QAD Subscription vs Perpetual License TCO Calculator
Moving QAD to a subscription changes the shape of spend, not just the amount. This calculator lays a perpetual license with maintenance next to a subscription so a controller or CIO can see where the lines cross.
Your numbers
Users you would license in either model.
One-time price from your quote or last purchase.
Yearly support and maintenance as a percent of license value.
Servers, storage, backup, database licences and hosting you pay for yourself.
Fraction of a person spent keeping the platform running.
From the subscription quote. Illustrative default only.
Integration hosting, extra environments, sandbox add-ons.
Your results
Illustrative model only. Use figures from your own QAD quote and contract. Excludes implementation, upgrade projects, taxes and discounts.
Cumulative cost by horizon
Sweeps Time horizon from 1 to 10, holding your other inputs fixed.
ERP cost model review
Share your inputs and get an expert sanity check on the assumptions, including infrastructure and admin effort.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the user count and the two price points from your quotes. For the perpetual side, include what you really pay to run it: infrastructure, database licences and the share of an administrator who patches and monitors the system. For the subscription side, add costs the vendor does not bundle, such as extra non-production environments or integration hosting. Move the time horizon slider to see how the answer changes at three, five and ten years. The chart plots both cumulative totals against years so the crossover is visible.
- Use the same user count on both sides
- Take maintenance percent from your last renewal invoice
- Include admin time even if it is nobody's full-time job
- Test a discount case and a list-price case
The maths behind it
Perpetual total equals the up-front license plus yearly run cost multiplied by years. Yearly run cost is maintenance rate times license value, plus infrastructure, plus admin FTE times loaded cost. Subscription total equals users times monthly price times twelve, plus other yearly costs, times years. Break-even is the license purchase divided by the yearly gap between subscription and perpetual run cost. If the subscription is cheaper every year, the break-even shows zero because the lines never cross.
Reading the result
A short break-even, say under three years, favours subscription for a business that expects to change ERP or shrink. A long break-even favours owning if you plan to run the same release for a decade. Cost is only half the story: subscription typically bundles upgrades and hosting, while a perpetual estate keeps control of upgrade timing and data location, which matters for regulated or air-gapped sites. Treat the difference as one input beside risk, capability and exit terms.
Common mistakes
The most frequent error is comparing a subscription quote with license price alone and ignoring infrastructure and admin cost. The second is forgetting that maintenance usually rises with license additions. The third is ignoring one-time migration to the cloud edition, which belongs in a separate project budget. Also check whether the subscription price escalates yearly; if it does, raise the monthly price to the average over the horizon.
Frequently Asked Questions
Does this use real QAD prices?
No. Defaults are placeholders so the tool works on first load. QAD pricing varies by contract, volume and region, so replace every figure with those from your own quote or renewal invoice before relying on the result.
Why include infrastructure and admin time?
Because a perpetual license runs on hardware and people you pay for separately. Leaving them out understates the cost of owning and makes the subscription look dearer than it is, which is the most common bias in these comparisons.
What if the subscription price rises each year?
Estimate the average monthly price across the horizon and enter that figure. For a rough check, run the calculator twice with the starting and ending prices and compare the totals to see the sensitivity.
Can I use it for other ERPs?
Yes. The model is generic: a one-time license with percentage maintenance versus a per-user subscription. Replace the inputs with figures from any vendor, though terms such as bundled hosting differ between vendors.
If you are weighing a move and want the numbers tied to your real user, transaction and customization footprint, Netray can review the inputs with you. No obligation.
Related Tools
QAD EOQ and Reorder Point Calculator
Calculate economic order quantity, safety stock and reorder point for an item, with a lead-time sweep, to set QAD item planning values on evidence.
ERP Migration & SelectionQAD Customization Migration Effort Calculator
Size the work to carry QAD customizations forward: count them by complexity, set the share you can retire, add testing and contingency.
Costing & FinanceCost Per Good Part Calculator
Build a cost per good part from labor, burden, machine rate, setup, material and scrap, and see how efficiency changes it.
More Other ERPs tools
See all- Infor VISUAL Work Order Status and Structure Reference
- Infor VISUAL Manufacturing Scheduling Checklist
- Infor XA (MAPICS) Period End Close Checklist
- Infor VISUAL Database Table Reference
- Infor XA (MAPICS) Application Module Reference
- IBM i Commands for Infor XA Administrators Reference
- Acumatica Generic Inquiry Design Template
- Acumatica Manufacturing Edition Setup Checklist
- Sage X3 Import Template Worksheet
New to QAD? Start with the QAD guide and toolkit.
Keep exploring
Free tools
- Job Shop ERP Subscription vs Perpetual License Cost CalculatorCompare cumulative cost of a per-user subscription against a perpetual license plus maintenance and hosting, and find the break-even year.
- ERP Subscription vs Perpetual License Breakeven CalculatorFind how many years it takes a perpetual ERP license, with annual maintenance and hosting, to beat a subscription on cumulative cost.
- QAD Adaptive ERP Migration Readiness AssessmentTen scored questions on customizations, integrations, data, reports and people to show how ready a QAD EE site is for Adaptive ERP.
ERP fixes and how-tos
- QAD vs Plex: Which Fits a Discrete Manufacturer?QAD or Plex for a discrete manufacturer? A practical comparison of architecture, shop floor depth, cloud model, customisation, data access, and migration risk.
- QAD ERP Software Implementation: Steps, Environments and Knowledge BaseQAD ERP implementation phases, what the test, development and production environments are for, and where to find QAD knowledge base and documentation.
- QAD ERP Tables and API Access: Key Tables, SQL and Integration OptionsKey QAD ERP tables such as pt_mstr and so_mstr, how to query them via OpenEdge SQL, and which API options exist for integration. Read-only guidance.
AI on your ERP
- AI for QAD Adaptive ERP in automotive and industrial manufacturingAdd AI to QAD Adaptive ERP or Enterprise Edition for automotive and industrial manufacturing, grounded on QXtend and QAD's API layer, on-prem or private cloud.
- AI for QAD Supply Chain: Schedules, Suppliers and MRP ExceptionsAI for QAD supply chain: scheduled order review, supplier delivery risk, MRP exceptions and inventory questions over QAD data, private and on-prem capable.
Integrations
- How to use ChatGPT with QAD Adaptive ERPHow to use ChatGPT with QAD: exports versus live API access, custom GPT actions, enterprise data controls and when a private model is the safer choice.
- How to connect Claude to QAD Adaptive ERPConnect Claude to QAD through an MCP connector, use Anthropic API, AWS Bedrock or Vertex, or go on-prem with open models when QAD data must stay inside.