SAPFree templatePDF, Excel, Word exportSAP BW/4HANAAll SAP BW and BW/4HANA tools

SAP BW/4HANA private AI layer blueprint generator

This generator turns a few facts about your SAP BW/4HANA landscape into a structured architecture plan for a private AI layer: data access path, reporting copy, retrieval index, model serving, tool server, identity and audit. Export it to PDF or Word and take it to your architecture and security review.

Fill in

Live preview
Free, optional. Reopen it on any device.
Download:

SAP BW and BW/4HANA Private AI Layer Blueprint Generator

Private AI Layer Architecture Plan: SAP BW/4HANA

Prepared for: Acme Precision Ltd System: SAP BW/4HANA 2.0 on SAP HANA Hosting: On-prem server Named users: 120 Sites: Group reporting, 4 plants Target go-live: 2027-03-31

Context and scope

Acme Precision Ltd runs SAP BW/4HANA 2.0 and wants an AI assistant that works on its own data without moving that data to an external service. The assistant is read-only first, answers with cited records, and writes back only through supported interfaces after human approval.

Main use cases: Natural-language lookup of trusted queries, scrap and OTD by plant, cost centre variance explanations, KPI definition search

Data that must never leave the site: Individual salary data, consolidated results before release, customer-level margins

Components

ComponentDesignNotes
Data access pathExisting BW queries on CompositeProviders and aDSOs, exposed through OData (Easy Query where available), MDX/XMLA, or generated external HANA viewsQueries carry business logic and analysis authorizations; avoid SQL on base tables
Reporting copyNone for governed queries; optional ODP-based extraction of approved providers for a separate analytics storeOnly if live query load is a concern
Retrieval indexMetadata catalogue: query names, characteristics, key figures, units, variables, InfoObject texts, hierarchies and report documentationInclude data-as-of from process chain status
Model servingOpen-weight model on vLLM, Two to four data-centre GPUsArithmetic is done in BW or code, not by the model
Tool serverTyped tools per governed query with variables, row caps and mandatory filtersReturn tables plus narrative
Identity and permissionsSSO to BW user so the OLAP engine applies analysis authorizations (RSECADMIN); mirrored values only for replicated storesTest with restricted analysts
AuditLog of question, query, variables, row count and result hashKeep for finance audit needs

Security controls mapped to your inputs

ControlHow it is met
Data stays on siteHosting: On-prem server. No dependency on external analytics or AI services.
Governed numbersOnly approved queries are tools, so numbers match the reports controlling already trusts.
Row-level accessAnalysis authorizations applied per user for 120 named users; fail closed on unknown users.
Protected dataExcluded from tools and catalogue: Individual salary data, consolidated results before release, customer-level margins
Read-onlyNo write-back; planning functions stay with planning users and their own front ends.

Three-phase rollout

PhaseScopeExit criteria
1. Read-onlyCatalogue and natural-language lookup of existing queries and definitionsAnswer accuracy on a fixed question set agreed with business owners; zero authorization leaks in testing
2. DraftsGoverned query execution with narrative answers and data-as-of timestampsDrafts accepted without edit at an agreed rate; audit log reviewed
3. Approved actionsScheduled summaries that analysts review before distributionApproval workflow tested; rollback and idempotency verified

Open questions for IT

1. Which BW release and which exposure options (OData, MDX, HANA views) are enabled? 2. Which queries are trusted enough to become tools? 3. How are analysis authorizations structured and who maintains them? 4. Which queries are time dependent or use currency conversion that the narrative must mention? 5. How is data freshness exposed (process chains, load status)? 6. Which GPU option (Two to four data-centre GPUs) fits the peak concurrency for 120 users? Use the sizing calculator to check.

Approvals

Prepared by / Date
IT architecture / Date
Security officer / Date
Business owner / Date

This is a planning starting point, not a design guarantee. Verify interface availability, object names and licence terms against your exact release and contract before building.

Review of your SAP BW/4HANA AI blueprint

Optional: send the exported plan and we will comment on the data access path, permissions model and rollout order. The generator works fully without it.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the generator

Fill the ten fields on the left: company, version, database, hosting model, named users, sites, use cases, data that must never leave the site, GPU availability and target go-live. The plan updates as you type. Be specific in the use cases and protected-data boxes, because those drive the tool list and the exclusions the plan describes. Export the result and mark the open questions that your team cannot answer yet; those become the first workshop agenda.

  • Pick the real version, since interfaces differ by release
  • List protected data explicitly, one item per line
  • Choose Air-gapped if no outbound internet is allowed
  • Keep named users realistic, not the licence maximum

What the plan is built on

Every plan follows the same private-AI pattern: read-only access first, a reporting copy or governed interface for heavy questions, a retrieval index over documents with ownership metadata, an open-weight model served locally with vLLM or Ollama, a tool server exposing named read actions, an identity layer that mirrors the system's own permissions, and an append-only audit log. The table rows are specific to SAP BW/4HANA: they name its real data access mechanisms rather than generic placeholders.

How to read and challenge the result

Treat the components table as a hypothesis. Ask your SAP BW/4HANA administrators whether each named interface is enabled and licensed, whether the permission model can really be mirrored, and who owns each refresh job. Then walk the rollout table: each phase has exit criteria, and the next phase should not start until the criteria are met. The open-questions block is deliberately uncomfortable; unanswered items are where projects stall.

  • Confirm licence terms for every data access path
  • Test permissions with a restricted user, not an administrator
  • Decide the audit retention period before go-live
  • Plan for the next system upgrade from day one

Common mistakes

The most common mistake is giving the model direct database access because it is quick in a demo. It skips the application's own authorization and business logic, and it is hard to defend in a security review. The second is skipping the document index metadata, so a retrieval hit shows content the user cannot open in the source system. The third is starting with write-back. Start read-only, measure accuracy, then add drafts, then approved actions.

Frequently Asked Questions

Does the generated plan require any cloud service?

No. The plan assumes the model, index, tool server and audit log run on your own servers or in your private cloud, and the air-gapped option removes outbound internet entirely. You can still choose to use a cloud service for specific non-sensitive tasks, but the plan does not depend on one.

Is the plan accurate for my exact version?

It is a well-grounded starting point, not a guarantee. Interface availability, support package levels and licence terms vary. Verify each data access path with your administrators and the vendor documentation for your release before committing to a design.

Can I use this for a security review?

Yes, as input. The security controls table maps controls to your inputs, which gives reviewers a concrete starting point. They will add their own requirements, such as logging standards, key management and network segmentation.

What does the GPU choice change?

It changes which model sizes and how many concurrent users you can serve. Use the sizing and value calculator to estimate peak concurrency and GPUs from your own question volumes, then update the plan with the result.

If you want a second pair of eyes on the plan, Netray builds private AI layers on SAP BW/4HANA and similar on-prem systems and can review your draft with your IT team.

Get SAP BW and BW/4HANA alerts

Support and maintenance deadlines, release changes that affect SAP BW and BW/4HANA sites, and new free SAP BW and BW/4HANA tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP BW and BW/4HANA: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP BW and BW/4HANA? Start with the SAP BW and BW/4HANA guide and toolkit.

Keep exploring