PPAP 18 Elements Supplier Submission Reference

PPAP, the Production Part Approval Process, is how automotive customers confirm a supplier can make a part to specification at the quoted rate. This reference lists the 18 elements with what each proves and what a reviewer should ask.

Download:
No.PPAP elementWhat it provesTypical supplier evidenceReviewer question
1
Design records
The supplier works to the current released drawing or model
Customer drawing, ballooned drawing, CAD data, BOM
Is the revision level the same as on the PO?
2
Authorized engineering change documents
Changes not yet on the drawing are authorized
Engineering change notice, deviation approval
Is every change since the last approval listed?
3
Customer engineering approval
The customer engineering function accepted the part where required
Trial approval, engineering sign-off
Was approval required and is it attached?
4
Design FMEA
Design risks were assessed by the design owner
DFMEA document, only if supplier is design responsible
Do high-risk items link to special characteristics?
5
Process flow diagram
The full process is understood from receiving to shipping
Flow diagram showing inspection and rework steps
Does it match the PFMEA and control plan step by step?
6
Process FMEA
Process failure risks were assessed and ranked
PFMEA with severity, occurrence, detection and actions
Are high-severity items covered by prevention or detection controls?
7
Control plan
Controls exist for every important characteristic
Control plan with method, sample size, frequency, reaction plan
Does every special characteristic have a gauge and a reaction plan?
8
Measurement system analysis studies
Gauges are capable of measuring the characteristics
Gauge R and R, bias, linearity, stability, attribute studies
Are gauge studies done for each special characteristic gauge?
9
Dimensional results
Sample parts meet every dimension on the drawing
Layout report with actual measurements from production parts
Is every ballooned dimension measured, with results from several cavities or tools?
10
Records of material and performance test results
Materials and functional requirements are met
Material certificates, lab reports, performance test data
Are the tests those required by the drawing and customer specification?
11
Initial process studies
The process is stable and capable on key characteristics
Control charts, Cpk or Ppk results for special characteristics
Do results meet the customer capability requirement and is the data from a significant production run?
12
Qualified laboratory documentation
Testing was done by an acceptable lab
Lab scope of accreditation, for example ISO/IEC 17025
Does the lab scope cover the tests performed?
13
Appearance approval report
Colour, grain and surface meet the appearance requirement
Signed appearance approval report with master sample reference
Applies only to parts with appearance requirements. Is it signed?
14
Sample production parts
Parts from the production process were provided
Sample parts as requested, labelled with part and date
Were parts made with production tooling and process?
15
Master sample
A reference sample is retained for comparison
Signed and dated retained sample
Is it stored and who has access?
16
Checking aids
Fixtures and gauges used for inspection are verified
Gauge drawing, calibration records, dimensional report on the aid
Is the aid calibrated and its revision tied to the part revision?
17
Customer-specific requirements
Requirements particular to the customer are met
Records listed in customer-specific requirements documents
Did the supplier check the customer portal and not only the drawing?
18
Part submission warrant (PSW)
The supplier declares that all requirements are met
Signed PSW with reason for submission, level and weights
Does the PSW match the dimensional and material results and is it signed by an authorized person?

This is a summary of the structure of the 18 elements, not the AIAG manual. Submission levels 1 to 5 decide which elements are submitted and which are only retained. Always use the current AIAG PPAP manual and your customer-specific requirements.

PPAP status from your ERP

Optional: we can show how part approval status could be read from your ERP and quality records.

Optional. The tool and every export work without this. No spam.

How to use this reference

Search for an element such as control plan or gauge to see the evidence normally expected. Use the reviewer question column as a prompt when you open a supplier submission, and export the list to Excel as a review sheet with a pass or fail column of your own. Supplier quality engineers can send the list to a new supplier so both sides share the same expectation before the submission is due.

  • Filter by keyword such as FMEA, gauge or material
  • Use the reviewer question column during review
  • Export to Excel to build a review record
  • Confirm the submission level on the PO or SQA letter

Submission levels

Level 1 submits the warrant only. Level 2 submits the warrant with product samples and limited supporting data. Level 3 submits the warrant with samples and complete supporting data, and is the default unless the customer says otherwise. Level 4 submits the warrant and other items defined by the customer. Level 5 keeps complete data at the supplier's site for review there. Whatever the level, the supplier must keep all 18 elements, or note which do not apply.

How to read a submission

Start with the PSW and check the part number, revision, reason for submission and signature. Then confirm the dimensional results cover every ballooned dimension, the control plan covers every special characteristic, and the PFMEA and flow diagram agree with each other. Finally check capability data on special characteristics against the customer target, commonly a Cpk of 1.33 for initial studies and 1.67 for safety or significant characteristics, if the customer sets those numbers.

Common mistakes

Submissions are often rejected for revision mismatch, dimensional results from a single cavity, missing gauge studies, a PFMEA that never changed from the quote stage, or a control plan that lists no reaction plan. Another frequent miss is submitting data from a short run that does not represent normal production variation. Ask for the run size and dates before you accept capability results.

  • Check revision on every document
  • Ask for all cavities or tools
  • Look for a live PFMEA, not a template copy
  • Check run size behind capability data

Frequently Asked Questions

Is PPAP only for automotive?

PPAP comes from the automotive industry through AIAG, but similar approvals are used elsewhere. Aerospace uses first article inspection under AS9102 for a comparable purpose. Many industrial buyers borrow PPAP elements for supplier approval of new parts.

What does PSW stand for?

PSW means part submission warrant. It is the cover document where the supplier declares that the part meets all customer requirements, lists the submission level and reason for submission, and signs. The warrant on its own proves nothing without the supporting data.

Which PPAP level should I choose?

Level 3 is the default for most automotive customers. Use a lower level for low-risk catalog parts and a higher level for new suppliers, safety parts or after a quality escape. The customer normally dictates the level in the supplier manual or purchase order.

When is a new PPAP required?

Typical triggers are a new part, a design change, a new tool or process, a move to a new site, a change of sub-supplier, or tooling inactive for a long period. The customer-specific requirements list the exact triggers, so confirm them in your supplier manual.