Engineering & PLMFree calculatorPDF, Excel, Word exportSiemens Teamcenter

Teamcenter AI Assistant Sizing and Value Calculator

This calculator estimates what a private AI assistant on Teamcenter needs in GPUs and index storage, and whether time saved covers the cost. Change the inputs and watch the chart.

Your numbers

users
30 %

Share of named users who ask at least one question on a given day.

Retrieval context makes prompts long. 2,000 to 6,000 is common.

$/h
$/GPU/month

Lease, depreciation or colocation equivalent per GPU.

Batched throughput for your model and GPU. Measure it, do not trust a brochure.

$

Your results

GPU estimate
2
Assumes about 25 tokens per second per concurrent stream. The model footprint sets the floor.
Monthly value
$151,200
Daily active users
120
Questions per day
960
Tokens per day
3,360,000
Peak concurrent requests
1.3333
Assumes 25% of daily questions in the busiest hour and about 20 seconds per answer.
Vector index size
18
Assumes 2 chunks per page and about 6 KB per chunk including vector and metadata.
Hours saved per month
2,016 hrs
Monthly GPU cost
$4,400
Simple payback
0.4 months
Zero means monthly value does not exceed GPU cost.

Planning estimate only. Hours saved depend on adoption and are the least certain input. Validate throughput with your own model before buying hardware.

Free, optional. Reopen it on any device.
Save results:

Monthly value vs GPU cost by named users

Sweeps Named users from 50 to 2000, holding your other inputs fixed.

Sizing review with a pilot plan

Optional: share your inputs and get a short review with a pilot measurement plan.

Optional. The tool and every export work without this. No spam.

Was this tool useful?

How to use it

Start with named users and the share that is active on a typical day. Adjust questions per user to match what a pilot shows. Enter your real GPU cost and a measured tokens-per-second figure. The primary results are the GPU estimate and monthly value.

Formulas and assumptions

Daily questions equal named users times active share times questions per user. Peak concurrency assumes a quarter of daily questions fall in the busiest hour and each takes about 20 seconds. GPUs equal the larger of the model floor and peak concurrency times 25 tokens per second divided by GPU throughput. Index size assumes two chunks per page at about 6 KB each.

  • Hours saved = questions x minutes saved / 60 x 21 working days
  • Value = hours x loaded hourly cost
  • Payback = one-off cost / (value minus GPU cost)

Reading the result

At small scale the model's memory need, not throughput, sets the GPU count, so the estimate stays flat as users grow and then steps up. The chart shows where value overtakes cost. If payback is long, test whether saved minutes per question are realistic before cutting scope.

Common mistakes

Using vendor peak throughput instead of batched, measured throughput, and counting every named user as active. Also remember that retrieval makes prompts long, which raises tokens per question far above chat defaults.

Frequently Asked Questions

Why does the GPU count not rise smoothly?

A large model needs a minimum number of GPUs just to load. Until peak load exceeds that hardware's throughput, extra users add no GPUs, then capacity steps up in whole GPUs.

What tokens per second should I enter?

Use a measured aggregate figure for your model, quantisation and context length under concurrent load. Ranges from several hundred to a few thousand tokens per second per GPU are common.

Are the time savings reliable?

They are the weakest input. Take minutes saved from a pilot with timed tasks, then apply a haircut for adoption before presenting a business case.

Does it include power and staff?

Only if you fold them into the GPU monthly cost and the one-off cost. Add admin time, power, cooling and support to be realistic.

If you want these numbers checked against your Teamcenter estate and a pilot plan, Netray can run that review. The calculator works without it.

Get ERP alerts and new tools

Support deadlines, release changes and new free tools for the ERP you run. A couple of emails a month at most.

Free. Unsubscribe with one click from any email.

ArchRay builder
Design the on-prem AI stack: model, GPUs, RAG pipeline, guardrails
See memory, speed and cost as you swap parts, then export the diagram. Free, in your browser.
Open the builder

Keep exploring

Free tools

ERP fixes and how-tos

AI on your ERP

Software