SAP Work Process Types, SM50 Statuses and On Hold Reasons
This reference covers the SAP work process types (DIA, BTC, UPD, UP2, SPO, ENQ) with the profile parameters that set their counts, the statuses you see in SM50 and SM66, and the reasons shown for On Hold processes. It applies to SAP NetWeaver AS ABAP 7.x and ABAP Platform systems; dynamic work process parameters apply from kernel 7.40.
| Group | Code | Meaning | What it tells you | Action |
|---|---|---|---|---|
Work process type | DIA | Dialog work process, count set by rdisp/wp_no_dia | Serves dialog steps of users, RFC calls and HTTP requests | All DIA busy: check SM50 for long runners, SM66 across instances, add DIA or move load |
Work process type | BTC | Background work process, count set by rdisp/wp_no_btc | Runs jobs scheduled in SM36 and transport import jobs | Jobs waiting in SM37 with status Released: check free BTC processes and operation modes (RZ04) |
Work process type | UPD | Update work process (V1), count set by rdisp/wp_no_vb | Executes time-critical update modules after COMMIT WORK | Update errors or backlog: SM13 for cancelled or waiting updates |
Work process type | UP2 | Update work process (V2), count set by rdisp/wp_no_vb2 | Executes non-critical V2 updates (statistics); if none configured, UPD processes do V2 | Large V2 backlog in SM13: add UP2 or check failing statistics updates |
Work process type | SPO | Spool work process, count set by rdisp/wp_no_spo | Formats output requests for printers | Output stuck: SP01 and SPAD; check the spool server of the output device |
Work process type | ENQ | Enqueue work process, count set by rdisp/wp_no_enq | Manages SAP locks when the enqueue server runs inside an instance (classic installs); with standalone ENSA/ENSA2 in the ASCS there is no ENQ work process | Lock issues: SM12 for lock entries and SMENQ for enqueue statistics |
Parameter | rdisp/wp_max_no | Kernel 7.40 and later: maximum number of work processes, including dynamic ones | Upper limit the dispatcher may start when dynamic work processes are used | Check in RZ11; size to memory and CPU, not just to peak users |
Parameter | rdisp/configurable_wp_no | Kernel 7.40 and later: number of work processes that can be distributed across types | Total configured pool the type parameters draw from | Check in RZ11 together with the rdisp/wp_no_* values |
Status | Running | The process is executing a request | Look at Time, Report, Action and Table columns to see what it is doing | Long runner: check the user and program, ST04 or ST05 for the SQL, cancel only with the owner's agreement |
Status | Waiting | Idle and available for a new request | Free capacity of that type | None; few or no Waiting DIA during the day means a capacity problem |
Status | On Hold | The process is reserved for one request and waits for something, shown in the Reason column | Read the Reason column (PRIV, RFC, CPIC, DEBUG, SLEEP, ADM) | See the reason rows below |
Status | Stopped | The process has terminated and was not restarted | Check the Restart and Err columns; repeated errors point to kernel, memory or database problems | Read dev_w<n> trace and SM21; restart via SM50 or fix the cause |
Reason | PRIV | Private mode: the user context exhausted extended memory and moved to heap memory, binding the process to that user | Memory-hungry transaction; the process cannot serve others until the dialog ends | Find the user and program; check abap/heap_area_dia and ztta/roll_extension in RZ11, and ST02 for extended memory |
Reason | RFC | Waiting for an RFC call to return | Bottleneck may be in the called system or the network | Check the RFC destination in SM59, the gateway (SMGW) and the remote system's SM50 |
Reason | CPIC | Waiting on a CPI-C communication | Older interface or gateway conversation waiting for the partner | Check SMGW gateway connections and the partner program |
Reason | DEBUG | The process is in the ABAP debugger | A developer or support user holds a dialog process (common in QA, a risk in production) | Identify the user; in production, debugging should be controlled and ended quickly |
Reason | SLEEP | The program is waiting (for example WAIT UP TO statement) | Deliberate wait in the code, often polling | Check the program; frequent sleeps in DIA are a design issue |
Reason | ADM | Administrative task of the dispatcher or work process | Usually short and internal | Only investigate if it persists; check dev_w<n> and SM21 |
Action | Action: cancel without core | SM50: select process > Process (Administration > Process in newer releases) > Cancel Without Core | Ends the request; the user session gets a short dump | Use first; check ST22 for the resulting dump |
Action | Action: cancel with core | As above but writes a core file for SAP support analysis | Creates a core dump in the work directory | Only when SAP support asks; core files can be large |
Action | Action: trace | SM50: select process > Process > Trace > Components or Display File | Raises the trace level of that process and shows dev_w<n> from /usr/sap/<SID>/<instance>/work | Reset the trace level after analysis |
SM50 shows the work processes of the instance you are logged on to; SM66 shows a global overview across all instances. With dynamic work processes (kernel 7.40 and later) the dispatcher can start and stop processes within rdisp/configurable_wp_no and rdisp/wp_max_no, so counts in SM50 can change during the day. Check every parameter and its default in RZ11 on your own release.
Recurring work process bottlenecks?
Send us an ST03 workload summary and your rdisp/wp_no_* values and we will return a reviewed sizing view.
Optional. The tool and every export work without this. No spam.
How to use it during an incident
Open SM50 on the instance users complain about, or SM66 for all instances. Count the dialog processes in status Waiting: if there are none, users wait in the dispatcher queue. Then group the busy ones: many Running with the same report points to one heavy program; many On Hold with reason RFC points to a slow called system; PRIV points to memory; DEBUG points to people. Filter this table by the code you see, read the action, and confirm with the follow-up transaction (ST22 for dumps, SM21 for the system log, SM13 for updates, SM37 for jobs). Cancel processes only after you know who owns the request.
Where the configuration lives
Work process counts are instance profile parameters, maintained in RZ10 and displayed in RZ11: rdisp/wp_no_dia, rdisp/wp_no_btc, rdisp/wp_no_vb, rdisp/wp_no_vb2, rdisp/wp_no_spo and rdisp/wp_no_enq. Operation modes (RZ04) can switch DIA and BTC counts between day and night without restart. From kernel 7.40, dynamic work processes add rdisp/configurable_wp_no and rdisp/wp_max_no, letting the dispatcher start extra processes under load. The enqueue work process exists only where the enqueue server runs inside an application instance; with a standalone enqueue server in the ASCS, there is none.
PRIV mode explained
A dialog work process normally switches between users: each user context lives in extended memory and is mapped in and out. When a user context needs more than the extended memory quota (ztta/roll_extension and related parameters), it allocates local heap memory, limited by abap/heap_area_dia. Heap memory belongs to the process, so the process is now bound to that user: status On Hold, reason PRIV. A few PRIV processes are normal for large reports; many at once can exhaust dialog capacity. Look at ST02 for extended memory usage and find the programs that drive it, usually unrestricted selections or large internal tables.
Common mistakes
Adding dialog processes when the real cause is RFC waits on another system just moves the queue. Cancelling a Running process that is in an update or a commit can leave half-finished business documents; check SM13 afterwards. Leaving trace levels raised after analysis fills the work directory. And judging capacity from one SM50 snapshot misses peaks: use the workload monitor (ST03) for history before changing counts.
Frequently Asked Questions
What are the work process types in SAP?
Dialog (DIA) for user and RFC requests, background (BTC) for jobs, update V1 (UPD) and V2 (UP2) for update modules, spool (SPO) for output formatting, and enqueue (ENQ) where the lock server runs in an application instance. Their counts are set by the rdisp/wp_no_* profile parameters.
What does PRIV mean in SM50?
PRIV means private mode: the user context used up its extended memory quota and allocated heap memory, which binds the work process to that user until the dialog step sequence ends. Check the program and user, ST02 extended memory, and parameters such as abap/heap_area_dia.
What is the difference between SM50 and SM66?
SM50 shows the work processes of the application server you are logged on to and lets you cancel or trace them. SM66 shows a global overview of active work processes across all instances of the system, which is the better first view in a multi-instance landscape.
Why does a work process show On Hold with reason RFC?
The process made an RFC call and is waiting for the reply. The cause is usually in the called system (busy work processes, long-running function module) or the connection. Check the destination in SM59, the gateway in SMGW and the work processes of the remote system.
If you want your Basis team to ask your SAP systems what is holding work processes right now, in plain English on your own servers, we can set that up.
Related Tools
SAP GUI Connection Error Codes Reference (88, 10054, 10061)
Reference for SAP GUI connection errors by layer: Windows socket codes, SAP NI layer codes, message server and logon group errors and SNC errors, with checks and fixes.
SAPSAP NetWeaver Release to SAP_BASIS and Kernel Reference
Which SAP_BASIS release belongs to each NetWeaver and ABAP Platform release, which products run on it, which kernel lines apply and how to check your own system.
SAPSAP Transport Return Codes Reference (tp RC 0, 4, 8, 12, 16)
Searchable table of SAP transport return codes and the most common RC 8 and RC 12 causes, with the import step, the log to open and the first fix.
SAPSAP HANA Monitoring Views Reference (M_ System Views)
One row per SAP HANA monitoring view with the key columns to select and the question it answers: memory, table size, disk, backups, locks, sessions and SQL.
More SAP tools
See all- SAP Transport Request Tables Reference (E070, E071, E07T)
- How to Transport Variants, SO10 Texts, Table Entries and Layouts in SAP
- SAP Gateway OData Transaction Codes Reference (SEGW, /IWFND/)
- SAP Kernel Upgrade Command Generator (Linux, SAPCAR)
- SAP ABAP Extended Memory and Heap Sizing Calculator
- SAP Gateway OData Service Activation and Transport Checklist
- SAP Solution Manager 7.2 to Cloud ALM Transition Assessment
- SAP Movement Types Reference
- SAP Purchasing Document Types Reference
Keep exploring
Free tools
- SAP NetWeaver Release to SAP_BASIS and Kernel ReferenceWhich SAP_BASIS release belongs to each NetWeaver and ABAP Platform release, which products run on it, which kernel lines apply and how to check your own system.
- SAP Security Profile Parameters ReferenceA searchable reference of the profile parameters that control SAP logon, passwords, authorization checks, RFC, gateway and audit logging.
- SAP EWM Warehouse Process Types ReferenceA searchable lookup of what a warehouse process type controls in SAP EWM, grouped by process category, with the configuration area for each setting.
ERP fixes and how-tos
- SAP Short Dump TIME_OUT: Maximum Runtime ExceededSAP TIME_OUT dumps mean a dialog process ran past rdisp/max_wprun_time. Find the real bottleneck in ST22, SM50 and ST05 instead of just raising the limit.
- How to Create a Status Profile in SAP QM (BS02)Create a user status profile in SAP QM with BS02 and assign it to quality notifications, tasks and inspection lots, with status numbers and business transaction control.