Industry TemplatesFree templatePDF, Excel, Word exportPackaging and Printing

Press Check Sign-Off Sheet Template

A press check is the moment where the whole run is either right or wasted. This sheet records the measurements, the decision and the sign-off so you can prove later that the sheet was checked against the approved reference.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

Press Check Sign-Off Sheet Template

Press Check Sign-Off

Plant: Harbor Packaging Co. Plant 2 Job: J-24-1187 Press: Flexo Press 4 (8 colour) Operator: R. Alvarez Date: 2026-10-20 Substrate: SBS 18 pt coated board Colour reference: Signed contract proof, ref J-24-1187-P2 Max Delta E (brand colour): 3

Measured values

Channel / itemTargetMeasuredTolerancePass
Cyan density or L*a*b*
Magenta density or L*a*b*
Yellow density or L*a*b*
Black density or L*a*b*
Spot colour 1
Registration (mm)
Varnish / coating coverage
Cut, crease or die position

Decision

Approved with notes

Notes

Pantone 186 C trending light, ink viscosity corrected. Registration within tolerance after second check.

Approvals

Press operator / Date
Shift supervisor / Date
Quality inspector / Date
Customer representative (if attending) / Date

Fill target and tolerance columns from your customer specification or your own press standard. Tolerances differ by print process and customer, so none are preset here beyond what you type.

Capture press quality data in your ERP

Optional: a short review of how press check results could feed your ERP quality records.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the sheet

Enter the job, press and colour reference, then pull a sheet or length of web at running speed. Measure each channel against the target, and record the decision. Operators often add the adjustments they made, for example ink viscosity or anilox change, because that history explains drift later in the run. Export to PDF and attach to the job traveller.

Measuring against a reference

Colour acceptance is easiest when the reference is a signed contract proof or a numeric target such as L*a*b* values. Delta E is the colour difference between measured and target, and the maximum allowed value is a customer or press standard decision. Registration and cut position should be measured on the sheet, not judged by eye.

  • Record the instrument and measuring condition (for example M1) if you use a spectrophotometer
  • Check a sheet from the start, middle and end of makeready if the press has been adjusted
  • Never approve against a screen image alone

Common mistakes

Teams often sign off a good sheet and then fail to re-check after a roll change, ink top-up or press stop. Others record only pass or fail, which hides the slow drift that causes a rejected pallet three hours later. Write the actual value so trends are visible.

Frequently Asked Questions

What is an OK-to-run sheet?

It is the sheet or sample that an authorised person signs to confirm that the print matches the approved reference. The press then runs the job and compares samples against that signed sheet during the run.

What Delta E is acceptable?

There is no universal value. It depends on the customer, the colour and the print process. Many brand owners define a tighter limit for brand colours and a looser one for tints. Use the number in your customer specification.

How often should samples be pulled during a run?

Follow the control plan for the job. A common practice is at start, after every roll or pallet change, after any stop and at regular time intervals. The key point is that the frequency is written down and followed.

Can this sheet be used for digital presses?

Yes. Replace the density rows with the device's colour check values and add the ICC profile or colour setup name in the notes. The approval logic of reference, measurement, decision and signature is unchanged.

If press check data sits on paper, we can help pipe measured values into your ERP or MES quality record so each lot carries its colour history.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP