Recursive BOM Explosion SQL Generator (CTE for PostgreSQL, SQL Server, Oracle, MySQL)
Multi-level BOM explosions and where-used lists are two of the most common queries in manufacturing data work. A recursive common table expression does both in a single statement. This generator writes the query for four common databases using the table and column names you give it.
Fill in
Generic name. Replace with your ERP table or view.
Guards against circular BOMs.
PostgreSQL
WITH RECURSIVE bom_tree AS (
SELECT b.parent_item AS parent_item,
b.component_item AS component_item,
b.qty_per AS qty_per,
b.qty_per AS ext_qty,
1 AS lvl
FROM bom_line b
WHERE b.parent_item = 'ASM-1000'
AND b.eff_from <= DATE '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > DATE '2026-10-20')
UNION ALL
SELECT b.parent_item, b.component_item, b.qty_per,
t.ext_qty * b.qty_per, t.lvl + 1
FROM bom_line b
JOIN bom_tree t ON b.parent_item = t.component_item
WHERE t.lvl < 20
AND b.eff_from <= DATE '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > DATE '2026-10-20')
)
SELECT lvl, parent_item, component_item, qty_per, ext_qty
FROM bom_tree
ORDER BY lvl, parent_item, component_item;SQL Server (no RECURSIVE keyword)
WITH bom_tree AS (
SELECT b.parent_item AS parent_item,
b.component_item AS component_item,
b.qty_per AS qty_per,
CAST(b.qty_per AS decimal(18,6)) AS ext_qty,
1 AS lvl
FROM bom_line b
WHERE b.parent_item = 'ASM-1000'
AND b.eff_from <= CAST('2026-10-20' AS date)
AND (b.eff_to IS NULL OR b.eff_to > CAST('2026-10-20' AS date))
UNION ALL
SELECT b.parent_item, b.component_item, b.qty_per,
CAST(t.ext_qty * b.qty_per AS decimal(18,6)), t.lvl + 1
FROM bom_line b
JOIN bom_tree t ON b.parent_item = t.component_item
WHERE t.lvl < 20
AND b.eff_from <= CAST('2026-10-20' AS date)
AND (b.eff_to IS NULL OR b.eff_to > CAST('2026-10-20' AS date))
)
SELECT lvl, parent_item, component_item, qty_per, ext_qty
FROM bom_tree
ORDER BY lvl, parent_item, component_item
OPTION (MAXRECURSION 20);Oracle
WITH bom_tree (parent_item, component_item, qty_per, ext_qty, lvl) AS (
SELECT b.parent_item, b.component_item, b.qty_per, b.qty_per, 1
FROM bom_line b
WHERE b.parent_item = 'ASM-1000'
AND b.eff_from <= DATE '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > DATE '2026-10-20')
UNION ALL
SELECT b.parent_item, b.component_item, b.qty_per,
t.ext_qty * b.qty_per, t.lvl + 1
FROM bom_line b
JOIN bom_tree t ON b.parent_item = t.component_item
WHERE t.lvl < 20
AND b.eff_from <= DATE '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > DATE '2026-10-20')
)
SELECT lvl, parent_item, component_item, qty_per, ext_qty
FROM bom_tree
ORDER BY lvl, parent_item, component_item;MySQL 8 and later
WITH RECURSIVE bom_tree AS (
SELECT b.parent_item AS parent_item,
b.component_item AS component_item,
b.qty_per AS qty_per,
b.qty_per AS ext_qty,
1 AS lvl
FROM bom_line b
WHERE b.parent_item = 'ASM-1000'
AND b.eff_from <= '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > '2026-10-20')
UNION ALL
SELECT b.parent_item, b.component_item, b.qty_per,
t.ext_qty * b.qty_per, t.lvl + 1
FROM bom_line b
JOIN bom_tree t ON b.parent_item = t.component_item
WHERE t.lvl < 20
AND b.eff_from <= '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > '2026-10-20')
)
SELECT lvl, parent_item, component_item, qty_per, ext_qty
FROM bom_tree
ORDER BY lvl, parent_item, component_item;Where-used (PostgreSQL, upward)
WITH RECURSIVE where_used AS (
SELECT b.parent_item AS parent_item, b.component_item AS component_item, 1 AS lvl
FROM bom_line b
WHERE b.component_item = 'ASM-1000'
AND b.eff_from <= DATE '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > DATE '2026-10-20')
UNION ALL
SELECT b.parent_item, b.component_item, w.lvl + 1
FROM bom_line b
JOIN where_used w ON b.component_item = w.parent_item
WHERE w.lvl < 20
AND b.eff_from <= DATE '2026-10-20'
AND (b.eff_to IS NULL OR b.eff_to > DATE '2026-10-20')
)
SELECT DISTINCT parent_item, lvl FROM where_used ORDER BY lvl, parent_item;Table and column names are generic. Map them to your ERP BOM table or a view that exposes parent, component, quantity and effectivity. Most ERPs add scrap factors, yield, phantom handling, alternates and revision logic that this query does not apply, so extended quantity here is a plain product of quantities per. Test on a small assembly first and compare with the ERP's own BOM report. Run read-only queries on a replica when possible.
BOM query review
Optional help mapping this query to your actual ERP BOM tables and checking it against standard ERP reports.
Optional. The tool and every export work without this. No spam.
How to use the generator
Enter your BOM table or view and the column names for parent, component, quantity per and effectivity dates, then choose the top item, an as-of date and a maximum depth. Copy the block for your database. The query returns each level, the parent and component and the extended quantity, which is the quantity per multiplied down the path. Run it on a few assemblies you know well and compare to your ERP.
- The first select is the anchor: direct components of the top item
- The second select joins children to the rows found so far
- The depth limit stops runaway loops from circular BOMs
How the recursion works
A recursive CTE starts with an anchor query and repeatedly joins the table to the previous result until no new rows appear. Each pass adds one BOM level. Extended quantity is carried forward by multiplying the parent's extended quantity by the component's quantity per. Syntax differs: PostgreSQL and MySQL need the RECURSIVE keyword, SQL Server and Oracle do not, and SQL Server enforces a default limit of 100 recursion levels unless you set MAXRECURSION.
Common mistakes
Forgetting an effectivity filter returns every historical revision at once and inflates quantities. Ignoring unit of measure differences between levels gives wrong totals. Phantom assemblies, scrap and yield factors, and alternate BOMs change the true requirement, and a plain product of quantities will not show them. Also remember that the same component can appear on several paths, so sum by component if you want a flat requirement. Add cycle detection if your data quality is uncertain.
Frequently Asked Questions
What is a recursive CTE?
A common table expression that references itself. It starts from an anchor query, then repeatedly applies a second query to the previous result until nothing new is returned. It is the standard SQL way to walk hierarchies like a bill of materials.
How do I flatten the result to total quantity per component?
Wrap the final select and group by component_item with a sum of ext_qty. If the same component appears at several levels or under several parents, the sum gives the total required per one top level unit, before scrap and yield.
Why does my query stop at 100 levels in SQL Server?
SQL Server has a default MAXRECURSION of 100. The generated SQL Server block sets the option to your maximum depth. A BOM deeper than 100 levels is rare and often signals a loop or a data problem worth checking.
Can I run this directly on my ERP database?
Only if you know the real table structure and your vendor and IT policies allow direct reads. Prefer a read replica or reporting view, never write to ERP tables with SQL, and confirm against the ERP's own BOM report.
Netray works with BOM and routing data in ERPs such as SyteLine, SAP, Oracle and others, and can talk through read-only query patterns and data checks.
Related Tools
SAP BOM Where-Used SQL Generator
Fill in a component, plant and BOM usage to get SQL that lists every parent BOM using it, plus a query for BOM items with dependencies.
Developer ToolsBOM Low Level Code Python Script Generator
Fill in your CSV file and column names and get a Python script that assigns low level codes and flags circular BOMs.
Engineering & PLMBOM Explosion Requirements Worksheet
Explode a bill of materials into component requirements, with quantity per, scrap allowance and extended cost for each line.
SAPSAP Change Number BOM ABAP Select Generator
Generates an ABAP report snippet that lists BOM items changed under a given SAP change number, joining material-to-BOM, BOM item and change master data.
More Developer Tools tools
See all- SAP Sales Order ABAP SELECT Generator (VBAK, VBAP, VBFA)
- SAP Sales Order Create BAPI ABAP Generator (BAPI_SALESORDER_CREATEFROMDAT2)
- SAP ABAP Open Items SELECT Generator
- SAP ACDOCA SQL Query Generator
- SAP QM Inspection Lot ABAP SELECT Generator
- SAP Quality Notification Pareto SQL Query Generator
- SAP QM Usage Decision BAPI Skeleton
- ABAP Custom Exception Class Generator
- ABAP Unit Test Class Generator
Keep exploring
Free tools
- BOM Cost Rollup Recursive CTE SQL GeneratorName your BOM and cost tables and get a recursive SQL query that explodes a bill of material and rolls up purchased component cost.
- Epicor Indented BOM Recursive CTE SQL GeneratorFill in company, top part, revision and level limit to get a working recursive CTE over Erp.PartMtl and Erp.PartRev, with one approved revision per child and the matching BAQ Designer layout.
- JD Edwards F3002 Multi-Level BOM Explosion SQL GeneratorGenerate an Oracle recursive SQL query that explodes a JD Edwards bill of material from F3002 level by level, plus a check of a work order parts list in F3111.
ERP fixes and how-tos
- How to Export an Indented (Multi-Level) BOM from SyteLineExport a multi-level indented BOM from SyteLine/CSI to Excel or CSV using the application's reports and grid export, or a recursive SQL query with a sample.
- Epicor BAQ Recursive BOM Join on PartMtl, Previous Operation Complete and Stale HeadersMulti-level BOM in an Epicor BAQ: join PartMtl to itself, previous-operation-complete logic, table relations, and fixing stale column headers.