Industry TemplatesFree referencePDF, Excel, Word exportPackaging and Printing

Linerboard lb per 1000 sq ft to GSM Conversion Chart

North American mills quote linerboard and medium in pounds per 1000 square feet, while much of the rest of the world uses grams per square metre. This chart converts the common corrugated weights in both directions.

Download:
Weight (lb per 1000 sq ft)Approx. GSM (g/m2)Common use
23
112
Light medium (lightweight board)
26
127
Standard corrugating medium
30
146
Heavier medium, light liner
33
161
Lightweight liner, inside liner
35
171
Light liner
38
186
Standard liner, 200# board
40
195
Liner
42
205
Standard liner, 275# board
56
273
Heavy liner
69
337
Heavy duty kraft liner
90
439
Very heavy liner or chipboard
126
615
Specialty heavy sheet

Conversion factor: 1 lb per 1000 sq ft = 4.8824 g/m2. Rounded to whole gsm. Mill grade names and tolerances differ, so use the mill's own certificate for ordering.

Unit-safe paper item master

Optional review of how paper weight and units are held across purchasing and costing.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the chart

Find your weight in lb per MSF and read the gsm value across, or search by use such as medium or kraft liner. To convert any weight not listed, multiply lb per 1000 sq ft by 4.8824 to get gsm, or divide gsm by 4.8824 to get lb per MSF. Export the table to Excel and keep it with your supplier specs so multi-country buyers speak the same units.

  • gsm = lb per MSF x 4.8824
  • lb per MSF = gsm / 4.8824
  • Round to whole gsm for specs
  • Keep both units in the item master

Why the basis weight matters

Liner and medium weight drive board price, board weight and compression strength. A 42 lb liner has about 21 percent more fibre than a 35 lb liner per square foot, which typically means higher burst and crush performance and higher cost per square metre. When comparing quotes from different regions, convert everything to one unit before comparing price per tonne or price per square metre.

Worked example

A 275# test single wall box is often built from 42 lb liners and a 26 lb medium. Converted, that is about 205 gsm liners and 127 gsm medium. With C flute take-up of about 1.43, the medium contributes roughly 127 x 1.43 = 182 gsm of paper in the board, so total board weight is about 205 + 205 + 182 = 592 gsm.

Common mistakes

Mixing lb per MSF with lb per ream or with tonnes per kilometre. Forgetting that the medium is longer than the liner because of take-up. Comparing board quotes without converting units. Add both unit fields to your ERP item master so purchasing and costing never convert by hand.

Frequently Asked Questions

How do I convert lb per 1000 sq ft to gsm?

Multiply the weight in lb per 1000 square feet by 4.8824 to get grams per square metre. For example 42 lb per MSF times 4.8824 is about 205 gsm. Round to the nearest whole number for specifications.

Is MSF the same as lb per ream?

No. A ream basis weight depends on sheet size and sheet count, while MSF is pounds per 1000 square feet. Always check which basis a quote uses before converting.

What gsm is standard corrugating medium?

A 26 lb per MSF medium is about 127 gsm and is the common standard. Light mediums of 23 lb are around 112 gsm. Mills may offer other weights, so check the current grade list.

Do all mills round to the same gsm?

No. Mills nominate their own target weights and tolerances. A 42 lb liner may be sold as 200 or 205 gsm depending on the mill. Use the mill certificate, not the chart, for contract specs.

Netray can help you keep paper grade, weight and unit of measure aligned between purchasing, costing and quality in your ERP.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring