Progress .pf Connection Parameter File Generator for QAD
A Progress parameter file tells a client session which database to connect to and how. This tool writes the standard network connection lines for a QAD database so you do not have to remember the options.
Fill in
Client connection file (qad_client.pf)
-db qaddb -H qadserver.example.com -S 20000 -N TCP -ld qaddb
Client session file with code page and temp files
# Session parameters for qaddb -pf qad_client.pf -cpinternal utf-8 -cpstream utf-8 -T /tmp -s 128 -mmax 8192
Command line equivalent
_progres -pf qad_client.pf -p myreport.p
Parameter names are standard OpenEdge client startup options. Port, host and code page must match what your DBA configured on the database broker. Values for -s and -mmax are examples only; follow your QAD installation guide. A .pf file can contain a user id and password with -U and -P, but avoid storing credentials in plain text.
Planning read-only access to QAD data?
Optional: a short review of how to expose QAD data safely for reporting or AI.
Optional. The tool and every export work without this. No spam.
How to use it
Enter the database name, the host the broker runs on, and the service name or port from your database configuration. Copy the first block into a file called something like qad_client.pf and save it where the client launch script can find it. The second block adds a code page, temp directory and memory options, and refers to the first file with -pf, so connection details stay in one place. Launch a session with the command line shown in the third block and replace the procedure name with yours.
What each option means
-db names the database and -H the host that runs the broker. -S is the service name from the services file or a port number, and -N TCP selects the network protocol. -ld sets a logical name that your code refers to, which may differ from the physical database name. -cpinternal and -cpstream control the code page used in memory and for file streams, which matters when item descriptions contain accented or non-Latin characters.
Troubleshooting connection errors
If the connection fails, check that the broker is running and the port is open between client and server. A mismatch in service name is the most common cause, followed by firewall rules and a wrong host name. Code page warnings show up as strange characters in exports rather than failed connects. When several databases are needed, create one .pf per database and chain them with extra -pf lines.
Common mistakes
Do not put production passwords into a shared parameter file. Do not point reporting jobs at the production broker when a replica exists. Keep a separate file per environment with a clear name such as qad_test.pf. Finally, keep comments at the start of a line with a hash so they are ignored.
Frequently Asked Questions
What is a .pf file?
A parameter file is a plain text file of Progress startup options, one per line. It lets you reuse database connection and session settings without typing them each time on the command line.
Do I need -ld?
Only if your code refers to the database under a different name than its physical name, or you connect to several databases. Otherwise the physical name works as the logical name.
Can I comment a .pf file?
Yes. Lines starting with a hash are treated as comments in OpenEdge parameter files. Use them to document the purpose of each environment file.
Is this safe for production?
The file itself only contains connection details. Safety depends on the user account you connect with, so use a read-only account for reporting and never share administrator credentials.
If you want read-only reporting or AI access to QAD data without scattering connection files, we can design a safe access layer.
Related Tools
QAD Progress 4GL Query Generator
Fill in domain, site and a part prefix to get ready-to-run, read-only Progress 4GL queries against common QAD EE tables.
Other ERPsQAD Core Tables Reference
A searchable lookup of the QAD EE tables you query most, what each holds and how they are keyed.
ERP Migration & SelectionQAD Customization Inventory Worksheet
An editable list of customizations, reports and interfaces with a decision and effort estimate for each, to plan an upgrade or move.
Developer ToolsIFS Applications Oracle SQL Query Generator
Fill in site and part to get read-only Oracle SQL against common IFS Applications views for shop orders, stock and customer orders.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
New to QAD? Start with the QAD guide and toolkit.
Keep exploring
Free tools
- QAD Progress 4GL Query GeneratorFill in domain, site and a part prefix to get ready-to-run, read-only Progress 4GL queries against common QAD EE tables.
- QAD Progress OpenEdge Database Maintenance ChecklistDaily, weekly, monthly, pre-upgrade and disaster recovery tasks for on-prem QAD databases on Progress OpenEdge, with the utility to use for each.
- QAD Progress OpenEdge Storage Area Sizing Calculator (Records per Block)Work out records per block, block count and storage area size today and after growth for a large QAD table such as tr_hist or ld_det.
ERP fixes and how-tos
- QAD Says "Unable to Connect to the Application Server": How to Fix ItQAD Enterprise Applications cannot connect to the application server. Check the AppServer broker status, licensing, firewall, and connection string to fix it fast.
- QAD "Lock Table Overflow, Increase -L on Server (915)": Cause and FixQAD or Progress throws 'Lock table overflow, increase -L on server (915)'. Learn what fills the lock table, how to find the culprit, and how to raise -L safely.
- QAD Progress BI File Growing Huge: Causes and How to Truncate ItThe before-image (.bi) file of a QAD Progress database keeps growing and fills the disk. Find the open transaction behind it and truncate bi safely with proutil.
AI on your ERP
- AI for QAD Adaptive ERP in automotive and industrial manufacturingAdd AI to QAD Adaptive ERP or Enterprise Edition for automotive and industrial manufacturing, grounded on QXtend and QAD's API layer, on-prem or private cloud.
- AI for QAD Supply Chain: Schedules, Suppliers and MRP ExceptionsAI for QAD supply chain: scheduled order review, supplier delivery risk, MRP exceptions and inventory questions over QAD data, private and on-prem capable.
Integrations
- How to use ChatGPT with QAD Adaptive ERPHow to use ChatGPT with QAD: exports versus live API access, custom GPT actions, enterprise data controls and when a private model is the safer choice.
- How to connect Claude to QAD Adaptive ERPConnect Claude to QAD through an MCP connector, use Anthropic API, AWS Bedrock or Vertex, or go on-prem with open models when QAD data must stay inside.
Software
- QAD Adaptive ERPIndependent guide to QAD Adaptive ERP, the manufacturing ERP formerly known as MFG/PRO: modules, integrations, limits, alternatives and AI uses.
- Accruent Maintenance ConnectionAccruent Maintenance Connection explained: CMMS work orders, preventive maintenance, assets, inventory, integrations, fit, limits and alternatives.