Oracle EBS BOM Explosion SQL Query Generator
A multilevel bill of material is a recursive structure, and Oracle EBS stores it as bill headers and component lines. This generator builds a hierarchical SQL query that walks the structure, plus a where-used and a check for empty bills.
Fill in
1. Multilevel explosion (current effectivity, primary BOM)
SELECT LEVEL AS bom_level,
LPAD(' ', 2 * (LEVEL - 1)) || msi_p.segment1 AS assembly,
msi_c.segment1 AS component,
msi_c.description,
bic.component_quantity,
bic.operation_seq_num,
bic.effectivity_date,
bic.disable_date
FROM bom_structures_b bom,
bom_components_b bic,
mtl_system_items_b msi_p,
mtl_system_items_b msi_c
WHERE bic.bill_sequence_id = bom.bill_sequence_id
AND msi_p.inventory_item_id = bom.assembly_item_id
AND msi_p.organization_id = bom.organization_id
AND msi_c.inventory_item_id = bic.component_item_id
AND msi_c.organization_id = bom.organization_id
AND bom.alternate_bom_designator IS NULL
AND bic.effectivity_date <= SYSDATE
AND (bic.disable_date IS NULL OR bic.disable_date > SYSDATE)
START WITH bom.organization_id = 207
AND bom.assembly_item_id = (SELECT inventory_item_id
FROM mtl_system_items_b
WHERE segment1 = 'AS-1000'
AND organization_id = 207)
CONNECT BY NOCYCLE PRIOR bic.component_item_id = bom.assembly_item_id
AND bom.organization_id = PRIOR bom.organization_id
AND LEVEL <= 10
ORDER SIBLINGS BY bic.operation_seq_num;2. Single-level where-used
SELECT msi_p.segment1 AS parent_assembly,
msi_p.description,
bic.component_quantity,
bic.effectivity_date,
bic.disable_date
FROM bom_components_b bic,
bom_structures_b bom,
mtl_system_items_b msi_p,
mtl_system_items_b msi_c
WHERE bic.bill_sequence_id = bom.bill_sequence_id
AND msi_p.inventory_item_id = bom.assembly_item_id
AND msi_p.organization_id = bom.organization_id
AND msi_c.inventory_item_id = bic.component_item_id
AND msi_c.organization_id = bom.organization_id
AND bom.organization_id = 207
AND bom.alternate_bom_designator IS NULL
AND msi_c.segment1 = 'RM-2040'
AND (bic.disable_date IS NULL OR bic.disable_date > SYSDATE)
ORDER BY msi_p.segment1;3. Bills with no components
SELECT msi.segment1 AS assembly, msi.description
FROM bom_structures_b bom,
mtl_system_items_b msi
WHERE msi.inventory_item_id = bom.assembly_item_id
AND msi.organization_id = bom.organization_id
AND bom.organization_id = 207
AND bom.alternate_bom_designator IS NULL
AND NOT EXISTS (SELECT 1
FROM bom_components_b bic
WHERE bic.bill_sequence_id = bom.bill_sequence_id)
ORDER BY msi.segment1;Written for Release 12 table names. In 11i the tables are BOM_BILL_OF_MATERIALS and BOM_INVENTORY_COMPONENTS. This simple hierarchy ignores phantom handling, planning percent, option classes and quantity roll-up, so for costing or MRP use the supported BOM explosion programs or the BOM explosion APIs. Verify against your release.
Ask BOM questions in plain English
Optional: a walkthrough of read-only natural-language BOM and where-used queries.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter the organization id, the top assembly item number and, for where-used, a component item number. Copy the SQL into your tool. The explosion block indents each level, orders siblings by operation sequence and limits depth so a loop in the data cannot run away. The bills with no components block is useful before a go-live data audit.
How the BOM tables join
BOM_STRUCTURES_B holds one header per assembly, organization and alternate designator, with a BILL_SEQUENCE_ID. BOM_COMPONENTS_B holds the component lines for that sequence. To recurse, the component item of one line must be the assembly item of another header, which is exactly what the CONNECT BY clause expresses. A NULL alternate designator means the primary bill.
- Header key: BILL_SEQUENCE_ID
- Recursion: PRIOR component_item_id = assembly_item_id
- Effectivity: EFFECTIVITY_DATE and DISABLE_DATE
- Primary bill: ALTERNATE_BOM_DESIGNATOR IS NULL
What this query does not do
The quantities shown are per parent and are not rolled up to the top assembly. Phantom assemblies, component yield, planning percent, option class items and revision-based effectivity are not applied. For extended quantity or cost, either multiply quantities down the tree in a wrapper query or use the Oracle explosion routines that populate the explosion tables.
Common mistakes
The usual errors are leaving out the organization filter, missing the alternate designator filter and so mixing alternates with the primary, and ignoring disable dates, which returns obsolete components. Also remember that a circular reference in bad data causes errors without NOCYCLE.
Frequently Asked Questions
What tables hold the bill of material in Oracle EBS R12?
BOM_STRUCTURES_B for bill headers and BOM_COMPONENTS_B for component lines, linked by BILL_SEQUENCE_ID. In 11i the equivalent tables are BOM_BILL_OF_MATERIALS and BOM_INVENTORY_COMPONENTS.
How do I get an extended quantity down the tree?
Use SYS_CONNECT_BY_PATH for the chain, or a recursive subquery factoring clause that multiplies component quantity by the parent quantity at each level. The simple hierarchical form here shows per-parent quantity only.
How do I include alternate BOMs?
Remove the alternate designator IS NULL filter, or set it equal to the designator you want. Be careful, because alternates are separate headers and will otherwise double count components.
Should I use this for MRP or costing?
No. MRP and Cost Management have their own explosion logic including phantoms and planning percentages. Use this query for analysis, data audits and ad hoc questions, and the supported programs for transactional results.
If you need BOM explosions, where-used and cost roll-ups answered in plain language from your live EBS data, we can build that read-only on your own infrastructure.
Related Tools
Oracle EBS Inventory Tables Reference
Searchable lookup of the core Oracle EBS Inventory and Cost Management tables with purpose and key columns, for report writers and technical consultants.
OracleOracle EBS WIP Tables Reference
Lookup of Oracle EBS Work in Process tables with purpose and key columns, covering discrete jobs, operations, requirements, resources and interfaces.
Developer ToolsOracle EBS Onhand Quantity SQL Generator
Fill in organization, item pattern and subinventory to get ready-to-run SQL for onhand by lot, onhand versus reservations, and recent transaction history.
OracleOracle EBS Discrete Manufacturing Go-Live Checklist
A grouped go-live checklist for Oracle Inventory, BOM, WIP and Cost Management covering setup, data, testing and cutover for discrete manufacturers.
More Developer Tools tools
See all- Oracle EBS Pending Transactions SQL Generator for Period Close
- Oracle EBS Public PL/SQL API Reference (OM, INV, PO, AP, AR, TCA, FND)
- Oracle EBS Forms Personalization Tables and Trigger Events Reference
- Oracle EBS Forms FRM Error Codes Reference (FRM-92101, FRM-40735)
- Oracle EBS XML Publisher RTF Template Syntax Reference
- Oracle EBS OE_ORDER_PUB.PROCESS_ORDER Script Generator
- Oracle EBS FND_REQUEST.SUBMIT_REQUEST Code Generator
- Oracle EBS PL/SQL Concurrent Program Generator (Package plus FND_PROGRAM Registration)
- Oracle EBS Concurrent Program Parameters and Responsibility SQL Generator
New to Oracle E-Business Suite? Start with the Oracle E-Business Suite guide and toolkit, or plan with Oracle EBS Roadmap Planner, Training Path Builder, ERP Certification Study Planner.
Keep exploring
Free tools
- Oracle EBS On-Hand Reconciliation SQL GeneratorGenerate a SQL query that compares on-hand quantity to the net of material transactions for an organization, to spot unexplained differences.
- Oracle EBS Cost Management Tables ReferenceA lookup of the Oracle EBS tables behind item cost, WIP jobs, BOM, routing and inventory transactions used in manufacturing costing.
- JD Edwards F3002 Multi-Level BOM Explosion SQL GeneratorGenerate an Oracle recursive SQL query that explodes a JD Edwards bill of material from F3002 level by level, plus a check of a work order parts list in F3111.
ERP fixes and how-tos
- How to Create an Item in Oracle EBSCreate an inventory item in Oracle EBS: Master Items form, master organization, templates, attributes, organization assignment, categories and common errors.
- Oracle EBS Outside Processing and Production SchedulingSet up outside processing in Oracle EBS WIP and Purchasing: OSP items, resources, departments, routing and requisitions, plus how discrete job scheduling works.
- Organization Structure in Oracle EBS: Ledger, Legal Entity, Operating Unit, Inventory OrgHow Oracle EBS organizes ledgers, legal entities, operating units and inventory organizations, how security fits, and how to mask data in non-production.
Runs with your ERP
- Esker Order Management and Oracle E-Business SuiteHow Esker captures customer POs from email, fax and PDF and creates sales orders in Oracle EBS: integration, data flows, setup, pitfalls and a private AI layer.
- Cloud Inventory (DSI) with Oracle E-Business Suite: Mobile Barcode InventoryCloud Inventory, formerly DSI, adds offline mobile barcode inventory to Oracle E-Business Suite and JD Edwards. Data flows, setup steps, pitfalls and AI notes.
- BarTender and Oracle E-Business Suite: Label Printing from OracleHow BarTender prints labels from Oracle EBS using Oracle XML print requests and Integration Builder: methods, data flows, setup steps, pitfalls and AI help.
AI on your ERP
- AI for Oracle EBS in Industrial Manufacturing: WIP, MRP, and BOM Questions Answered DirectlyAI for Oracle E-Business Suite in industrial manufacturing: WIP jobs, BOMs, MRP, inventory and purchasing answered in plain English, private and read-only.
- AI Services for Oracle E-Business Suite: What to Buy and What to AvoidAI services for Oracle E-Business Suite: what a good engagement covers, realistic phases and costs, questions to ask partners, and when not to invest.
Integrations
- How to use ChatGPT with Oracle E-Business SuiteUsing ChatGPT with Oracle E-Business Suite: export vs live access, custom GPT actions over ISG REST, enterprise data controls and when to keep data on-prem.
- How to connect Claude to Oracle E-Business SuiteConnect Claude to Oracle E-Business Suite via MCP, the Anthropic API, AWS Bedrock or Vertex, and know when an on-prem open-weight model is the better fit.