QAD EOQ and Reorder Point Calculator
Item planning data in QAD, such as order policy, safety stock and order quantity, is often set once and left for years. This calculator derives defensible starting values from demand, cost and lead time so planners can revisit them with evidence.
Your numbers
Purchasing or changeover cost incurred each time you order.
Capital, storage, insurance, obsolescence.
Measure from recent daily or weekly history.
Your results
Assumes normally distributed demand and constant lead time. Validate against your own history and review lot-size and minimum order constraints.
Safety stock and reorder point vs lead time
Sweeps Replenishment lead time from 1 to 90, holding your other inputs fixed.
Item planning parameter review
Get an optional expert review of safety stock and order policy settings across your item master.
Optional. The tool and every export work without this. No spam.
How to use it
Enter annual demand, the cost of placing one order, the unit cost and your carrying cost rate. Then enter the replenishment lead time and the standard deviation of daily demand taken from recent history. Choose the cycle service level you want to hit: it is the probability of not stocking out during a replenishment cycle. The results give an order quantity, a safety stock and a reorder point you can compare with what the planning record holds today. Drag the lead time slider to see how a slower supplier inflates the buffer.
- Use demand history from the same period for mean and deviation
- Treat lead time as receipt to receipt, not order to ship
- Round order quantity to supplier pack sizes afterwards
- Review high-value items first
Formulas used
Economic order quantity is the square root of two times annual demand times order cost, divided by unit cost times carrying rate. Safety stock is the Z score for the service level times the daily demand deviation times the square root of lead time. Reorder point is average daily demand times lead time plus safety stock. Annual cost adds ordering cost, cycle stock carrying cost for half the order quantity, and carrying cost on safety stock.
Reading the result
Safety stock grows with the square root of lead time, so halving the lead time cuts the buffer by roughly 30 percent, not 50. Raising service level from 95 to 99 percent increases the Z score from about 1.64 to 2.33, a large step in stock for a small gain in availability. If safety stock dwarfs cycle stock, the better lever is usually supplier reliability or demand visibility rather than more inventory. Class items by value before applying one policy to all.
Common mistakes
Using monthly deviation as if it were daily inflates safety stock, so convert units first. Applying EOQ where a supplier imposes minimums or price breaks gives a quantity you cannot buy. Ignoring lead time variability understates risk for imported parts. Finally, a formula is a starting point: lumpy or project-driven demand does not follow the normal assumption, and these items often need time-phased planning instead.
Frequently Asked Questions
Where do these values go in QAD?
Item planning data such as safety stock, order quantity and order policy is maintained on the item planning record. Menu names differ by release, so confirm the program in your own menu before loading values in bulk.
What service level should I pick?
Match it to item importance. Many plants use 95 to 99 percent for critical or long lead items and 90 to 95 percent for low-value commodity parts, then review cost against stockout impact.
How do I get demand deviation?
Export daily or weekly usage for the past 6 to 12 months, compute the standard deviation, and convert to a daily figure if you used weekly buckets by dividing by the square root of days in the bucket.
Is EOQ still relevant for MRP-driven items?
For stable, continuous-demand items it is a sound starting point. For items planned lot for lot against firm requirements, safety stock still helps but EOQ matters less.
If you would like item planning parameters analysed across your whole item master rather than one part at a time, Netray can help build that from your ERP data.
Related Tools
QAD Subscription vs Perpetual License TCO Calculator
Model the multi-year total cost of owning QAD on a perpetual license plus maintenance versus a cloud subscription, and find the break-even year.
MES & Shop FloorTakt Time and Machine Count Calculator
Convert monthly demand, shifts and breaks into takt time, then find how many machines are needed at your cycle time and OEE.
Other ERPsIFS Shop Order Lead Time Calculator
Estimate how long a shop order really takes through its routing, and what share of that time is actual work, as a check on lead times stored in IFS.
More Other ERPs tools
See all- Infor VISUAL Work Order Status and Structure Reference
- Infor VISUAL Manufacturing Scheduling Checklist
- Infor XA (MAPICS) Period End Close Checklist
- Infor VISUAL Database Table Reference
- Infor XA (MAPICS) Application Module Reference
- IBM i Commands for Infor XA Administrators Reference
- Acumatica Generic Inquiry Design Template
- Acumatica Manufacturing Edition Setup Checklist
- Sage X3 Import Template Worksheet
New to QAD? Start with the QAD guide and toolkit.
Keep exploring
Free tools
- SAP B1 Reorder Point, Safety Stock and EOQ CalculatorTurn demand, variability and lead time into a safety stock, reorder point and economic order quantity you can key into item master and MRP settings.
- SAP Reorder Point and Safety Stock Field CalculatorWork out the reorder point and safety stock values to enter in the SAP MRP 1 view for reorder point planning materials.
- SyteLine Reorder Point and Safety Stock CalculatorWork out statistically sound safety stock and reorder point values for SyteLine items from demand variability, lead time and service level.
ERP fixes and how-tos
- SyteLine item usage report: get item consumption historyHow to get item usage history in SyteLine for reorder points and MRP tuning: standard transaction reports, a SQL pull from matltran and an Excel pivot.
- QAD vs Plex: Which Fits a Discrete Manufacturer?QAD or Plex for a discrete manufacturer? A practical comparison of architecture, shop floor depth, cloud model, customisation, data access, and migration risk.
- QAD ERP Software Implementation: Steps, Environments and Knowledge BaseQAD ERP implementation phases, what the test, development and production environments are for, and where to find QAD knowledge base and documentation.
Guides
- SyteLine Min/Max Reorder Point Planning Setup GuideConfigure min/max reorder point planning in Infor SyteLine including order point calculations, reorder quantities, and replenishment setup for optimal stock.
- How to Set Up Min-Max Planning in SyteLineStep-by-step guide to configuring min-max inventory planning in Infor SyteLine CloudSuite Industrial, including reorder points, safety stock, and automatic order generation.
AI on your ERP
- AI for QAD Adaptive ERP in automotive and industrial manufacturingAdd AI to QAD Adaptive ERP or Enterprise Edition for automotive and industrial manufacturing, grounded on QXtend and QAD's API layer, on-prem or private cloud.
- AI for QAD Supply Chain: Schedules, Suppliers and MRP ExceptionsAI for QAD supply chain: scheduled order review, supplier delivery risk, MRP exceptions and inventory questions over QAD data, private and on-prem capable.
Integrations
- How to use ChatGPT with QAD Adaptive ERPHow to use ChatGPT with QAD: exports versus live API access, custom GPT actions, enterprise data controls and when a private model is the safer choice.
- How to connect Claude to QAD Adaptive ERPConnect Claude to QAD through an MCP connector, use Anthropic API, AWS Bedrock or Vertex, or go on-prem with open models when QAD data must stay inside.