SyteLine 10 Keyboard Shortcuts: Printable Cheat Sheet
This SyteLine 10 keyboard shortcuts cheat sheet lists the keys that save the most time: filter in place, run the filter, save, and moving through fields and windows. Search it, print it for the desk, or export it to Excel for training material.
| Area | Keys | What it does | Source | Tip |
|---|---|---|---|---|
Filter | F4 | Switch the form into filter in place mode | SyteLine | Type criteria in the fields, then run the filter |
Filter | F5 | Run the filter and retrieve matching records | SyteLine | Use % style wildcards where the field supports them |
Filter | Esc | Back out of the field or cancel the pending edit | Windows | Check what you are cancelling before pressing |
Save | Ctrl+S | Save the current record or form changes | SyteLine | Save before moving to another record in a grid |
Help | F1 | Open help for the current form | Windows | Form help lists the fields and related forms |
Navigation | Tab | Move to the next field | Windows | The tab order follows the form design |
Navigation | Shift+Tab | Move to the previous field | Windows | Faster than clicking back to correct an entry |
Navigation | Enter | Confirm an entry or activate the default button | Windows | In a multi-line text field it adds a line |
Navigation | Page Up / Page Down | Move up or down a page in a grid or list | Windows | Use in large lists such as item or order browse |
Navigation | Home / End | Go to the start or end of a field or row | Windows | Ctrl+Home and Ctrl+End jump to the first or last row in a grid |
Navigation | Arrow keys | Move between rows or cells in a grid | Windows | Hold Shift to select several rows |
Windows | Alt+Tab | Switch between open applications | Windows | Useful when you run reports and spreadsheets side by side |
Windows | Ctrl+F4 | Close the current child form window | Windows | Applies when forms open inside the main window |
Windows | Ctrl+Tab | Switch to the next open form window | Windows | Keeps you off the mouse during order entry |
Windows | Alt+F4 | Close the active application window | Windows | Save first; this closes the application |
Menus | Alt + underlined letter | Open a menu or press a labelled button | Windows | Letters are underlined on menus and buttons |
Edit | Ctrl+C | Copy the selected text or cell | Windows | Works in most fields and grids |
Edit | Ctrl+V | Paste text into the field | Windows | Check the format when pasting dates and numbers |
Edit | Ctrl+X | Cut the selected text | Windows | Use with care in key fields |
Edit | Ctrl+A | Select all text in the field | Windows | Select, then type to replace |
Edit | Ctrl+Z | Undo the last edit in a text field | Windows | Does not undo a saved record |
Rows marked SyteLine come from the SyteLine client; rows marked Windows are standard Windows behaviour that works in most forms. Shortcut sets can differ between SyteLine versions, client types and your administrator's setup, so confirm the keys that matter most in your own environment and check the in-product help for your release.
SyteLine training sheet pack
Want this cheat sheet extended with your own forms and a quick-start guide for new users? Optional, the list is free to use as is.
Optional. The tool and every export work without this. No spam.
How to use the cheat sheet
Use the search box to find a key or an action, then print or export the list. The Source column separates shortcuts that belong to SyteLine from general Windows keys that also work there, so trainers can teach the SyteLine-specific ones first. Start with filter in place, since that is the shortcut most users get the most benefit from.
Filter in place: the shortcut worth learning first
Most SyteLine forms retrieve records using filter in place. Press F4 to enter filter mode, type your criteria in one or more fields, then run the filter with F5 to load matching records. This is much faster than scrolling or clicking through lists, particularly for customer orders, items and purchase orders. Practise on a form you use daily, such as Customer Orders or Items, until the F4, type, F5 sequence is automatic.
- F4 to enter filter mode
- Type criteria in one or more fields
- F5 to run the filter
- Ctrl+S to save changes to the record
Keeping hands on the keyboard
Data entry speed comes from combining Tab and Shift+Tab to move through fields, Ctrl+Tab to switch forms, and Alt with an underlined letter for menus and buttons. Teach new users the tab order of the forms they use most, because it follows the form design and rarely changes. For high-volume entry such as order lines or inventory transactions, a user who avoids the mouse can cut entry time noticeably.
Limits and what to verify
Shortcut behaviour can vary by SyteLine or CloudSuite Industrial release, by client (the Windows client and the browser-based experience differ), and by custom forms. This sheet covers the common keys; if a key does nothing in your system, check the help for your version or ask your administrator. Add your own site-specific shortcuts to the exported copy.
Frequently Asked Questions
What is the SyteLine filter in place shortcut?
Press F4 to put the form into filter in place mode, enter your criteria in the fields, and press F5 to run the filter and retrieve the records. This is the standard way to search on most SyteLine forms.
How do I save a record in SyteLine with the keyboard?
Use Ctrl+S to save the current record or form changes. You can also use the Save button on the toolbar. Save before moving to another record in a grid so you do not lose the edit.
Do SyteLine 10 shortcuts work in CloudSuite Industrial?
Most of the common keys carry over because CloudSuite Industrial is the same product family, but the browser-based client can behave differently from the Windows client. Test the keys you rely on and check the help for your release.
Can I customise SyteLine keyboard shortcuts?
Some behaviour can be changed by an administrator or through form customisation, but the standard keys are fixed. Document any site-specific changes so trainers and users share the same cheat sheet.
If your team spends time searching SyteLine for answers, Netray can add a private, read-only AI layer that answers in plain language from your SyteLine data on your own servers.
Related Tools
SyteLine Go-Live Readiness Checklist
Thirty expert checks across data, testing, people, technical, and cutover workstreams to tell you whether your SyteLine go-live is actually ready.
Infor SyteLineSyteLine MRP Health Check
Diagnose why your SyteLine MRP output is noisy or ignored, scoring data accuracy, parameters, and planner behavior across ten dimensions.
Infor SyteLineSyteLine Customization Technical Debt Scorer
Measure how much upgrade drag, risk, and maintenance cost your SyteLine customizations have accumulated, and learn where to pay it down first.
Infor SyteLineSyteLine License Optimization Calculator
Compare licenses owned against actual usage to estimate how much of your annual SyteLine spend could be recovered through rightsizing.
More Infor SyteLine tools
See all- SyteLine Implementation Cost Calculator
- SyteLine to CloudSuite Upgrade Cost Estimator
- SyteLine Version End-of-Life Risk Assessment
- SyteLine Downtime Cost Calculator
- SyteLine Integration Complexity Calculator
- SyteLine Consultant Cost Benchmarker
- SyteLine AI Integration Readiness Assessment
- SyteLine Job and Order Status Codes Reference
- SyteLine Form Personalization Checklist
New to Infor SyteLine? Start with the Infor SyteLine guide and toolkit, or plan with Training Path Builder, ERP Certification Study Planner, Upgrade Path Planner.
Keep exploring
Free tools
- Infor M3 H5 Hot Keys and Function Keys ReferenceKeyboard shortcuts for M3 programs in the H5 client: function keys, list options, paging, and the Mac setting that makes them work.
- SyteLine 8/9 to 10 Technical Upgrade ChecklistThe technical steps for moving an on-prem SyteLine 8.x or 9.x system to SyteLine / CSI 10, from customisation inventory to rehearsal and rollback.
- SAP Basis Transaction Codes Cheat SheetA searchable reference of the SAP Basis, security and system administration transaction codes you use every week, grouped by area.
ERP fixes and how-tos
- SyteLine or CloudSuite Industrial: how to decide in 2026How CIOs on Infor SyteLine should decide between staying on-prem, moving to CloudSuite Industrial, or holding at the current version in 2026. Practical decision framework.
- SyteLine FormScripts, validators, personalization and bookmarksA practical intro to SyteLine FormScripts and validators, plus personalization and bookmarking options, with guidance on when each is the right tool.
Guides
- SyteLine 10 to CloudSuite Industrial MigrationMigrate from SyteLine 10 on-premise to CloudSuite Industrial cloud. Customization assessment, cloud readiness, and zero-downtime migration methodology.
- CloudSuite Industrial 10 to 11 Migration GuideStep-by-step migration guide for upgrading Infor CloudSuite Industrial (CSI) from version 10 to 11, including ION integration, form updates, and testing.
- SyteLine 8 to SyteLine 10 Upgrade GuideSyteLine 10 upgrade guide for SyteLine 8 sites: architecture changes, customization remediation, data migration and testing cycles before go-live.
AI on your ERP
- AI for Infor SyteLine and CloudSuite IndustrialAdd grounded AI to Infor SyteLine or CloudSuite Industrial: natural-language answers, agents over IDOs and ION, on-prem or CloudSuite deployment.
- On-Prem AI for CloudSuite Industrial, Without the Multi-Tenant Cloud MoveAdd generative AI to CloudSuite Industrial without moving to Infor's multi-tenant cloud. On-prem private LLM options for CSI, with governance and audit built in.
Software
- Infor SyteLine (CloudSuite Industrial)Independent guide to Infor SyteLine (CloudSuite Industrial): modules, IDO and Mongoose integration, deployment, strengths, limits and alternatives.
- Epicor KineticEpicor Kinetic explained for manufacturers: modules, REST API, BAQs, deployment, strengths, limits and alternatives to compare before choosing or upgrading.