Corrugated Flute Types Chart: A, B, C, E and F Flute Reference
Flute choice decides stacking strength, print quality and board cost. This reference lists the common corrugated flutes with nominal height, flutes per foot and take-up factor so you can compare them quickly.
| Flute | Construction | Flutes per foot (nominal) | Flute height (in) | Flute height (mm) | Take-up factor (nominal) | Typical use |
|---|---|---|---|---|---|---|
A | Single wall | 33 | 0.187 | 4.7 | 1.54 | Cushioning, fragile goods, high stacking |
C | Single wall | 39 | 0.142 | 3.6 | 1.43 | General shipping cartons, most common in North America |
B | Single wall | 47 | 0.097 | 2.5 | 1.32 | Canned goods, die cut displays, good print surface |
E | Single wall | 90 | 0.062 | 1.6 | 1.27 | Retail folding cartons, mailers, fine print |
F | Single wall | 128 | 0.045 | 1.1 | 1.25 | Small retail cartons, high quality graphics |
BC | Double wall | 47 + 39 | about 0.239 | about 6.1 | Per flute | Heavy machinery, export cartons, high compression |
EB | Double wall | 90 + 47 | about 0.159 | about 4.1 | Per flute | Premium retail shipper with good print |
AA / AC | Double wall | 33 + 33 / 33 + 39 | about 0.374 / 0.329 | about 9.5 / 8.4 | Per flute | Very heavy goods (less common) |
BAC | Triple wall | 47 + 33 + 39 | about 0.426 | about 10.8 | Per flute | Bulk bins, pallet-size containers |
Values are nominal industry figures. Actual flute height, flutes per foot and take-up vary by corrugator, rolls and medium, so confirm with your board supplier. Double and triple wall heights are the sum of the individual flute heights and ignore liner thickness.
Structured board specs in your ERP
Optional review of how flute, liner and medium attributes are stored in your item master.
Optional. The tool and every export work without this. No spam.
How to use the flute chart
Search by flute letter or by use. Start from the job: if the carton is a retail shelf pack with fine graphics, E or F flute is typical. If it is a general shipper that must stack in a warehouse, C flute is the common default in North America and B flute is common elsewhere. Heavy or export loads move to double wall such as BC. Export the table to Excel to attach it to a packaging specification or a supplier quote request.
- Finer flutes print better
- Taller flutes usually stack and cushion better
- Double wall adds compression and puncture strength
- Always confirm values with your board mill
What take-up factor means
Take-up factor is the ratio of medium length to liner length. A flute with a take-up of 1.43 needs about 1.43 metres of medium paper for every metre of finished board. That ratio drives medium consumption, board cost and board weight, so it matters when you cost a new spec or compare two flutes with the same liners.
Reading the numbers
Fewer, taller flutes (A) give more cushioning but crush more easily on the corrugator and in printing. More, shorter flutes (E, F) give a flatter surface for flexo and litho lamination. Double wall boards combine two flutes, so the total thickness is roughly the sum of both flute heights plus three liners. Use this table with a box compression estimate, not instead of one.
Common mistakes
Specifying a flute by name only and ignoring liner grade, then expecting compression performance. Mixing metric and inch values in the same costing sheet. Assuming every mill uses the same take-up. Ask for the supplier's board spec sheet and store flute, liner and medium weights as separate attributes in your ERP item master.
Frequently Asked Questions
Which flute is most common?
In North America C flute is the most common general shipping carton flute. B flute is common for printed and die cut packs and E flute for retail cartons. Regions differ, so check what your corrugator actually runs before standardising a spec.
Is a taller flute always stronger?
No. Taller flutes usually give better vertical stacking and cushioning, but the result also depends on liner and medium weight, moisture and box design. A well made C flute box can outperform a poorly made A flute box.
What is the difference between BC and EB double wall?
BC combines B and C flutes for heavy duty strength. EB combines E and B flutes to give a smoother printable surface with extra strength, often used for premium retail shipping cartons.
Are these values exact?
They are nominal industry values. Each corrugator and roll set produces slightly different flute height and take-up. Treat the table as a planning reference and confirm with your supplier's board specification.
Netray can help store board specifications as structured attributes in your ERP so costing and purchasing use the same flute and liner data.
Related Tools
Paper and Linerboard Basis Weight Conversion (lb per MSF to GSM)
Look up the gsm equivalent of common linerboard and medium weights quoted in lb per MSF.
Quality & InspectionPackaging Line Clearance and Label Reconciliation Checklist
Confirm the line is clear of old materials and that printed labels reconcile before and after a packaging run.
Discrete ManufacturingCorrugated RSC Blank Size and Board Yield Calculator
Converts inside box dimensions into the RSC blank size, then shows blanks per sheet, board yield and board cost per box.
More Industry Templates tools
See all- Carton Dimensions Specification Template
- Packaging Specification Sheet Template
- Packaging Artwork Proof Approval Form Template
- Press Check Sign-Off Sheet Template
- ISO and US Paper Size Reference for Print Jobs
- Distributor Free Freight Policy Template
- Job Shop Quote Cover Letter Template
- Monthly Operations Review Meeting Pack Template
- OEE Improvement A3 Charter Template
Keep exploring
Free tools
- Corrugated Board Sheet Usage and Trim Waste WorksheetAn editable order list that computes how many blanks fit on each board sheet, trim waste percent and board cost per box.
- Corrugated RSC Blank Size and Board Yield CalculatorConverts inside box dimensions into the RSC blank size, then shows blanks per sheet, board yield and board cost per box.
- Corrugated Box Compression Strength (BCT) CalculatorEstimate box compression test (BCT) strength from ECT, board caliper and box footprint with the McKee formula, then convert it to a safe stacking height.
ERP fixes and how-tos
- How to Create a Status Profile in SAP QM (BS02)Create a user status profile in SAP QM with BS02 and assign it to quality notifications, tasks and inspection lots, with status numbers and business transaction control.
- Cost profile in Oracle Fusion: cost organization, cost book and manufacturing costingHow cost organizations, cost books and cost profiles fit together in Oracle Fusion Cost Management, and how to set up manufacturing costing step by step.
- SQL query to find profile option values by level in Oracle EBSSQL to list Oracle EBS profile option values at site, application, responsibility and user level using FND_PROFILE_OPTIONS and FND_PROFILE_OPTION_VALUES, with level IDs.
Guides
- AI for Estimating Label and Packaging Converting JobsHow AI can read customer inquiries and artwork specs, find similar past label and carton jobs, and draft an estimate for review, plus its limits.
- Rubber Extrusion Quoting and Scrap CostingQuote rubber extrusions per foot: compound weight per foot, line speed, start-up scrap, die cost, cure method, cutting and splicing, with scrap costed correctly.
- ERP for Packaging Converters: What to Look ForWhat a packaging or label converter needs from ERP: roll and sheet inventory, job-based costing, lot traceability, MIS integration and realistic options.
AI on your ERP
- AI for ERP in Packaging and Printing: Estimating, Waste and Job TicketsPrivate AI on your ERP for converters and printers: job estimating, substrate and ink usage, make-ready waste, die tooling, proofs and food-contact records.
- AI on Infor SyteLine for Packaging ManufacturersAI on Infor SyteLine for packaging makers: substrate and ink costing, job repeats, die and plate tracking, food-contact records, and short-run scheduling.