Bid/No-Bid Scorecard and Expected Value Calculator

Every quote costs estimating time, and most quotes are lost. A bid/no-bid decision weighs whether the job fits the shop and whether the expected payoff covers the effort. This calculator combines a weighted scorecard with a simple expected value model.

Your numbers

4

5 = core process and material, 1 = outside our capability.

3

5 = open capacity at the needed ship dates.

3
4
3

Consider penalty clauses, tooling exposure, tolerance difficulty and payment terms.

$
%
25 %
h
$/h

Your results

Weighted bid score
69%
Weights: fit 30, capacity 20, margin 20, customer 15, risk 15. Above about 70 usually means bid.
Expected value of bidding
$5,300
Win probability times gross margin, less the sunk cost of quoting. Negative means the bid loses money on average.
Cost to prepare the quote
$650
Estimator hours multiplied by loaded hourly cost.
Gross margin if won
$23,800
Break-even win probability
2.7%
Win probability at which expected value is zero.
Expected value per quoting hour
$530

Expected value uses gross margin, not net profit, and ignores capacity opportunity cost and relationship value. Treat it as one input to the bid decision.

Save results:

Expected value vs win probability

Sweeps Estimated win probability from 5 to 80, holding your other inputs fixed.

Calibrate win probability from your own quote history

Optional: send us a quote export and we will outline how to derive hit rates by customer and family.

Optional. The tool and every export work without this. No spam.

How to use it

Rate the five criteria from 1 to 5, enter the order value and your realistic gross margin, then estimate win probability honestly. Use your own trailing hit rate for similar work as the starting point rather than optimism. Enter the hours the quote will take and your loaded estimator cost. The weighted score tells you whether the job fits, while the expected value shows whether the economics justify the effort. Slide the win probability and watch the chart to see how sensitive the decision is.

The formulas

Weighted score = (fit x 30 + capacity x 20 + margin x 20 + customer x 15 + risk x 15) / 5, expressed as percent. Expected value = P(win) x (order value x gross margin %) minus quote cost, where quote cost = hours x loaded rate. Break-even probability = quote cost / gross margin dollars. This is the standard expected monetary value approach used in decision analysis, with the quoting cost treated as a sunk cost incurred whether or not you win.

  • Score measures fit, expected value measures economics.
  • Low score plus positive EV: bid only if capacity is idle.
  • High score plus negative EV: reduce quoting effort or decline.

Reading the results

With the defaults, gross margin is 23,800 dollars, quote cost is 650 dollars and a 25 percent win chance gives a positive expected value of about 5,300 dollars. The break-even probability is under 3 percent, so the economics are comfortable. The same RFQ on a 4,000 dollar order would flip the picture: margin of 1,120 dollars against 650 dollars of quoting cost needs a 58 percent chance just to break even.

Common mistakes

People overestimate win probability for RFQs sent to many shops. Use your hit rate by customer type, not your best case. Another error is ignoring capacity: a profitable quote that lands during a full backlog displaces better work. Finally, do not use this for blanket orders without annualizing value and adjusting for ramp.

Frequently Asked Questions

What win probability should I use?

Start with your trailing hit rate on similar quotes, measured by count and by value. Typical job shops see single digit to 30 percent depending on market and RFQ source. Adjust up for repeat customers and down for open competitive bids.

Why use gross margin instead of price?

Price is revenue, not payoff. The shop only keeps the margin after materials, labor and outside processing. Using margin in the expected value formula makes the comparison against quoting cost honest.

What is a good bid score threshold?

Many shops use about 70 percent as a bid line, 50 to 70 as bid with conditions, and under 50 as decline. Calibrate by checking which past scores turned into profitable jobs.

Does this replace formal bid reviews for large programs?

No. Large defense or aerospace programs need capture planning, flow-down review and financial approval. Use this as a quick screen for routine RFQs and as supporting input for bigger reviews.

If you want hit rate by customer and part family pulled straight from your ERP quote history, we can help build that. The calculator itself needs no data from us.

Keep exploring

Free tools

ERP fixes and how-tos

Runs with your ERP

Guides

AI on your ERP

Integrations

Comparisons

Software