Developer ToolsFree generatorPDF, Excel, Word exportSAP ECC 6.0All SAP ECC 6.0 tools

SAP BAPI for Material Creation: BAPI_MATERIAL_SAVEDATA ABAP Generator

This generator writes a complete ABAP report that creates a material master in SAP ECC 6.0 with BAPI_MATERIAL_SAVEDATA, covering basic, sales, purchasing, MRP and accounting views. It fills each data structure and its X flag structure, handles internal or external numbering and commits only when the BAPI returns no error.

Fill in

INTERNAL calls BAPI_MATERIAL_GETINTNUMBER first.

PCE is the ISO code behind EA/ST in a standard system.

Generated code
Free, optional. Reopen it on any device.
Download:

ABAP report: BAPI_MATERIAL_SAVEDATA

REPORT z_bapi_material_savedata.

* Creates a material with BAPI_MATERIAL_SAVEDATA (SAP ECC 6.0).
* Every value in a data structure needs its flag in the matching X structure.

DATA: ls_head   TYPE bapimathead,
      ls_mara   TYPE bapi_mara,
      ls_marax  TYPE bapi_marax,
      ls_marc   TYPE bapi_marc,
      ls_marcx  TYPE bapi_marcx,
      ls_mvke   TYPE bapi_mvke,
      ls_mvkex  TYPE bapi_mvkex,
      ls_mbew   TYPE bapi_mbew,
      ls_mbewx  TYPE bapi_mbewx,
      ls_makt   TYPE bapi_makt,
      lt_makt   TYPE STANDARD TABLE OF bapi_makt,
      ls_return TYPE bapiret2,
      ls_ret1   TYPE bapireturn1,
      ls_matnr  TYPE bapimatinr,
      lt_matnr  TYPE STANDARD TABLE OF bapimatinr.

START-OF-SELECTION.

* Material number: external number, or ask the number range for one
  IF 'EXTERNAL' = 'INTERNAL'.
    CALL FUNCTION 'BAPI_MATERIAL_GETINTNUMBER'
      EXPORTING
        material_type    = 'FERT'
        industry_sector  = 'M'
        required_numbers = 1
      IMPORTING
        return           = ls_ret1
      TABLES
        material_number  = lt_matnr.
    IF ls_ret1-type = 'E' OR ls_ret1-type = 'A'.
      WRITE: / 'Internal number assignment failed:', ls_ret1-message.
      RETURN.
    ENDIF.
    READ TABLE lt_matnr INTO ls_matnr INDEX 1.
    ls_head-material = ls_matnr-material.
  ELSE.
    CALL FUNCTION 'CONVERSION_EXIT_MATN1_INPUT'
      EXPORTING
        input  = 'FG-100200'
      IMPORTING
        output = ls_head-material
      EXCEPTIONS
        OTHERS = 1.
  ENDIF.

* Header: industry sector, material type and the views to create
  ls_head-ind_sector = 'M'.
  ls_head-matl_type  = 'FERT'.
  IF 'Y' = 'Y'.
    ls_head-basic_view = 'X'.
  ENDIF.
  IF 'Y' = 'Y'.
    ls_head-sales_view = 'X'.
  ENDIF.
  IF 'N' = 'Y'.
    ls_head-purchase_view = 'X'.
  ENDIF.
  IF 'Y' = 'Y'.
    ls_head-mrp_view = 'X'.
  ENDIF.
  IF 'Y' = 'Y'.
    ls_head-account_view = 'X'.
  ENDIF.

* Client level (MARA). BASE_UOM is the internal unit (e.g. ST for each
* in many systems); BASE_UOM_ISO takes the ISO code and is converted.
  ls_mara-base_uom_iso  = 'PCE'.
  ls_mara-matl_group    = '001'.
  ls_marax-base_uom_iso = 'X'.
  ls_marax-matl_group   = 'X'.

* Plant level (MARC). Key field PLANT carries the value in the X structure.
  ls_marc-plant       = '1000'.
  ls_marc-mrp_type    = 'PD'.
  ls_marc-mrp_ctrler  = '001'.
  ls_marc-lotsizekey  = 'EX'.
  ls_marc-proc_type   = 'E'.
  ls_marc-pur_group   = '001'.
  ls_marcx-plant      = '1000'.
  ls_marcx-mrp_type   = 'X'.
  ls_marcx-mrp_ctrler = 'X'.
  ls_marcx-lotsizekey = 'X'.
  ls_marcx-proc_type  = 'X'.
  ls_marcx-pur_group  = 'X'.

* Sales level (MVKE)
  ls_mvke-sales_org   = '1000'.
  ls_mvke-distr_chan  = '10'.
  ls_mvke-delyg_plnt  = '1000'.
  ls_mvke-item_cat    = 'NORM'.
  ls_mvkex-sales_org  = '1000'.
  ls_mvkex-distr_chan = '10'.
  ls_mvkex-delyg_plnt = 'X'.
  ls_mvkex-item_cat   = 'X'.

* Valuation (MBEW). Assumes valuation area = plant (valuation at plant level).
  ls_mbew-val_area    = '1000'.
  ls_mbew-val_class   = '7920'.
  ls_mbew-price_ctrl  = 'S'.
  ls_mbew-price_unit  = 1.
  ls_mbewx-val_area   = '1000'.
  ls_mbewx-val_class  = 'X'.
  ls_mbewx-price_ctrl = 'X'.
  ls_mbewx-price_unit = 'X'.
  IF 'S' = 'S'.
    ls_mbew-std_price  = '245.50'.
    ls_mbewx-std_price = 'X'.
  ELSE.
    ls_mbew-moving_pr  = '245.50'.
    ls_mbewx-moving_pr = 'X'.
  ENDIF.

* Description (MAKT). LANGU is the internal 1-character key, e.g. E.
  ls_makt-langu     = 'E'.
  ls_makt-matl_desc = 'Hydraulic pump assembly 40 bar'.
  APPEND ls_makt TO lt_makt.

* Do not pass data for views that were not requested
  IF 'Y' <> 'Y'.
    CLEAR: ls_mvke, ls_mvkex.
  ENDIF.
  IF 'Y' <> 'Y'.
    CLEAR: ls_mbew, ls_mbewx.
  ENDIF.
  IF 'Y' <> 'Y' AND 'N' <> 'Y'.
    CLEAR: ls_marc, ls_marcx.
  ENDIF.

  CALL FUNCTION 'BAPI_MATERIAL_SAVEDATA'
    EXPORTING
      headdata            = ls_head
      clientdata          = ls_mara
      clientdatax         = ls_marax
      plantdata           = ls_marc
      plantdatax          = ls_marcx
      valuationdata       = ls_mbew
      valuationdatax      = ls_mbewx
      salesdata           = ls_mvke
      salesdatax          = ls_mvkex
    IMPORTING
      return              = ls_return
    TABLES
      materialdescription = lt_makt.

  IF ls_return-type = 'E' OR ls_return-type = 'A'.
    CALL FUNCTION 'BAPI_TRANSACTION_ROLLBACK'.
    WRITE: / 'Error:', ls_return-id, ls_return-number, ls_return-message.
  ELSE.
    CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
      EXPORTING
        wait = 'X'.
    WRITE: / ls_head-material, ls_return-type, ls_return-message.
  ENDIF.

Check in SE37 and SE11 on your release: BAPI_MATERIAL_SAVEDATA parameters, the BAPI_MARA, BAPI_MARC, BAPI_MVKE and BAPI_MBEW fields used, and whether your system uses MATERIAL_LONG (40-character numbers). Mandatory fields per view come from your material type and field selection (OMS2, OMSR), so a material type may need fields not in this template. Sales views often also need TAXCLASSIFICATIONS. Test in a sandbox client first.

Get your material load reviewed

Send us your material type, required views and field selection and we will check the generated program against your ECC setup before you run a migration load.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Pick external or internal numbering, then enter the material type, plant, sales area, valuation class and price. Set the views you want to Y. The report is ready to paste into SE38 as an executable program. Run it once in a test client, read the message in the list output, and check the result in MM03. For a bulk load, keep the same structure and loop over your file, calling BAPI_TRANSACTION_COMMIT per material so one bad record does not roll back the batch.

  • INTERNAL numbering calls BAPI_MATERIAL_GETINTNUMBER with material type and industry sector, then uses the returned number.
  • EXTERNAL numbering runs CONVERSION_EXIT_MATN1_INPUT so numeric numbers get leading zeros.
  • Valuation area is set to the plant, which assumes valuation at plant level (the usual ECC setup).

How the BAPI structures map to tables

HEADDATA (BAPIMATHEAD) carries the material number, industry sector, material type and one flag per view. CLIENTDATA (BAPI_MARA) maps to MARA, PLANTDATA (BAPI_MARC) to MARC, SALESDATA (BAPI_MVKE) to MVKE, VALUATIONDATA (BAPI_MBEW) to MBEW and the MATERIALDESCRIPTION table (BAPI_MAKT) to MAKT. Each data structure has an X twin (BAPI_MARAX, BAPI_MARCX and so on). A value is written only when its X field is 'X'. Key fields are the exception: in BAPI_MARCX the PLANT field holds the plant value, in BAPI_MVKEX the sales org and channel hold their values, and in BAPI_MBEWX the valuation area holds its value.

Gotchas that cause most failures

The single RETURN parameter is a BAPIRET2 structure, not a table, and it often reports only the last message. If you need every message, add the RETURNMESSAGES table to the call. Units are the next trap: BASE_UOM expects the internal unit (for each, that is commonly ST, shown as EA in English), so the template uses BASE_UOM_ISO with PCE and lets the BAPI convert. Languages work the other way: LANGU is the internal key E, while LANGU_ISO would be EN. Finally, the BAPI respects field selection for the material type, so a required field you did not pass produces an error even if the view flag is set.

  • Forgetting an X flag: the value is silently ignored.
  • Sales view without a tax classification can fail on systems that require it.
  • Calling COMMIT after an E message saves nothing but hides the error.

How to check the result

Open the material in MM03 and confirm each requested view exists for plant, sales area and valuation area. In SE16, MARA shows the client record, MARC the plant record, MVKE the sales record and MBEW the valuation record with VPRSV equal to your price control and STPRS or VERPR holding the price. MAKT holds the description per language. If a view is missing but no error came back, the matching view flag in HEADDATA was blank. If a field is empty although you passed it, its X flag was missing in the matching X structure.

Frequently Asked Questions

Which SAP BAPI is used for material creation?

BAPI_MATERIAL_SAVEDATA creates and changes material masters in SAP ECC. It takes HEADDATA plus one data structure and one X structure per level (client, plant, sales, valuation, storage location), with descriptions and units in tables. The same call creates a new material or extends an existing one to new plants, sales areas or valuation areas.

Why do I need BAPI_TRANSACTION_COMMIT after BAPI_MATERIAL_SAVEDATA?

BAPIs do not commit on their own. The material is written to the database only when BAPI_TRANSACTION_COMMIT runs, usually with WAIT = 'X' so the update finishes before the next step. If the RETURN type is E or A, call BAPI_TRANSACTION_ROLLBACK instead so no partial data is kept in the same logical unit of work.

How do I extend an existing material to a new plant with this BAPI?

Call BAPI_MATERIAL_SAVEDATA with the existing material number in HEADDATA, the MRP or other plant view flag set, and only PLANTDATA and PLANTDATAX filled for the new plant. Client data is not needed. The same approach extends a material to a new sales area or valuation area.

What does the X structure do in BAPI_MATERIAL_SAVEDATA?

Every data structure such as BAPI_MARC has a matching X structure such as BAPI_MARCX. Setting a field to 'X' tells the BAPI to write that field; blank means leave it alone. This lets the same BAPI change one field without clearing the rest. Key fields like PLANT carry their value, not 'X'.

If you want planners and buyers to ask your ECC system about materials in plain English on your own servers, with any creation going through BAPIs like this one after approval, we can set that up.

Get SAP ECC 6.0 alerts

Support and maintenance deadlines, release changes that affect SAP ECC 6.0 sites, and new free SAP ECC 6.0 tools. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack for SAP ECC 6.0: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

New to SAP ECC 6.0? Start with the SAP ECC 6.0 guide and toolkit, or plan with SAP ECC to S/4HANA Conversion Planner, Training Path Builder, Upgrade Path Planner.

Keep exploring

Free tools

ERP fixes and how-tos

Integrations