SAP Material Master Creation Request Form Template
Bad material masters are the root of many MRP and costing problems. This request form collects the data a master data team needs before running MM01, so views are filled in once by the right owners rather than patched later.
Fill in
SAP Material Master Creation Request Form Template
Material Master Creation Request
Company: Acme Precision Ltd Request date: 2026-10-20 Requested by: S. Mehta, Engineering Plant(s): 1000, 1100
Basic Data
| Field | Value |
|---|---|
| Material type | ROH raw material |
| Description | Bar stock 6061-T6 25mm round |
| Base unit of measure | KG |
| Material group | RAW-ALU |
| Batch managed | Yes |
Planning and Procurement
| Field | Value |
|---|---|
| Procurement type | F external procurement |
| MRP type | PD |
| Lot sizing | EX (lot for lot) |
| Price control | S standard price |
Notes
Mill certificate required with each lot. Preferred supplier is vendor 100245.
Views Required
| View | Needed | Owner |
|---|---|---|
| Basic data | Engineering | |
| Purchasing | Procurement | |
| MRP 1 to 4 | Planning | |
| Work scheduling | Production | |
| Quality management | Quality | |
| Accounting / costing | Finance | |
| Sales and storage | Logistics |
Approvals
Required fields depend on material type, industry sector and field selection configured in your system. Treat this as an intake form and validate against your own field selection groups.
Master data duplicate check
Optional expert review of how to catch duplicate materials before they are created.
Optional. The tool and every export work without this. No spam.
How to use the form
Fill in the basic data first: material type, short description, base unit of measure and material group. Then add planning data such as procurement type, MRP type and lot sizing, and the price control indicator. The views table assigns each SAP view to an owning department so engineering does not fill in costing and finance does not guess at safety stock. Export to PDF, route for sign-off, and give the master data steward one clean document.
What each view controls
Basic data holds description, base unit and weights. Purchasing holds the purchasing group, order unit and goods receipt processing time. MRP views hold the MRP type, MRP controller, lot size, safety stock and planned delivery time. Work scheduling holds production scheduler and in-house production time. Accounting holds valuation class and price control. The material type decides which views are offered, and the plant extension decides which data is plant specific.
Choosing key values
Price control S uses a standard price and records variances, which suits manufactured items. Price control V uses moving average and suits traded goods with stable purchase prices. Procurement type E means the item is made, F means it is bought, and X means both. MRP type PD runs deterministic MRP, while VB is reorder point planning with manual reorder point. Pick lot-for-lot unless there is a real reason for fixed or period lots. Always confirm base unit before the first transaction, because it is very hard to change after stock exists.
Common mistakes
Duplicate materials created because nobody searched first are the largest cost. Descriptions without a standard naming pattern make search useless. Wrong base unit of measure and wrong price control cause costing errors that persist for years. Leaving the MRP controller blank means exceptions have no owner. Create materials with batch management only if you will actually control batches, since turning it on later with stock present is restricted.
Frequently Asked Questions
Which SAP transaction creates a material master?
MM01 creates a material with the selected views, MM02 changes it and MM03 displays it. In S/4HANA the Manage Product Master Data Fiori app is available. Mass creation usually uses LSMW, migration cockpit or a BAPI.
What is the difference between standard and moving average price?
Standard price (S) stays fixed until revalued, and differences between actual and standard post to variance accounts. Moving average price (V) changes with every goods receipt and invoice. Standard price is typical for manufactured items.
Who should own which views?
Commonly engineering owns basic data, procurement owns purchasing data, planning owns MRP views, production owns work scheduling, quality owns inspection data and finance owns accounting. Your governance policy sets the actual split.
Can I change the material type later?
Only in limited cases. Changing it with existing stock or documents is restricted and can need a special transaction and finance involvement. Choose carefully at creation.
Netray can add a duplicate check and field validation in front of material creation, running on your own infrastructure.
Related Tools
SAP Reorder Point and Safety Stock Field Calculator
Work out the reorder point and safety stock values to enter in the SAP MRP 1 view for reorder point planning materials.
SAPSAP Purchase Requisition Approval Form Template
An approval form that mirrors the fields of an SAP purchase requisition so approvers see what they release in ME54N.
SAPSAP Physical Inventory Count Sheet Template
Fill in a count plan and count sheet for SAP physical inventory (MI01, MI04, MI07) and export it as a document.
SAPSAP Vendor Evaluation Scorecard Worksheet
Score vendors on price, quality, delivery and service with weighted points that mirror SAP vendor evaluation (ME61 and ME6x).
More SAP tools
See allKeep exploring
Free tools
- SAP PP Master Data Change Request TemplateA controlled change form for BOMs, routings, work centers and MRP data with impact assessment, approvals and rollback.
- SAP Work Center Master Data Request TemplateA request form for creating or changing an SAP PP work center, covering basic data, capacity, scheduling and costing so master data gets it right the first time.
- SAP Vendor Master Change Request Form TemplateA controlled form for vendor bank, payment term and address changes in SAP, with a call back verification record to reduce payment fraud.
ERP fixes and how-tos
- How to Create a Material in SAP S/4HANA: MM01, Fiori and Manufacturing ViewsCreate a material in SAP S/4HANA with MM01 or the Manage Product Master Fiori app, and see which views a manufactured part needs (MRP, costing).
- How to create a material in SAP MM (MM01) and mass-change it with MM17Create a material master with MM01: material type, views, plant and valuation data, then mass-change fields with MM17. Notes for ECC and S/4HANA.
- SAP S/4HANA Material Groups: Configure, Assign and ReportHow to define material groups in SAP S/4HANA (OMSF), assign them in MM01 and report on spend by group using tables T023, MARA-MATKL and EKPO-MATKL.
Runs with your ERP
- Tacton CPQ with SAP S/4HANA: how the integration worksHow Tacton CPQ connects to SAP S/4HANA and ECC: reusing variant configuration rules, validated BOMs, order creation, setup steps, pitfalls and AI on top.
- SOLIDWORKS PDM with SAP S/4HANA: CIDEON material and BOM integrationHow CIDEON SOLIDWORKS PDM Professional Integration creates and updates SAP materials and BOMs from part lists in S/4HANA: flows, setup, pitfalls and AI.