Paper Size Chart: ISO A, B, C Series, Press Sheets and US Sizes
Print jobs mix ISO and US paper sizes every day, especially in export packaging inserts, manuals and labels. This chart lists trimmed sizes in millimetres and inches, plus RA and SRA press sheets used for bleed.
| Size | Standard | Millimetres (W x H) | Inches (W x H) | Common use |
|---|---|---|---|---|
A0 | ISO 216 | 841 x 1189 | 33.11 x 46.81 | Technical drawings, posters |
A1 | ISO 216 | 594 x 841 | 23.39 x 33.11 | Posters, flip charts |
A2 | ISO 216 | 420 x 594 | 16.54 x 23.39 | Posters, drawings |
A3 | ISO 216 | 297 x 420 | 11.69 x 16.54 | Drawings, large flyers |
A4 | ISO 216 | 210 x 297 | 8.27 x 11.69 | Letters, documents, brochures |
A5 | ISO 216 | 148 x 210 | 5.83 x 8.27 | Booklets, notepads |
A6 | ISO 216 | 105 x 148 | 4.13 x 5.83 | Postcards, small leaflets |
A7 | ISO 216 | 74 x 105 | 2.91 x 4.13 | Small cards, labels |
B0 | ISO 216 | 1000 x 1414 | 39.37 x 55.67 | Large posters |
B1 | ISO 216 | 707 x 1000 | 27.83 x 39.37 | Posters |
B2 | ISO 216 | 500 x 707 | 19.69 x 27.83 | Posters, wall charts |
B3 | ISO 216 | 353 x 500 | 13.90 x 19.69 | Posters |
B4 | ISO 216 | 250 x 353 | 9.84 x 13.90 | Large envelopes, folders |
B5 | ISO 216 | 176 x 250 | 6.93 x 9.84 | Books, notebooks |
B6 | ISO 216 | 125 x 176 | 4.92 x 6.93 | Books, small notebooks |
C4 envelope | ISO 269 | 229 x 324 | 9.02 x 12.76 | Holds A4 flat |
C5 envelope | ISO 269 | 162 x 229 | 6.38 x 9.02 | Holds A5 flat or A4 folded twice |
C6 envelope | ISO 269 | 114 x 162 | 4.49 x 6.38 | Holds A6 flat |
DL envelope | ISO 269 | 110 x 220 | 4.33 x 8.66 | Holds A4 folded in thirds |
RA3 | ISO 217 | 305 x 430 | 12.01 x 16.93 | Raw sheet, trims to A3 |
RA4 | ISO 217 | 215 x 305 | 8.46 x 12.01 | Raw sheet, trims to A4 |
SRA3 | ISO 217 | 320 x 450 | 12.60 x 17.72 | Digital press sheet with bleed for A3 |
SRA4 | ISO 217 | 225 x 320 | 8.86 x 12.60 | Press sheet with bleed for A4 |
Letter | US | 215.9 x 279.4 | 8.5 x 11 | Standard US office paper |
Legal | US | 215.9 x 355.6 | 8.5 x 14 | Legal documents |
Tabloid / Ledger | US | 279.4 x 431.8 | 11 x 17 | Drawings, newsletters |
Executive | US | 184.2 x 266.7 | 7.25 x 10.5 | Stationery |
Statement / Half Letter | US | 139.7 x 215.9 | 5.5 x 8.5 | Small forms, booklets |
Trimmed sizes. Inch values for ISO sizes are rounded to two decimals. Press sheet sizes (RA, SRA) are larger than the finished size to allow for trim, bleed and gripper margin.
Print spec data in your ERP
Optional review of how size, sheet and unit data are stored for print jobs.
Optional. The tool and every export work without this. No spam.
How to use the chart
Search by the size name or by dimensions. For a quote, find the finished size, then the press sheet that gives bleed and gripper margin, for example A3 jobs usually print on SRA3 digital sheets. Export the table to Excel to share with customers who work in the other unit system or to attach to a print specification.
- A series: each size is half the one before
- B series sits between A sizes
- C series is for envelopes
- RA and SRA are untrimmed press sheets
How ISO sizes work
ISO 216 A sizes keep an aspect ratio of 1 to the square root of 2, so cutting a sheet in half across its long side gives the next size down with the same proportions. A0 has an area of one square metre. That makes scaling artwork between sizes predictable and gives clean paper yield when a layout is imposed on a larger sheet.
Worked example
A leaflet of A5 finished size can be imposed 4-up on an SRA3 sheet only if bleed and gripper margin fit. SRA3 is 320 x 450 mm and four A5 trims need 296 x 420 mm, leaving 24 mm and 30 mm for marks, bleed and gripper. Use this check before quoting a digital run.
Common mistakes
Quoting US Letter and A4 as interchangeable on a tight imposition. Forgetting bleed, which needs the press sheet to be larger than the trim. Entering inches into a mm field in the estimating system. Store the unit of measure with every paper size in your ERP or print MIS.
Frequently Asked Questions
What is the difference between A4 and Letter?
A4 is 210 x 297 mm and US Letter is 215.9 x 279.4 mm. Letter is slightly wider and shorter. Documents designed for one may need rescaling or margin checks when printed on the other.
What size is SRA3?
SRA3 is 320 x 450 mm. It is slightly larger than A3 so that bleed, crop marks and gripper margins fit when printed on a digital or offset press and then trimmed to A3.
How do I convert mm to inches?
Divide millimetres by 25.4. For example 297 mm divided by 25.4 is 11.69 inches. Round to two decimals for estimating and keep millimetres as the master unit where possible.
What is the DL envelope used for?
DL is 110 x 220 mm and fits an A4 sheet folded in thirds. It is a common mailing envelope for invoices and statements in countries that use ISO sizes.
Netray can help you map print specifications to ERP item and routing data so size, sheet and imposition information is not retyped.
Related Tools
Paper and Linerboard Basis Weight Conversion (lb per MSF to GSM)
Look up the gsm equivalent of common linerboard and medium weights quoted in lb per MSF.
Industry TemplatesCorrugated Flute Profile Reference (A, B, C, E, F)
Look up nominal flute height, flutes per foot and take-up factor for common corrugated flutes.
Developer ToolsSSCC-18 Pallet Shipping Label ZPL Generator
Fill in ship-to, PO, GTIN, quantity and SSCC to get ZPL for a 4 x 6 inch GS1-128 pallet label.
More Industry Templates tools
See all- Carton Dimensions Specification Template
- Packaging Specification Sheet Template
- Packaging Artwork Proof Approval Form Template
- Press Check Sign-Off Sheet Template
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
- Sheet Metal Job Traveler Template
Keep exploring
Free tools
- Paper Roll Length, Weight and Run Time CalculatorEstimate how many metres, square metres and kilograms are on a roll and how long it runs on your press.
- Print Press Run Log WorksheetAn editable run log that computes total waste, waste percent and average run speed for every job on the press.
- Print and Packaging Plant ERP and MIS Readiness AssessmentScore how well your current systems support estimating, job costing, material tracking and traceability in a print or packaging plant.
ERP fixes and how-tos
- SAP QM Sample Label Printing: How to Print Physical Sample LabelsHow SAP QM sample label printing works: physical samples on an inspection lot, the QPR print transactions, the form behind the label and printer checks.
- Infor LN Reports Stuck in the Print Queue: Device and Spooler FixInfor LN reports sit in the print queue and never print when a device goes offline. Check the device definition, the spooler, and fix the queue fast.
- How to replace paper travelers with a digital travelerHow to replace paper travelers with a digital traveler: ERP routing as source, step data capture, signoffs, revision control, offline use and audit records.
Runs with your ERP
- BarTender and Oracle E-Business Suite: Label Printing from OracleHow BarTender prints labels from Oracle EBS using Oracle XML print requests and Integration Builder: methods, data flows, setup steps, pitfalls and AI help.
- Loftware Label Printing with Oracle Fusion Cloud SCMHow the Loftware adapter for Oracle Integration turns Oracle SCM Cloud business events into label print jobs and returns status: flows, setup and pitfalls.
- BarTender with Infor SyteLine: how label printing is wired upHow SyteLine sites print labels with BarTender: SQL table triggers on-prem, and Mongoose or IDO patterns in the cloud. Setup steps, pitfalls and alternatives.
Guides
- AI for Estimating Label and Packaging Converting JobsHow AI can read customer inquiries and artwork specs, find similar past label and carton jobs, and draft an estimate for review, plus its limits.
- Scheduling Press Capacity in a Label and Packaging Converting PlantHow label and packaging plants schedule presses and finishing: changeover-aware sequencing, material availability, due dates and finite capacity pitfalls.
- Job Costing and Margin by Job for Label and Packaging ConvertersHow converters compare estimate to actual by job: material and waste, press hours, outside services, overs and unders, and finding the jobs that lose money.