS_<SID>) used for FNDFS report and log viewing
Same
jtffmctl.sh
Control script
$ADMIN_SCRIPTS_HOME/jtffmctl.sh start | stop
Fulfillment Server
Same
adautocfg.sh (apps tier)
Control script
$ADMIN_SCRIPTS_HOME/adautocfg.sh
Run AutoConfig on the run file system apps tier
Same
addbctl.sh
Control script
$ORACLE_HOME/appsutil/scripts/<CONTEXT_NAME>/addbctl.sh start | stop [immediate]
Start or stop the database on the DB tier
Same
addlnctl.sh
Control script
$ORACLE_HOME/appsutil/scripts/<CONTEXT_NAME>/addlnctl.sh start | stop <SID>
Start or stop the database TNS listener
Same
adautocfg.sh (DB tier)
Control script
$ORACLE_HOME/appsutil/scripts/<CONTEXT_NAME>/adautocfg.sh
Run AutoConfig on the database tier
Same
adpreclone.pl
Control script
DB tier: perl adpreclone.pl dbTier (in the DB scripts directory); apps tier: perl adpreclone.pl appsTier (in $ADMIN_SCRIPTS_HOME)
Prepare a tier for Rapid Clone
Same commands

Scope: EBS 12.2 on Linux/UNIX with 12.1 equivalents. Exact base paths are chosen at install time and some names (for example the WebLogic domain directory and OHS instance names) differ by AD-TXK code level; echo the variable on your own system to confirm.

Runbook check for your 12.2 instance

Send us your node layout and AD-TXK level. We will return a start/stop and log-location runbook matched to your installation.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

Run versus patch file system

EBS 12.2 has two complete copies of the apps tier code, fs1 and fs2, plus a non-editioned fs_ne. At any time one copy is the run file system (users connect to it) and the other is the patch file system (adop applies patches to it). Cutover swaps them, so RUN_BASE can be fs1 today and fs2 tomorrow. Always source the environment with EBSapps.env run for normal administration and check $FILE_EDITION before editing anything. Files that must survive a cutover, such as concurrent request logs and output and adop logs, live on fs_ne under $NE_BASE. Customisations copied only to the run file system are lost at the next cutover unless they are registered with adop's custom synchronisation driver, which is the most common surprise for teams new to 12.2.

Finding a request's log by SQL

The concurrent manager records the exact path of each file, so you do not need to guess: SELECT request_id, phase_code, status_code, logfile_name, logfile_node_name, outfile_name, outfile_node_name FROM fnd_concurrent_requests WHERE request_id = 1234567. LOGFILE_NAME and OUTFILE_NAME are full paths, and the node columns tell you which apps node to log on to in a multi-node install. For a manager rather than a request, query FND_CONCURRENT_PROCESSES.LOGFILE_NAME for the manager process, or look for the ICM's <SID>_MMDD.mgr file in $APPLCSF/$APPLLOG. The workflow mailer runs under the Workflow Mailer Service manager, so its FNDCPGSC log appears in the same directory.

  • Request log: l<request_id>.req
  • Request output: o<request_id>.out
  • Manager log: FND_CONCURRENT_PROCESSES.LOGFILE_NAME

Start and stop order

Start the database tier first, then the apps tier; stop in reverse. On the DB node: addlnctl.sh start <SID> for the listener, then addbctl.sh start for the database. On each apps node: source EBSapps.env run and run adstrtal.sh, which in 12.2 starts Node Manager, the AdminServer (on the primary node), OPMN and OHS, the managed servers, the Applications listener and the concurrent managers, prompting for the APPS and WebLogic admin passwords. To stop, run adstpall.sh on every apps node, then addbctl.sh stop immediate and addlnctl.sh stop <SID> on the DB node. Use the individual scripts (admanagedsrvctl.sh, adcmctl.sh) only when you need to bounce one service, and check $INST_TOP/logs/appl/admin/log when a service does not come up.

Gotchas

Do not run AutoConfig on the patch file system outside an adop cycle, and do not edit context-driven configuration files by hand on either file system; change the context file through the supported tools and let AutoConfig regenerate. In a multi-node install the AdminServer runs only on the primary node, so adadminsrvctl.sh on other nodes does nothing useful. The WebLogic domain directory and OHS instance names have changed with AD-TXK code levels, so echo $EBS_DOMAIN_HOME rather than typing a path from an old note. Keep fs_ne clean: concurrent output and adop session logs accumulate there and a full fs_ne stops both concurrent processing and patching. Purge old requests with Purge Concurrent Request and/or Manager Data (FNDCPPUR).

Frequently Asked Questions

What is the file system layout in Oracle EBS 12.2?

Under the EBS base there are fs1 and fs2, two editions of the apps tier code (one run, one patch), and fs_ne for non-editioned files. Each of fs1 and fs2 contains EBSapps (APPL_TOP, COMMON_TOP, 10.1.2 home), FMW_Home (WebLogic and web tier) and inst (INST_TOP). The database tier has its own Oracle Home with appsutil.

Where is the concurrent request log file in EBS 12.2?

In $APPLCSF/$APPLLOG, named l<request_id>.req, with output in $APPLCSF/$APPLOUT as o<request_id>.out. In 12.2 APPLCSF normally points to the non-editioned file system so logs survive cutover. The definitive path is FND_CONCURRENT_REQUESTS.LOGFILE_NAME for that request, with LOGFILE_NODE_NAME telling you which node holds it.

Where is the workflow mailer log?

The Workflow Notification Mailer runs inside the Workflow Mailer Service (a service manager), and its log is FNDCPGSC<process_id>.txt in $APPLCSF/$APPLLOG. Find the current one with ls -lrt FNDCPGSC*.txt or from the service's process in FND_CONCURRENT_PROCESSES. Raise the mailer's log level in Workflow Manager when diagnosing delivery problems, and reset it afterwards.

How do I start the listener and database in EBS 12.2?

On the database node, as the database OS user, run $ORACLE_HOME/appsutil/scripts/<CONTEXT_NAME>/addlnctl.sh start <SID> for the TNS listener and addbctl.sh start for the database. Then start the apps tier with adstrtal.sh. The apps tier Applications listener (adalnctl.sh) is a separate listener for FNDFS and starts with adstrtal.sh.

If you want your DBAs to ask in plain English which requests failed overnight and see the matching log lines, we can set up a private assistant on your own EBS servers.

Get Oracle E-Business Suite alerts

Support and maintenance deadlines, release changes that affect Oracle E-Business Suite sites, and new free Oracle E-Business Suite tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for Oracle E-Business Suite: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to Oracle E-Business Suite? Start with the Oracle E-Business Suite guide and toolkit, or plan with Oracle EBS Roadmap Planner, Training Path Builder, ERP Certification Study Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

AI on your ERP

Integrations

Software