Developer ToolsFree referencePDF, Excel, Word export

SQL Data Type Mapping: SQL Server, Oracle, PostgreSQL, MySQL

Moving data between databases, or between an ERP and a data warehouse, fails most often on data types. This reference lists the common equivalents across SQL Server, Oracle, PostgreSQL and MySQL with the traps that cause silent data loss.

Download:
ConceptSQL ServerOraclePostgreSQLMySQLNote
Variable text (Unicode)
nvarchar(n)
NVARCHAR2(n)
varchar(n)
varchar(n) utf8mb4
PostgreSQL and MySQL store Unicode via the database or column encoding
Variable text (non-Unicode)
varchar(n)
VARCHAR2(n)
varchar(n)
varchar(n)
Oracle sizes are bytes by default unless CHAR semantics are set
Fixed text
char(n)
CHAR(n)
char(n)
char(n)
Padded with spaces; compare behavior differs between systems
Long text
varchar(max) / nvarchar(max)
CLOB
text
longtext
Avoid the deprecated SQL Server text and ntext types
Small integer
smallint
NUMBER(5)
smallint
smallint
Oracle has no separate integer storage types
Integer (32 bit)
int
NUMBER(10)
integer
int
Big integer (64 bit)
bigint
NUMBER(19)
bigint
bigint
Exact decimal
decimal(p,s)
NUMBER(p,s)
numeric(p,s)
decimal(p,s)
Use for quantities, prices and cost; never float
Currency amount
decimal(19,4) (or money)
NUMBER(19,4)
numeric(19,4)
decimal(19,4)
Check rounding rules and currency decimals in your ERP
Floating point (double)
float(53)
BINARY_DOUBLE
double precision
double
Approximate; unsuitable for money
Boolean / flag
bit
NUMBER(1)
boolean
tinyint(1)
Many ERPs store flags as 0/1 integers or Y/N text; map to the actual convention
Date only
date
DATE (includes time)
date
date
Oracle DATE always carries a time part to the second
Date and time
datetime2(n)
TIMESTAMP(n)
timestamp(n)
datetime(n)
Legacy SQL Server datetime has about 3 ms precision
Date and time with zone
datetimeoffset
TIMESTAMP WITH TIME ZONE
timestamptz
timestamp (stored as UTC)
MySQL has no direct zone offset type
Binary data
varbinary(max)
BLOB
bytea
longblob
Check how ERP attachments are stored before migrating
GUID / UUID
uniqueidentifier
RAW(16)
uuid
char(36) or binary(16)
Byte order differs between systems; verify matches
Auto-generated key
IDENTITY(1,1)
GENERATED AS IDENTITY (12c+) or sequence
GENERATED ALWAYS AS IDENTITY
AUTO_INCREMENT
Reseed to the max value after bulk loads
XML
xml
XMLTYPE
xml
longtext
MySQL has no native XML column type
JSON
nvarchar(max) with ISJSON check
JSON (newer versions) or CLOB
jsonb
json
Newer SQL Server releases add a native json type
Empty string
Distinct from NULL
Treated as NULL
Distinct from NULL
Distinct from NULL
A classic Oracle migration trap for required text columns
String concatenation
+ or CONCAT()
||
||
CONCAT()
In Oracle, || with NULL treats it as empty text
Current date and time
SYSDATETIME() / GETDATE()
SYSTIMESTAMP / SYSDATE
now()
NOW()
Row limit
TOP n / OFFSET FETCH
FETCH FIRST n ROWS ONLY (12c+)
LIMIT n
LIMIT n
Older Oracle versions use ROWNUM
Null replacement
ISNULL() / COALESCE()
NVL() / COALESCE()
COALESCE()
IFNULL() / COALESCE()
COALESCE is portable across all four

A planning aid, not a conversion tool. Behavior depends on version and settings (collation, character set, NLS settings, sql_mode), so test a sample load and compare row counts, control totals and edge values such as maximum lengths, zero dates and negative numbers.

Migration mapping review

We can check your ERP column mapping before a migration or reporting build. Optional.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the table

Search for the concept you need, such as date and time or currency amount, and read across to the database you are targeting. The note column flags behavior that differs even when the type names look similar. Use the export button to take the table into Excel and add your own column list, marking the source type, the target type and the transformation required for each ERP column. That becomes the core of your migration mapping document.

Where mappings go wrong

The riskiest differences are not the names but the semantics. Oracle treats an empty string as NULL, so required text fields can fail on load. Oracle DATE carries a time part, which changes how date comparisons behave. Money stored as float rounds incorrectly after many operations. Text lengths measured in bytes rather than characters truncate accented names. A flag stored as Y or N does not map to a boolean without a transformation.

  • Check empty string versus NULL handling
  • Check character versus byte length
  • Check time zone handling for timestamps
  • Check identity and sequence values after loading

Validating a mapping

Load a representative sample, not just a clean one. Include maximum length text, zero and null dates, negative numbers, very large quantities and special characters. Then compare row counts, control totals of key numeric columns, minimum and maximum dates and the count of NULL values per column between source and target. Differences point directly to the mapping that needs fixing. Keep the comparison queries so they can be run again at cutover.

ERP specific notes

Packaged ERPs often have their own conventions on top of the database types: SAP stores dates and numbers as character fields in many tables, JD Edwards uses Julian style dates, and some systems store flags and amounts in unexpected types. Always map from the ERP's data dictionary rather than from the column type alone, and prefer the vendor's supported export, API or integration layer for production moves.

Frequently Asked Questions

What is the Oracle equivalent of SQL Server datetime2?

TIMESTAMP(n) is the closest match for datetime2(n), holding fractional seconds. Oracle DATE has second precision only and includes a time part, so it suits plain datetime columns without fractions.

What is the PostgreSQL equivalent of SQL Server bit?

boolean. SQL Server bit stores 0, 1 or NULL; PostgreSQL boolean stores true, false or NULL. Cast explicitly when moving data and check how your application reads the value.

Why do my Oracle imports reject empty strings?

Oracle treats a zero length string as NULL, so a NOT NULL column fails if the source holds empty text. Replace empty strings with a default such as a single space, or relax the constraint where the business allows.

Should money use decimal or money types?

Use exact decimal with fixed scale, for example decimal(19,4), across systems. It behaves the same everywhere and avoids the rounding quirks of SQL Server money in multiplication and division.

If you are planning an ERP database migration or a read-only data layer on top of your ERP, we can review the mapping with you.