Swiss and Bar-Fed Lathe Job Setup and First Piece Checklist

Most scrap on a bar-fed job is born in the setup. This checklist walks a setup technician from paperwork and bar loading through program proving and first piece approval to the handoff to the operator.

0%

0 of 35 items complete

13 critical items still open - these are the highest-risk gaps.

Free, optional. Reopen it on any device.
Download checklist:

Paperwork and readiness

Bar stock, feeder and collet

Tooling and offsets

Program proving

First piece inspection

Handoff to run

All critical items must be complete before the first piece is approved and the operator takes over. Record any skipped item and the reason on the traveler.

Digitize setup and first piece records

Optional: we can show how to capture setup checklists against ERP jobs and trend setup time and first piece failures.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use the checklist

Work through the groups in order and tick each item as it is done. Items marked critical must be complete before the first piece is approved and the machine is released to production. Export the checklist as a record, and attach it to the job traveler. If an item does not apply, note why rather than leaving it blank, since blanks cannot be told apart from skipped steps. Review the checklist after problem jobs and add the item that would have caught the problem.

What it covers

The first group confirms the paperwork matches: drawing revision, program revision and material certificate. The second covers the bar, feeder, collet and guide bushing, which cause many Swiss problems when mismatched. The third covers tools and offsets. Program proving uses a dry run and single block cut before cycle start. First piece inspection covers all dimensions and a second piece after thermal stabilization. The last group hands off inspection frequency and reaction limits.

Linking it to your quality system

A setup checklist supports the control of production processes expected by quality systems such as ISO 9001 and AS9100, where first article or first piece verification is part of the process. It is not a replacement for a formal first article inspection when a customer requires one, such as AS9102 for aerospace. Keep the completed checklist with the job record so you can show what was checked on the day.

Common mistakes

The most expensive mistake is releasing the machine after one good part and no second check, because thermal growth and tool wear show up after the machine warms up. Another is changing the program at the machine without saving a new revision. A third is leaving the reaction plan vague, so the operator does not know when to adjust and when to stop. If your ERP tracks setup time, record the actual setup so future quotes use real numbers.

Frequently Asked Questions

What is the difference between first piece and first article inspection?

First piece inspection is an internal check that a setup makes good parts. First article inspection is a formal, documented verification, often required by the customer, such as AS9102 in aerospace. A first piece check may feed into an FAI but does not replace it.

How many parts should be measured at first piece?

At least one part for all dimensions, and preferably a second after the machine stabilizes. Many shops measure a short run of parts for critical features to confirm the process is stable before releasing it.

Why check the guide bushing and collet?

A worn or wrong-size guide bushing or collet causes taper, chatter, bar marks and size drift on Swiss machines. They are a common hidden cause of size problems that look like tool wear.

Can I customize the checklist?

Yes. Treat it as a starting point and add machine-specific steps, customer requirements and lessons from past scrap. Remove steps that do not apply to your machines rather than skipping them each time.

If setup and first piece records live on paper, Netray can help bring them into your ERP job record so they can be searched and trended.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

Guides

AI on your ERP